Quote:
Originally Posted by deasine
Your question has been partly answered in the previous page.
Clearly, everything's quite preliminary. The transborder terminal is an extension of the airport eastwards from the Int'l terminal. A new Canada Line station will be built (at the point where there are two tracks). It will be broken up into two phases. Phase 1 is expected to be complete in 2015, phase 2 in 2023. YVR's been expanding quite quickly: you might see these two phases built as one. No, there are no renderings, but the expansion is covered in the 2027 Masterplan.
Refer to plan: http://wwwnew.yvr.ca/en/about/future-planning/YVR-Your-Airport-2027.aspx
|
Yes, the new transborder terminal will just be an extension of the International Terminal building, where the fairmont hotel and the cruise ship loading is.
As for the dates, due to the economy and the reduction of flights, we may even see these dates pushed back.
Since the design hasn't started, there are no drawings.
However, I also hear they will expand Pier A to increase westjet's capacity.