^Not enough land I think, plus I don't think buses are allowed on Colonel By. Also the Conference Centre is pretty good, should be spruced up with a second tunnel to the Rideau Centre/Sheraton, a full kitchen and some internal upgrades, but it serves its function well.
Reply With Quote
     
     
  #3022  
Old Posted Jan 18, 2010, 12:29 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
How about running the buses along the Nicholas until Daly?

__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #3023  
Old Posted Jan 18, 2010, 5:59 PM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
Quote:
Originally Posted by Sir.Humphrey.Appleby View Post
^Not enough land I think, plus I don't think buses are allowed on Colonel By. Also the Conference Centre is pretty good, should be spruced up with a second tunnel to the Rideau Centre/Sheraton, a full kitchen and some internal upgrades, but it serves its function well.
If there is too little space, then what's stopping them from establishing a new bus station downtown somewhere near Bayview in LeBReton Flats? Hell, New York has theirs underground for pete's sake and it's huge. You mean to tell me we couldn't even attempt something similar?
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
Reply With Quote
     
     
  #3024  
Old Posted Jan 18, 2010, 8:56 PM
danny the dog's Avatar
danny the dog danny the dog is offline
Registered User
 
Join Date: Sep 2009
Posts: 43
I know that in Madrid and a few other cities in Spain, the bus terminal buildings are above ground but all the bus parking and arrival/departure gates are underground. It just makes a lot more sense to do it that way and god knows we need a new bus terminal.
Reply With Quote
     
     
  #3025  
Old Posted Jan 18, 2010, 9:38 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,634
Quote:
Originally Posted by Jamaican-Phoenix View Post
If there is too little space, then what's stopping them from establishing a new bus station downtown somewhere near Bayview in LeBReton Flats? Hell, New York has theirs underground for pete's sake and it's huge. You mean to tell me we couldn't even attempt something similar?
Out by the Via station is much more accessible from the Highway than in the flats. Using valuable land for the bus station would be pretty stupid (talking as someone who has used the Greyhound station before) aswell.
Reply With Quote
     
     
  #3026  
Old Posted Jan 19, 2010, 12:49 AM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
Quote:
Originally Posted by Sir.Humphrey.Appleby View Post
Out by the Via station is much more accessible from the Highway than in the flats. Using valuable land for the bus station would be pretty stupid (talking as someone who has used the Greyhound station before) aswell.
It's not always about accessibility but being near downtown as well. That's something I've seen in a LOT of cities which to me tells me they're on to something.

And valuable land? You mean the land that's being developed at a snail's pace and is slated mostly for beige condos and townhouses?

And hey, I've used the Greyhound station at least 40 times in the past two years.
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
Reply With Quote
     
     
  #3027  
Old Posted Jan 19, 2010, 4:49 AM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Weird.
__________________
Francois

Last edited by Franky; Jan 19, 2010 at 2:10 PM.
Reply With Quote
     
     
  #3028  
Old Posted Jan 19, 2010, 2:42 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by lrt's friend View Post
I am arguing exactly for that, but you paint it in such a negative way. It is really a rationale transition from the existing Transitway system to LRT. You know, Calgary still has direct to downtown bus routes from the north end and to the west end where there is no LRT service at present and it makes no sense to impose a LRT transfer very close to downtown. It is also not only about the express bus routes but also the impacts on local service during off-peak hours. How awkward will it really be to get to downtown? One of the selling points for LRT is that it will enable a more lively downtown. Well, that will not be the case if we make it difficult to use transit to get downtown before LRT has a reasonable build out. We need a better thought out transitional plan instead of some unnecessary mega transfer station at Tunney's Pasture that will not be needed once the western leg is built.



We simply need a more customer oriented transitional transit plan. Don't try to remove all the suburban buses from downtown when we are initially only building a short LRT line. The reduction of downtown buses should happen gradually as LRT is extended in each direction. It is laughable that the reason for running Phase 1 to Tunney's Pasture was because it was an employment centre. There were clearly other agendas here in order to try to force the Ottawa River Parkway route and to block western buses from reaching downtown. I have really been fed up with how this plan was pre-determined and how the public consultations were designed to just rubber stamp what had already been decided with no intention to ever significantly change the plan based on public input. This has been such a turn off for me personally, that it will be a long, long time before I ever attend such a meeting again. My own personal interaction with the mayor at one of those meetings just emphasized that we had elected a mayor who didn't know what he was talking about.



We think more alike than you realize. My fear is that this plan will not achieve the desired 30% modal share unless we luck into it because of external factors, such as $3.00 per litre gas prices. I said early on that this plan delivers very little new rapid transit within the Greenbelt. Almost our entire investment within the Greenbelt will be used to address the downtown congestion issue, which forces existing rapid transit to be re-built. We do get Baseline BRT and Carling LRT very late in the timeframe, but you can bet that those will be the first to be cancelled if costs escalate higher than expected. It is very possible that our 2031 rapid transit network within the Greenbelt will be identical to today, just delivered by rail instead of buses. After billions of investment, it may be no easier or faster to move around the city inside the Greenbelt by transit.

Another interesting news story on Global at suppertime. Many concerns were brought up about the St. Clair streetcar in Toronto, which is the model for the rest of the Toronto Transit City LRT plan. The St. Clair streetcar is taking far longer to build and costs have continued to escalate even after construction began to the point that costs have almost doubled. This demonstrates that it is very hard to contain costs on rail transit and any other form of grade separated transit. I include busways here as well.
I agree with this assessment. Even though my preference is for a more advanced transit solution, a BRT system for Ottawa is the best vanilla solution. Capital costs are lower, service is better and there is more flexibility. Express buses are possible, trunk and feeder at peak times only or even partial trunk and feeder configurations are possible.

We need to get away from the idea that we have to blow as much gov't money as possible and focus on what is needed/wanted for all aspects of the city and get our share of tax revenue. Projects designed to soak up money (are they called pork barrel?) make no sense. Also, building our transit system in a certain way just because other cities do it that way is also silly. History differs (BRT wasn't an option), geography (no green belt), population and affluence also differ.
__________________
Francois
Reply With Quote
     
     
  #3029  
Old Posted Jan 19, 2010, 3:12 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,634
^ A BRT tunnel(s) is of course the best solution to help transit, but it still doesn't deal with the the bitter pill of operating budgets, which will just get progressively more crippling as the system grows. LRT is the spoon full of sugar that helps the medicine go down. It should reduce operating expenses enough so that collector routes should be able to be maintained (not knowing of course how much the tunnel will cost to maintain, since that is unique to each project).
Reply With Quote
     
     
  #3030  
Old Posted Jan 19, 2010, 3:30 PM
Ottawan Ottawan is offline
Citizen-at-large
 
Join Date: Aug 2009
Location: Expat (in Toronto)
Posts: 738
Quote:
Originally Posted by Franky View Post
Projects designed to soak up money (are they called pork barrel?) make no sense.
You're thinking of good old-fashioned "make-work" projects. Pork-barreling is when projects seemingly unrelated on the face of them are all included as part of the same one mega-project (or in fact, usually law) so that they all are passed because local politicians cannot afford to vote against the part their constituents want. So pork-barreling in this context would be something like including the cost of a pretty park in a part of the city not getting transit as part of the transit plan. Or maybe like including the cost of moving the Greyhound station as part of a rapid transit network?
Reply With Quote
     
     
  #3031  
Old Posted Jan 19, 2010, 4:00 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
I do agree that Kanata and Barrhaven should still have direct-to-downtown express buses and Transitway service to downtown from the west until the LRT is extended at least to Baseline. At that stage, locals would extend to the LRT like with Orleans (Orleans locals should be extended to Blair due to the relatively short distance).
Reply With Quote
     
     
  #3032  
Old Posted Jan 19, 2010, 7:49 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Sir.Humphrey.Appleby View Post
^ A BRT tunnel(s) is of course the best solution to help transit, but it still doesn't deal with the the bitter pill of operating budgets, which will just get progressively more crippling as the system grows. LRT is the spoon full of sugar that helps the medicine go down. It should reduce operating expenses enough so that collector routes should be able to be maintained (not knowing of course how much the tunnel will cost to maintain, since that is unique to each project).
I suppose if fewer people use transit because of the extra transfers and longer transit times, operating expenses will go down. Somehow I doubt we would see significant savings because, our trains will have to be air-conditioned/heated and will have to run on frequent schedules. Our unions will probably see that workers get fair wage and accommodations. The sections of LRT will replace BRT corridors which are probably more efficient at moving people than collector/feeder buses and so the cost savings might be over-estimated.

If the past is any indication of the future, promises to save money end up in lawsuits, misspending and cost overruns.

Another example of pork-barrelling would be to purchase Union station as a subway entrance I guess.
__________________
Francois
Reply With Quote
     
     
  #3033  
Old Posted Jan 19, 2010, 8:20 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,634
^ The former suburb collectors that go downtown right now will no longer, so less buses will be able to provide higher frequency. The buses will be less delayed by congestion since they aren't going downtown.

The main cost of any system is still the drivers. 1 driver for 4 LRT cars = a lot less than 1 for 1 articulated bus for same capacity.

Savings will be earned not only from the pure transitway buses, but community buses that travel further than the current planned ends of the LRT.

There might be a bit of a lag until savings builds up, due to union agreements, but usually if there is 'lack of work' the union can't do squat to stop it. Plus, since if OC Transpo went on strike over the new work plan since the LRT is a new facility you could hire people to run it without breaking labour laws. I think they would much rather have their senior drivers promoted to LRT drivers, with enclosed cabs, a section of automated running, than left out driving the buses.
Reply With Quote
     
     
  #3034  
Old Posted Jan 19, 2010, 11:32 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Plus, since if OC Transpo went on strike over the new work plan since the LRT is a new facility you could hire people to run it without breaking labour laws.
Something tells me that this will not be the case.
Reply With Quote
     
     
  #3035  
Old Posted Jan 19, 2010, 11:59 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,634
Quote:
Originally Posted by lrt's friend View Post
Something tells me that this will not be the case.
Yeah, I don't think they will strike. Most of the labour reduction will hopefully be by attrition.
Reply With Quote
     
     
  #3036  
Old Posted Jan 20, 2010, 1:59 AM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
It's not always about accessibility but being near downtown as well.

The Via Rail station seems like it is a long way from downtown but in the long term it will become part of downtown. Accessibility helps limit the impact of distance on its location. Having a combined rail, bus and transit station increases ridership for each of the modes because of the convenience that arise from the ease of interconnections between each type of transport. Unfortunately as previous posts have said there is no suitable land downtown for a bus station other than Le Breton Flats and it suffers from its inaccessabilty from the Queensway.
Reply With Quote
     
     
  #3037  
Old Posted Jan 20, 2010, 9:07 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
the City has the Western Corridor LRT EA site up

Not much info yet, but here's the study area

Reply With Quote
     
     
  #3038  
Old Posted Jan 22, 2010, 8:59 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,678
OK, a silly question:

Why is the Confederation Station symbol CH on the above map? I can immediately see the rational of other symbols (TP=Tunneys Pasture, HE=Heron, etc.), but not CH. As far as I can think, CO wouldn't be used for other stations, would it?

OK, two questions, actually: There is also BR for Bayview. Why not BV?

I know these are really picky things, but it indicates to me the level of logic that is being used.
Reply With Quote
     
     
  #3039  
Old Posted Jan 22, 2010, 9:03 PM
gjhall's Avatar
gjhall gjhall is offline
Registered User
 
Join Date: Aug 2009
Location: Ottawa
Posts: 1,297
CH = Confederation Heights
Reply With Quote
     
     
  #3040  
Old Posted Jan 22, 2010, 9:14 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,678
Quote:
Originally Posted by gjhall View Post
CH = Confederation Heights
Ah, of course. I should have gotten that from the map. What about BR?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.