Quote:
Originally Posted by Wooster
Yeah, most of the existing lines go or are going very soon to as far as they need to at the urban edge for the foreseeable future. It's time to quickly catch up the the swaths of Calgary that don't have LRT - the SE and North Central. Then longer term the East Corridor along 17th ave SE and the Bow Valley Corridor (west hillhurst, parkdale, montgomery, Bowness etc) as well as a circle route to start to connect these spokes together. Comprehensive coverage of Calgary's geography is needed for truly effective rapid transit and the ability to live day to day life without a car.
|
While I do believe it is important to provide LRT service in areas that are currently not serviced by LRT lines, it would be a shame to let development in the NE and South get ahead of rapid transit again; there needs to be a balance. One of the ways I think the City could go about funding the extensions in the NE and South is to copy the
Section 106 method used in the UK. Basically, the City could attempt to recoup 75% of the cost of servicing new developments through Development Levies and make up the remaining 25%, or even get an additional 25%, through Section 106 agreements that would result in developers providing transportation infrastructure (i.e. LRT stations and facilities). The newest station on the London Overground,
Imperial Wharf, was partially funded by a Section 106 agreement.
Here is an article briefly describing it.