Quote:
Originally Posted by Franky
Transportation Infrastructure Requirement Study
Development of a Downtown Transit Solution and Network Implications
April 2008
Based on 2031 phd of 15,000, it looks like surface could accommodate only 7,500 phd which is less than the current level served by buses. Both Albert and Slater for example would need bidirectional tracks.
|
I think that surface LRT would work best along Albert Street. The north side of that street has relatively few property access points:
- The blocks between Metcalfe and Bay either have no access points at all or alternative access from Queen Street could easily be implemented.
- The alignment between Elgin and Metcalfe could be angled so as to maintain access to north side properties.
- The alignment between Bay and Bronson could be shifted towards the south side of Albert Street in order to maintain access to the hotel and office building on the north side.
Thus, two side-by-side lanes for the exclusive use of the LRT can be had without sacrificing access to property. We could keep our four downtown stations, which would help distribute the passenger load. There would be, however, a permanent loss of parking.
With regard to capacity:
- The City of Ottawa seems to admit that 30 trains per hour would be feasible. Studies for Calgary suggest that capacity of 36 trains per hour may be possible. With an alignment on Albert where the only interference would be from cross-traffic, it is perhaps possible to match the capacity claimed for Calgary.
- The downtown blocks are long enough to accommodate 4-car trains.
- The City uses a figure of 135 passengers per car. Calgary seems to be using practical capacity per car of 180 passengers.
A conservative estimate of capacity would be 16,200 pphpd (30 trains per hour, 4-car trains and 135 passengers per car). An optimistic estimate would be 26,000 pphpd (36 trains and 180 passengers per car).
Assuming the least costly option is chosen (i.e., the existing Transitway is converted to LRT and thus the South is served mainly by the SE Transitway corridor), peak-hour loads in 2031 would be 13,700 from the East and 12,800 from the West. So clearly, even with a conservative estimate of capacity, we would be okay well past 2031.