Quote:
Originally Posted by Zassk
^ Oh, I'm surprised there aren't drains/pumps or something at each end of the bored tunnels to prevent runoff heading in. I guess Dunsmuir tunnel doesn't get exposed to this problem, and the cut & cover sections don't have any low points.
|
The Nov 13th Buzzer has an article about the late-nite shuttle between Stadium Stn and Waterfront for the next 4 weeks. One track is being shut down so work crews can repair seepage that has been a problem since the CPR Dunsmuir tunnel was rebuilt to handle SkyTrain. 25+ years of seepage has caused a lot of rusting and concrete spalling. I believe I saw a report on BCTV (Global) a few weeks ago. The reporter was escorted into the active tunnel & shown the issues.
It's appalling that in order to save a few bucks, someone decided that a sump-pump at the bottom of the tunnel wasn't needed. It doesn't matter how long, wide or deep False Creek is, nor how deep the tunnel is dug under the False Creek bottom; a Tunnel under water will inherently have leaks, and it is proper engineering to allow this leakage so that the water pressure above & around the tunnel is kept close to normal.
If I remember correctly, the Chunnel was designed specifically to allow water to seep between the chalk marl and the concrete rings that make up the tunnel, and every few hundred feet along the length of the tunnels there is a sump pit & pump to remove this water.
This isn't an issue only with the False Creek tunnels, as I recall in Sept seeing water trickling and pooling in the tunnels between King Edward and the first curve around QEPark. I pointed it out to a friend who knows more about hydraulic & civil engineering than I do, and was told "that's normal seepage & should be expected". I would have expected the tunnel's exteriors would have been waterproofed so the seeping water would have to go around the tunnel & into sumps under the tunnels.
Can we get Mike Holmes to do an inspection of the C-Line & growl at everyone when he finds sub-standard work?