I've actually been meaning to do a bit of an update for Fort Frances
Current projects:
Fort Frances Library and Technology Centre:
South Entrance
South Side
East End
Interior
The original architectural drawings are available
here (Powerpoint format)
Size: 13,622 sq ft
Project Cost: $4.7 million
Funding:
FedNor: $170,000
Building Canada: $1.967 million
Ministry of Culture: $1.6 million
Northern Ontario Heritage Fund: $440,000
Corporate Donations: $175,000 (Shaw Communications)
Individual Donations (Building for the Future Campaign): $850,000
Location: Second Street East at Reid Avenue, adjacent to the Memorial Sports Centre).
Completion: June 2010
Robert Moore School Reconstruction
Additional photos available
here
Size: 51,000 sq feet, 2 stories
Project Cost: $9.8 million
Classrooms: 10 junior/intermediate classrooms, 7 primary classrooms, 4 JK/SK classrooms
Accommodates 480 students
Completion: Fall 2010
Funding: Rainy River District School Board, Ministry of Education
Location: Third Street between Crowe Ave and Armit Ave
[b]Heritage Tourism Project Phase II
Hallett/Lookout Tower relocation
This project involved relocating the former Natural Resources lookout tower, and the Hallett logging boat from Pithers Point Park to Laverendrye Parkway, at the Sorting Gap Marina.
View from the relocated tower:
You can see the Hallett's new home at the top of the pic, just past the marina docks.
New street signs were installed in December
New interpretive panels along the waterfront, and wayfinding banners will be installed in the spring.
Nodin Causeway rehabilitation
The Causeway is a 12km long series of island hopping bridges just east of Fort Frances. 2010 will be year 2 of a 5 year rehabilitation of the main bridge span. The project will widen the bridge and enhance views of Rainy Lake while extending the life of the bridge.
Completed Projects
St. Mary's Roman Catholic Church expansion
Architectural drawing:
Boston Pizza
I will have to get some pics of the completed buildings.
Proposed projects
Laverendrye Parkway Village
There's nothing much to report on this front. It's a 3 story waterfront condo project with 24 total units, next to the existing River Walk condo development. 1/3 of the units had been pre-sold as of last summer, but not much has been said since. It's still an empty lot with a sign.
Treaty Three Police Service Couchiching Detachment
T3PS is slated to get a new detachment building for their Couchiching Sub-Division. Currently the operate out of the OPP Detachment in Emo, and house prisoners at the OPP Fort Frances Detachment.