And here is what I had to say:
I would highly debate that subways are unattractive to attracting new riders, And if you hate subways so much, then lets go with elevated skytrain along Broadway.
The only reason I take skytrain, and along with almost everyone I know, is because it is fast and frequent. There is a huge reason why the most used LRT systems in North America are primarily grade separated. What street grade LRT is good for, is local service involving trips under a few KM, not cross regional! That is where metro/ALRT/heavy rail comes into use, such as skytrain to UBC.
If they do not attract new riders than how come many people I know want to see more Park and Rides at skytrain stations so they can finally take the train to work and downtown? Face it, on a day in and day out practice speed and frequency is important.
I also noticed you failed to mention that skytrain’s fatality rate is due to suicides. there has never been a fatality due to a train accident. Street grade LRT systems have to deal with suicides and accident fatalities! Again, you also forgot how to mitigate car accidents that do not involve the trains themsleves, but block the rails.
Also, please tell me your solution about the short blocks along Broadway, this limits train lengths (for trains can not block intersections at a station) therefore reducing capacity.
Again, I support LRT to the Valley, for i think LRT can work in the Valley because there is lots of land to build at grade rails for cheep that do not run along roadways (again, this would make it more akin to a heavy rail) at the prices you are listing. But LRT down Broadway, no thanks, if LRT is built there, and it means I have to do an extra transfer from skytrain to LRT (that would likely have a much less frequent schedule) to travel only slightly faster than the current B-line, I think I will stick with driving my car there. At least then I can circumnavigate accidents and listen to my stereo system.
Many European cities are now concentrating on LRT systems because they have fully built metro systems! And in fact, are still expanding on their metro systems in many cities. Layers, LAYERS!
And the price for urban LRT with the speed and capacity of skytrain will be a similar price as skytrain itself.
As I said before, Calgary’s next LRT expansion is going to coast 700 million for 8km. hmmmmm, that seems a little more than 25 mil per km. (and this does not include the construction of an OMC)
And as for ridership, here are some new examples of new, primarily street grade LRTs in NA.
Houston – 12km, daily ridership of 39,500. And, from Jan 1 2004 to April 15, 2006 (only a year and a quarter) there were 129 accidents!
Seattle – 27.8 km (with a price tag similar to the Canada Line I believe) has a daily ridership of 16, 200! Tacoma’s small separate section, only 3,900 a day!
Phoenix – 32km at a cost of 1.4 billion, 33,554. Also, it costs 184 million a year to operate this single line.
Seems like LRT does not attract a load of ridership everywhere it goes! And trust me, many of these LRT lines are fed bus riders, just like any other system in the world, for that only makes sense.
Again, I could go on.
But I must say, I am one who supports skytrain to UBC and rail to the valley, but shame on you for trying to divide the pro transit groups with your personal hatred of skytrain and metro.
Ian
And this
I should also not that Vancouver is a geographically constrained location (Mountains to the North, Ocean to the West and the border/ALR land to the south (and east for ALR land)
Our Metro population is expected to reach 3 million in around 10 years, and the Broadway corridor is expected to grow (it is already one of the main commercial centers of our region) and UBC is one of our largest employees/destinations. Not to mention it would make a much more convenient transfer from the M line to the C line at Olympic village station.
So yes, we should build skytrain for Broadway, that is building infrastructure that will meet our demands for many decades (and skytrain with 80m platforms, no 40m platforms). It is very concievable that in the near future the Broadway skytrain could have 20 000ppdph.
LRT would be a temporary band aid solution. (look at Calgary where they are now planning on burying part of their section downtown, that is building something twice, which is far more expensive than building it right once.
Ian