HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Sep 4, 2009, 10:19 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,730
Quote:
Originally Posted by mr.x View Post
The VCCEP was different when it comes to skyrocketting costs. There was no way it could have been built for $475-million in the first place when Canada Place/Pan Pacific next door was built for that same amount back in 1986! They grossly underestimated the cost to build it, aside from inflating labour/materials costs. Not to mention that the VCCEP, being a much more complex project than Canada Place.
As a P3 the shovels never would have hit the ground with a $475m price tag then. So what's your point?

I think the comparison between the C-Line and the VCCEP is a great one.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:03 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.