Quote:
Originally Posted by lrt's friend
I am complaining because they are going to eliminate direct to downtown bus service to the south and west when there is no significant LRT service in those directions during Phase 1 or Increment 1 or whatever they choose to call it. Calgary did not do this. This is a crap rationalization plan!! The planners don't give a rat's ass whether the results will be convenient to the customers. All I can say, I am glad I don't need to go downtown very often.
As far as the improved experience, hmmmmm, won't most passengers have to stand especially during peak periods on those trains? Not saying there will be an alternative, but this is oversold. It is not like you are sitting back reading a book like you can do on a Go Train.
Here will be my LRT experience
1. Walk to a station downtown
2. Ride the Escalator down 10 storeys
3. Wait for the train
4. Stand on the Train
5. Walk to the bus stop at Hurdman
6. Wait for the bus
7. Stand on the Transitway bus
8. Transfer at South Keys
9 Wait for a local bus (the rationalization plan as proposed will cut local service in half)
10. Walk home (the walk will be much longer after the proposed rationalization plan)
I am jumping for joy because this is going to be so much better. Whoopee!!!
Is it no wonder why I am not sold on what we are doing? Also, with an aging population, all this standing is going to make transit less and less attractive.
|
So you're arguing in favour of a transit system that provides point-to-point service for some, and multiple transfers for others. Must be nice to be one of the lucky few.
Taking a step back for a second, congestion is requiring a reconfiguration away from the 'express buses to/from downtown' system design. That's going to require more transfers and more waiting. That's not an LRT problem. It's a growth problem.
Having to split your transitway time between LRT and buses IS a result of the LRT conversion, but what is the alternative? Building the whole system at once? Never doing LRT at all?
Personally, I would have liked the city to take a different approach to the rollout. Build a modest commuter rail system on existing rail lines, connect it to an LRT-converted O-train, and extend that to Ottawa U via a tunnel. For me, the big benefit is that when you start converting the BRT sections of the Transitway, you'll have a viable preliminary LRT system to handle a fair share of the suburban passenger load while the Transitway is unavailable (Nepean, Barrhaven, Kanata, Southern Ottawa) or you'll have a highway that you can put the BRT buses on temporarily while you convert (417/174).
There are hundreds of millions of dollars in the current plan devoted to managing the absolute chaos that will be generated during the construction years by having no Transitway at all in many places. I know that a little over a year ago, city councillors had been told that BRT-to-LRT conversion would be relatively easy and BRT operations would continue during the construction. That's bullshit.
I shudder to think what the service quality will be like during construction, when we have neither BRT nor LRT to downtown. I'd rather build a basic 'bypass' transit system, on secondary paths (not the ones we'd choose for our primary lines) and then convert the Transitway, starting with the eastern section. At the end of the day we'd be providing LRT to the entire city faster, and cheaper, followed by BRT conversion to LRT.
That's what I would have done. I think it would have been cheaper and provided better service throughout. And investments in BRT like the Fallowfield to BTC stretch and Moodie to SBP would never even be considered for BRT. They'd be LRT extensions right from the start.
Given that the city's goal is to drive the transit use figures from 23% to 30%, and given that growth-driven congestion will drive a change in the network configuration, service level degradation is inevitable in the short term. The question is whether we can come up with a sustainable LRT solution that eventually provides better service, at an affordable price.