HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9501  
Old Posted Sep 11, 2009, 7:13 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
That was an enjoyable read. Weird about the bus? I didn't know or haven't heard of short turning at White Rock Centre
     
     
  #9502  
Old Posted Sep 11, 2009, 7:18 AM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by mr.x View Post
I'm not too sure either. But I do remember that they need something like a fair warning notice, like a week, for things like Canucks and Lions games. Maybe they require more attendants?
Well considering the canucks schedule is now released. I'm pretty sure they can plan for the games next march and april

Unless there are some special canucks games that I don't know about
     
     
  #9503  
Old Posted Sep 11, 2009, 12:57 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,391
So Any Updated Traffic Counts??!?!?!??
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #9504  
Old Posted Sep 11, 2009, 4:08 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Does anyone know if ProTransBC is mandated to send 1/2 of the trains to YVR? Or could the ratio be changed to e.g. 1/3 - 2/3 during rush hour instead?
     
     
  #9505  
Old Posted Sep 11, 2009, 4:33 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by deasine View Post
That was an enjoyable read. Weird about the bus? I didn't know or haven't heard of short turning at White Rock Centre
Half of the bus now terminate at White Rock Centre during off-peak. So from 16th Avenue to Crescent Beach still have the 30min headway off-peak.
     
     
  #9506  
Old Posted Sep 11, 2009, 5:33 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,596
Quote:
Originally Posted by Zassk View Post
Does anyone know if ProTransBC is mandated to send 1/2 of the trains to YVR? Or could the ratio be changed to e.g. 1/3 - 2/3 during rush hour instead?
That would lower the frequency from 7mins to 10.5 (on average). I think that's too much.
     
     
  #9507  
Old Posted Sep 11, 2009, 5:39 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
how about having one set of trains shunting back and forth between Brighouse and Bridgport corresponding with the YVR train's schedual (the shunting one arrives just before the YVR train heading northbound in the morning and arrives just after the northbound YVR train in the evening at Bridgeport?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #9508  
Old Posted Sep 11, 2009, 6:03 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by WarrenC12 View Post
That would lower the frequency from 7mins to 10.5 (on average). I think that's too much.
10.5 Minutes is not that long. Considering that is the waiting time for a train now on either the the brighouse or yvr lines late at night.

I think if they were to send a train out to Yvr. And then have it sit there for just under the 10.5 minutes. So people can slowly load as they need be. Then when the time is up close the doors and pull out. As soon as it it gone the next one is pulling in right away into the yvr station and now sits for about 10.5 minutes. That way people can find a seat and just sit down instead of standing around and waiting for the train to come along and having to unload and load in 1 minute.

I'd also setup a system where the PA system gives out an automated message something like "Waterfront bound train will leave in 10 minutes" and the next message might be a minute later and say it will be 9 minutes. Or they could just let the display that is there now let people know when the train is leaving.
     
     
  #9509  
Old Posted Sep 11, 2009, 6:06 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
I think my idea is better... my way we do not lose frequency to YVR and the Richmond section has the same frequency as the Watrerfront to Bridgeport station section, and it would only involve a momentary cross platform transfer.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #9510  
Old Posted Sep 11, 2009, 6:16 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Metro-One, I like the short shuttle idea too, but I doubt YVR would be happy with that outcome for their $300 million (?) investment in the line. I expect trains will always connect Waterfront directly with YVR, it is just a question of how frequent they are. Once per 10 minutes should be quite comparable to airport shuttles in other cities. If I recall, the Gatwick express runs every 15 minutes.
     
     
  #9511  
Old Posted Sep 11, 2009, 7:06 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,596
Quote:
Originally Posted by cabotp View Post
10.5 Minutes is not that long. Considering that is the waiting time for a train now on either the the brighouse or yvr lines late at night.
I'll agree it's not the end of the world. However if/when they ever start charging a premium, I'd be pretty choked at that kind of service. Plus this is the first entry to the region for a lot of tourists, etc. There are a few reasons to make sure that is a good experience.

Quote:
Originally Posted by cabotp View Post
I'd also setup a system where the PA system gives out an automated message something like "Waterfront bound train will leave in 10 minutes" and the next message might be a minute later and say it will be 9 minutes. Or they could just let the display that is there now let people know when the train is leaving.
They already have signs for this, I don't see that as a problem.

I think we can agree the solution lies in more trains for the system!
     
     
  #9512  
Old Posted Sep 11, 2009, 7:11 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Quote:
Metro-One, I like the short shuttle idea too, but I doubt YVR would be happy with that outcome for their $300 million (?) investment in the line. I expect trains will always connect Waterfront directly with YVR, it is just a question of how frequent they are. Once per 10 minutes should be quite comparable to airport shuttles in other cities. If I recall, the Gatwick express runs every 15 minutes.
What i was thinking was not running the suttle to and from YVR, but running it along the Richmond stretch to correspond with ever waterfront to YVR bound train. that way 1 out of every 2 trains would serve brighouse direct and 1 out of every 2 trains would serve YVR direct, but there would also be a shuttle train going between Brighouse and Bridgport that would opperate as every YVR train comes and goes. Its hard to explain. Simply when the YVR bound train arrives at Bridgport on the other side of the platfrom is the Richmond shuttle train waiting, both trains go to their terminus, and when the YVR bound train is heading back to Waterfront the Richmond shuttle arrives back at Bridgport.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #9513  
Old Posted Sep 11, 2009, 8:30 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,111
Sounds confusing Metro-one.

I think the better solution is any new trains go where the people are... which is likely going to be Richmond.
     
     
  #9514  
Old Posted Sep 11, 2009, 8:51 PM
Unregistered Unregistered is offline
Registered User
 
Join Date: Aug 2006
Posts: 78
Quote:
Originally Posted by BCPhil View Post
All this from a nation (UAE) that has a similar GDP at purchasing power parity to BC. How come they get to have almost 100km of automated rapid transit (very similar in capacity to Skytrain) on the drawing board for only $2.73 billion?
I believe the Dubai metro cost US $7.6 billion.
     
     
  #9515  
Old Posted Sep 11, 2009, 9:21 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Yah the cost overruns there were huge in Dubai. Even look at Seattle for one expensive system. We're lucky we got our 3 lines in Vancouver for as little as we did.
     
     
  #9516  
Old Posted Sep 11, 2009, 9:24 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,935
Quote:
I believe the Dubai metro cost US $7.6 billion.
And its 70km, not 100km of rail (and it is not 70 km until next year).
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #9517  
Old Posted Sep 11, 2009, 9:46 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by vanman View Post
Apparently Dubai's metro will be over 170km by 2012:


I think only the Red line and the Green line are the done deal. Dubai metro will still be only 3 km ahead of Vancovuer by 2012.

There's simply no adequate demand in Dubai, train frequency is also no match to our skytrain (combined service) or canada Line (Vancouver section)
     
     
  #9518  
Old Posted Sep 11, 2009, 11:09 PM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
Quote:
Originally Posted by CLC View Post
I think only the Red line and the Green line are the done deal. Dubai metro will still be only 3 km ahead of Vancovuer by 2012.

There's simply no adequate demand in Dubai, train frequency is also no match to our skytrain (combined service) or canada Line (Vancouver section)
If we want to keep our spot as the longest automated system in the world, we'd better get building. Dubai expects to have 318km of double-track by 2020. So we only have to add another 249km of track over the next 10 years to keep pace with Dubai. At 25km per year, that's like building two Evergreen lines a year.
     
     
  #9519  
Old Posted Sep 12, 2009, 12:04 AM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
^ Dubai is in downturn, their ambituous metro plan... hmm I don't believe it until it all get really completely built LOL

Also, Dubai may consider other "advanced" technology in their future line, there's no firm plans if the future lines will be all automated.
     
     
  #9520  
Old Posted Sep 12, 2009, 12:31 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Don't forget ours is only the longest in the world because we count most of the expo line twice, I beleive the M-Line uses the distance for it's entire route even though a large part of that is on the Expo line. If we build the evergreen line and send a car from the expo line and one from the M line all the way to the end we can call them two new lines and count all those kms.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:49 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.