Quote:
Originally Posted by mr.x
The VCCEP was different when it comes to skyrocketting costs. There was no way it could have been built for $475-million in the first place when Canada Place/Pan Pacific next door was built for that same amount back in 1986! They grossly underestimated the cost to build it, aside from inflating labour/materials costs. Not to mention that the VCCEP, being a much more complex project than Canada Place.
|
As a P3 the shovels never would have hit the ground with a $475m price tag then. So what's your point?
I think the comparison between the C-Line and the VCCEP is a great one.