HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 19, 2009, 3:33 AM
RTWAP's Avatar
RTWAP RTWAP is offline
 
Join Date: Oct 2009
Posts: 528
So the inevitable question is, what can be cut?

Do we need a station at Cyrville?

Can we build smaller stations underground and expand them later? Maybe just do a little bit of preparatory excavation beyond the 4-car tunnel size, and then plan on doing the remaining excavation in the decades ahead as needed, with equipment and debris moving in and out via rail during the night.

Any other targets?
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.