HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    One World Trade Center in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • New York Skyscraper Diagram

• Map Location
• New York Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #7061  
Old Posted Jan 7, 2010, 1:46 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
Thanks to all for the pictures.

I thought the tower will have a concrete core. But at the core I just can see steel. At other towers, the concrete core is taller than the steel floors (when the building is U/C). How do they built the concrete core?
__________________
One World Trade Center= the best skyscraper in the world and the tallest in the Western Hemisphere
All the way with LBJ
     
     
  #7062  
Old Posted Jan 7, 2010, 2:01 PM
Esab's Avatar
Esab Esab is offline
Registered User
 
Join Date: Jan 2010
Location: Stratford upon Avon
Posts: 7
Quote:
Originally Posted by NYCLuver View Post
Speaking of that place piece, in my picture above, in one of the places they recently put up, I noticed another place piece out of position, look closely.

Its on the top row, near the diagrid all the way to the right.
If Its the member I think you are talking about....I am pretty sure its still being erected. You can see the hook block and the hoist rope above it. Just to the left of the main hook block and above the working platform that is under the beam? Stands out against the building behind it.

Quote:
Originally Posted by NYCLuver View Post
     
     
  #7063  
Old Posted Jan 7, 2010, 2:30 PM
canadate's Avatar
canadate canadate is offline
Registered User
 
Join Date: Mar 2009
Location: New York, NY
Posts: 152
NYguy, colemonkee, Dac150 & OneWorldTradeCenter:

Thanks a lot and no problem Will post more as soon as I can.
     
     
  #7064  
Old Posted Jan 7, 2010, 2:47 PM
theWatusi's Avatar
theWatusi theWatusi is offline
Resident Jackass
 
Join Date: Dec 2006
Location: Your Mom's House
Posts: 9,270
Quote:
Originally Posted by OneWorldTradeCenter View Post
Thanks to all for the pictures.

I thought the tower will have a concrete core. But at the core I just can see steel. At other towers, the concrete core is taller than the steel floors (when the building is U/C). How do they built the concrete core?
Most concrete cores are reinforced with rebar, so the core is constructed first so the exterior steel can bolt onto brackets poured into the core.

1WTC's core is reinforced with steel beams, so the core and the exterior steel are constructed first and then the core concrete is poured afterwards.
__________________
"...remember first on me than these balls in airports" - MK
     
     
  #7065  
Old Posted Jan 7, 2010, 2:54 PM
OneWorldTradeCenter's Avatar
OneWorldTradeCenter OneWorldTradeCenter is offline
Editor
 
Join Date: Aug 2009
Location: Renningen, Germany
Posts: 1,201
Quote:
Originally Posted by theWatusi View Post
Most concrete cores are reinforced with rebar, so the core is constructed first so the exterior steel can bolt onto brackets poured into the core.

1WTC's core is reinforced with steel beams, so the core and the exterior steel are constructed first and then the core concrete is poured afterwards.
Thanks for explaining. I thought at the Shanghai WFC´s construction photos and some other buildings.
__________________
One World Trade Center= the best skyscraper in the world and the tallest in the Western Hemisphere
All the way with LBJ
     
     
  #7066  
Old Posted Jan 7, 2010, 4:25 PM
Puzzlecraft's Avatar
Puzzlecraft Puzzlecraft is offline
Registered User
 
Join Date: Nov 2007
Posts: 265
Pieces to be fixed.....

There are more than one... as I saw in a recent picture, I forget who posted this one...

     
     
  #7067  
Old Posted Jan 7, 2010, 4:31 PM
Puzzlecraft's Avatar
Puzzlecraft Puzzlecraft is offline
Registered User
 
Join Date: Nov 2007
Posts: 265
The source for my picture was from a post by NYguy time stamped 12-31-2009, 04:37 AM, credited to jersmith25. I cropped the picture and placed the green arrows.
     
     
  #7068  
Old Posted Jan 7, 2010, 4:56 PM
Domamania's Avatar
Domamania Domamania is offline
Registered User
 
Join Date: Dec 2009
Location: Brewster NY
Posts: 240
It looks like 2 of the 3 pieces were fixed where the green arrows point to.
     
     
  #7069  
Old Posted Jan 7, 2010, 4:57 PM
Esab's Avatar
Esab Esab is offline
Registered User
 
Join Date: Jan 2010
Location: Stratford upon Avon
Posts: 7
Obviously pieces that need some snagging work on them to fit. The one on the right looks like its a welded connection. The two on the left look to be bolted connections
The sheer size of the steel would make it very hard to get bolts in if something wont line up and it would only need to be a small amount out so as not to be able to get bolts through. Smaller structures you would be able to get some movement but on something like this its nigh on impossible to 'podger' as its called.

As for welded joints I would assume that all welded connections are tested after welding and if its not a good fit then it needs sorting properly rather than hacking and slashing to get it lined up.

Most likely someone will be on site doing all these snagging works as the structure rises. Hard to know how quickly these jobs are being done though through just pictures alone though.

Pretty much all steel jobs have snagging....just that this one holds such an interest for everyone and will probably be the most photod and talked about bulding ever and that means we are going to pick up on every little thing that dont look right!
     
     
  #7070  
Old Posted Jan 7, 2010, 6:42 PM
Puzzlecraft's Avatar
Puzzlecraft Puzzlecraft is offline
Registered User
 
Join Date: Nov 2007
Posts: 265
ESAB - Excellent post.
     
     
  #7071  
Old Posted Jan 7, 2010, 7:09 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 57,192
Update from morrongiello (Jan 7)

__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
     
     
  #7072  
Old Posted Jan 7, 2010, 7:51 PM
Boquillas's Avatar
Boquillas Boquillas is offline
Registered User
 
Join Date: Jul 2006
Location: 80221
Posts: 1,332
Looking at the render of the base again, it looks as though the diagonals meet and flare away from each other a bit, meaning there might be a little more to go after this go-round before the office floors begin.
__________________
"Inspiration is for amateurs; the rest of us just show up and get to work." -Chuck Close

Flickr Blog Site
     
     
  #7073  
Old Posted Jan 7, 2010, 8:22 PM
uakoops uakoops is offline
Registered User
 
Join Date: Jul 2009
Posts: 201
Quote:
Originally Posted by Boquillas View Post
Looking at the render of the base again, it looks as though the diagonals meet and flare away from each other a bit, meaning there might be a little more to go after this go-round before the office floors begin.
Where the diagonals meet there will be another one of those huge connectors, similar to the ones at the bottom.
     
     
  #7074  
Old Posted Jan 7, 2010, 9:01 PM
Domamania's Avatar
Domamania Domamania is offline
Registered User
 
Join Date: Dec 2009
Location: Brewster NY
Posts: 240
yes one more level after what they are doing, then the fun begins. plus in the office floors it looks like half the steel is going to be used for the office floors then the base floors. So once the base is done, now from an expirenced construction worker my self, it then would take about 2 weeks per floor for the office floors.
     
     
  #7075  
Old Posted Jan 7, 2010, 10:39 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Quote:
Originally Posted by Puzzlecraft View Post
There are more than one... as I saw in a recent picture, I forget who posted this one...

I count 6 ohshits in that pic. One below the 2 on the left. The one to the left of the one on the right, and one of the white baffle supports.

Make that 7. The one all the way at the bottom below the ones on the left.

With all those diagonals and all the welded connections I'm not surprised .
     
     
  #7076  
Old Posted Jan 7, 2010, 10:42 PM
uaarkson's Avatar
uaarkson uaarkson is offline
Registered User
 
Join Date: Nov 2008
Location: Back in Flint
Posts: 2,103
Is that an unusual amount of "ohshits"?
     
     
  #7077  
Old Posted Jan 7, 2010, 10:46 PM
Bucktown718's Avatar
Bucktown718 Bucktown718 is offline
Registered User
 
Join Date: Sep 2009
Location: Brooklyn, New York
Posts: 296
^^^Im pretty sure they have a good reason for those ohshits
     
     
  #7078  
Old Posted Jan 7, 2010, 10:47 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Quote:
Originally Posted by MadGnome View Post
Are all floors from 20 up figured by exact 13 foot increments from ground level?
From 20 to 89 they well be 13' 4".
     
     
  #7079  
Old Posted Jan 7, 2010, 10:51 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Quote:
Originally Posted by meh_cd View Post
Any chance you can snag a higher rez shot of the skylobby and the observation deck?
The sky lobby is just like all the other office floors except for a large floor opening on the north side. The prints of the observation deck look exactly like an empty office floor except for the step in the floor slab.

I guess I'm saying no, the pics I post are low rez or vague on porpoise.
     
     
  #7080  
Old Posted Jan 7, 2010, 11:00 PM
Zensteeldude Zensteeldude is offline
Honored Member
 
Join Date: Jul 2009
Location: Northern New Jersey
Posts: 692
Quote:
Originally Posted by uaarkson View Post
Is that an unusual amount of "ohshits"?
Not on a building this size. All the ones on the left may be an error in the shop drawings or the one that fits really doesn't fit (too long) and the rest are correct.

520 Madison Ave had to have 7.5 tons of steel added to the trusses supporting the exterior stone cladding. A small error, the fix was just 2 steel plates, just 12 pounds more per truss. There were 1200 trusses !!



As you can see, the building turned out just fine.

Last edited by Zensteeldude; Jan 7, 2010 at 11:55 PM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 12:01 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.