HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #9041  
Old Posted Aug 31, 2009, 6:48 PM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
Quote:
Originally Posted by deasine View Post
http://railforthevalley.wordpress.com/20...ed-fare-what-is-it-will-translink-do-it/

Can someone enlighten me, or is it there's really no point in this post....
No, not really any point at all. He is just trying to show that Skytrain in Vancouver doesn't work because he thinks that if it doesn't work, then Translink will automatically build LRT in the Valley. He is only concerned about one thing, the interurban, everything else is of no concern, and it shows in his thoughtless bashing of transit in other parts of the city.

He makes a very basic assumption in his critique that everything should be divided evenly. Like in his example, taking a bus -> Skytrain -> bus should result in 1/3 of the fare going to Skytrain. That is overly simplistic. It does not take into account the actual cost incurred by the trip or the cost of the individual pieces.

I could for example ride a bus for 2 minutes, then ride Skytrain for 30 minutes, then ride a bus again for another 2 minutes. In that case it is obvious that Skytrain was more than just 1/3 of my trip, but the majority. I could also take a bus for 45 minutes, then take Skytrain for 2 stations, then take another bus. In that case Skytrain might be less than 1/3 of my trip. However, it is still possible that the Skytrain trip, when factored in with capital costs, maintenance, and amortization, that the Skytrain part was still the most expensive.

It could further be argued that if it wasn't for the quick connection between different bus routes by Skytrain, that a majority of the people on transit wouldn't bother. For example, the 80% of people who get to Skytrain by bus, might not take that bus at all if it didn't take them to Skytrain. Therefore Skytrain is a key component in driving ridership numbers. So as a simple way of averaging trip costs and paying for a system that drives ridership levels up, you give all the fare to Skytrain.

The system is going to have to be subsidized somewhere, or else we could let it be a 100% privately run enterprise complete with competition. In my opinion, and in Translinks, the availability of Skytrain for passengers is a key driving force to get many to ride transit, so why not allocate the tickets to Skytrain and subsidize the buses?

Doing it the other way is much harder. If you subsidize Skytrain, and make it so buses need to recover cost at the fare box, we'll soon find there are a lot of bus routes that are unable to return close to cost. What do we do then, cut them and anger the ridership? Or subsidize them in addition to Skytrain? I think we would lose a lot more buses if we adopted a model where bus routes need to be successful in order to keep operating.

zweisystem needs to be careful. Even an LRT interurban is going to need buses to bring people from their homes to the line and from the line to their destination (or transfer to Skytrain). So even LRT won't be immune from having to split fares with other modes.

He always compares Skytrain to other LIM systems, and to C-Train. Both the Skytrain and the C-Train are exceptions to the rule, not the rule. Skytrain is very successful in it's own right, and C-Train is over twice as successful than the next most used LRT system in North America.

Skytrain, and the new Canada Line are working in Vancouver. The more we build the better it gets, the more convenient it is to get to, the faster it is to get places, and more attractive to ride. More Skytrain = more passengers. At the same time, there is no reason LRT wouldn't work in the Valley. It's just that Skytrain and LRT both use many of the same funding and operating principles. Bashing a (light) metro in a metropolitan area doesn't help prove the case for light rail in the suburbs.

zweisystem should try making the case to build, not make the case to not build. If it is as cheap as he claims, then there is no reason to build Skytrain over LRT in the valley. But that's the Valley, Skytrain has be a success in Vancouver.
     
     
  #9042  
Old Posted Aug 31, 2009, 7:27 PM
ckkelley's Avatar
ckkelley ckkelley is offline
Bridge Walker!
 
Join Date: Feb 2006
Location: The Forest City
Posts: 1,037
Quote:
Originally Posted by twoNeurons View Post
It's $1.90 if you buy faresaver books. They're really the best way to do things for occasional users and I'm sure smart cards would along the same principles of faresaver books.

Off peak it's all 1-zone remember.

However, unlike faresavers, you can use it for 2 zone or 3 zone tickets if you need to without buying a separate book or paying a cash upgrade fee. If your usual trip is a 1-zone occasional fare, but one day your car is in the shop, then you can use the card to make the 2-zone trip to work.

As an option, if we're still using the zone system, you can buy a multi-zone month-pass instead. We have an off-peak pass. It's called a 1-zone month pass. All Zones become 1 after 6:30. Lots of people who work afternoon shifts or nighshifts use it and pay an add-fare.

Right now, faresavers give you a 25% discount, which translates to ~30% bonus. They could be sold in increments of 10,
  • $20 gets you $26
  • $30 gets you $39
  • $40 gets you $52
Where can you buy faresaver books? 7-11's? and the like?
__________________
Just chimin' in.
     
     
  #9043  
Old Posted Aug 31, 2009, 7:40 PM
nova9 nova9 is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 1,086
Quote:
Originally Posted by ckkelley View Post
Where can you buy faresaver books? 7-11's? and the like?
usually anywhere that sells farepasses. safeway, shoppers, LD, etc.
     
     
  #9044  
Old Posted Aug 31, 2009, 7:46 PM
mrjauk mrjauk is offline
Registered User
 
Join Date: Oct 2008
Posts: 555
Quote:
Originally Posted by nova9 View Post
usually anywhere that sells farepasses. safeway, shoppers, LD, etc.
You can also use the Faresaver to travel anywhere, and in any direction, as long as you complete the trip before the time stamped on the ticket when you validate. You have 90 minutes. So, for example, it costs me $1.90 to go from Waterfront to Yaletown and back for lunch. A taxi would cost about 10-12 dollars in total.
     
     
  #9045  
Old Posted Aug 31, 2009, 8:10 PM
nova9 nova9 is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 1,086
Quote:
Originally Posted by mrjauk View Post
You can also use the Faresaver to travel anywhere, and in any direction, as long as you complete the trip before the time stamped on the ticket when you validate. You have 90 minutes. So, for example, it costs me $1.90 to go from Waterfront to Yaletown and back for lunch. A taxi would cost about 10-12 dollars in total.
Within the zone you buy it for though, no? Not just throughout the entire system. I'm not too sure, I only ever travel in zone 1.
     
     
  #9046  
Old Posted Aug 31, 2009, 8:24 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
faresaver books are the best deal to pay for transit in Vancouver, unless you're eligible get one of those very discounted transit pass categories.
regular monthly pass is good if you sure you will use it at least 20 days+ for both way commute, or you are going to share it with others in your household.

Last edited by CLC; Aug 31, 2009 at 10:16 PM.
     
     
  #9047  
Old Posted Aug 31, 2009, 9:37 PM
mrjauk mrjauk is offline
Registered User
 
Join Date: Oct 2008
Posts: 555
Quote:
Originally Posted by nova9 View Post
Within the zone you buy it for though, no? Not just throughout the entire system. I'm not too sure, I only ever travel in zone 1.
Yes, you're correct.
     
     
  #9048  
Old Posted Aug 31, 2009, 10:56 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,077
Quote:
Originally Posted by BCPhil View Post
He makes a very basic assumption in his critique that everything should be divided evenly. Like in his example, taking a bus -> Skytrain -> bus should result in 1/3 of the fare going to Skytrain. That is overly simplistic. It does not take into account the actual cost incurred by the trip or the cost of the individual pieces.
I think the cost is just calculated using {annual boarding} * {cost per boarding (around $1.20)}/{operating expense}.. at least the number comes up about right for SkyTrain.

Quote:
Originally Posted by BCPhil View Post
zweisystem needs to be careful. Even an LRT interurban is going to need buses to bring people from their homes to the line and from the line to their destination (or transfer to Skytrain). So even LRT won't be immune from having to split fares with other modes.
Don't forget the park and ride lots.. the last time I checked, P&R isn't part of C-Train's expense but would actually contribute about 30k daily riders. Until earlier this year, the lots was free meaning that C-Train is actually subsidizing it...
     
     
  #9049  
Old Posted Sep 1, 2009, 12:39 AM
clooless clooless is offline
Registered Luser
 
Join Date: Nov 2006
Location: Calgary, Alberta
Posts: 424
Quote:
Originally Posted by BCPhil View Post
No, not really any point at all. He is just trying to show that Skytrain in Vancouver doesn't work because he thinks that if it doesn't work, then Translink will automatically build LRT in the Valley. He is only concerned about one thing, the interurban, everything else is of no concern, and it shows in his thoughtless bashing of transit in other parts of the city

...

zweisystem should try making the case to build, not make the case to not build. If it is as cheap as he claims, then there is no reason to build Skytrain over LRT in the valley. But that's the Valley, Skytrain has be a success in Vancouver.
My thinking exactly, and I posted a comment to this effect in the "Skytrain to UBC" thread. zweisystem is trying to manufacture a false dichotomy that Skytrain is bad so therefore LRT is automatically good, regardless of the circumstances.

Anyway, I will be flying to Vancouver again on Thursday after a two month absence and am looking forward to my first trip on the Canada Line.
     
     
  #9050  
Old Posted Sep 1, 2009, 2:15 AM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
Heh, I was just researching the Yurikamome line in Tokyo, which is a completely automated line much like our Skytrain. I was surprised to see that ridership has just RECENTLY surpassed 100,000 riders per day, and is thus now breaking even. Now, Skytrain plans on hitting 100,000 riders per day eventually, and after experiencing how jam packed this train (absolutely not an inch to be had) that is 3x the length of the Skytrain, at a greater frequency, I can't help but think 100,000 might be a TAD ambitious for us, and going beyond that would be utter chaos.

Daiba Station

http://www.flickr.com/photos/syume/3873564519/

The platform. Note the nifty suicide prevention gates that remain closed until the train arrives

http://www.flickr.com/photos/syume/3874355718/

Freakin awesome 1:1 Gundam outside Daiba station.

http://www.flickr.com/photos/syume/3870643846/
     
     
  #9051  
Old Posted Sep 1, 2009, 2:22 AM
nova9 nova9 is offline
Registered User
 
Join Date: Dec 2008
Location: Vancouver
Posts: 1,086
just sick!!! awesome. too bad that won't be a permanent display.

Interesting to see their station platform WITH protective doors as well.
     
     
  #9052  
Old Posted Sep 1, 2009, 2:24 AM
Yume-sama's Avatar
Yume-sama Yume-sama is offline
Registered User
 
Join Date: May 2007
Location: Vancouver / Calgary / Tokyo
Posts: 7,523
All of the stations along the line have protective doors

They haven't come right out and called them suicide prevention, BUT, everyone knows, as it happens at least once a day in Tokyo.

Though I suppose in a city with the population of Canada, a couple of suicides per day wouldn't be *unusual*.
     
     
  #9053  
Old Posted Sep 1, 2009, 2:48 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,077
Quote:
Originally Posted by Yume-sama View Post
Heh, I was just researching the Yurikamome line in Tokyo, which is a completely automated line much like our Skytrain. I was surprised to see that ridership has just RECENTLY surpassed 100,000 riders per day, and is thus now breaking even. Now, Skytrain plans on hitting 100,000 riders per day eventually, and after experiencing how jam packed this train (absolutely not an inch to be had) that is 3x the length of the Skytrain, at a greater frequency, I can't help but think 100,000 might be a TAD ambitious for us, and going beyond that would be utter chaos.
Did a bit of research too.. they have 28x 6-car train, and each train is capable of carrying 308~352 people (those must be small trains!). The maximum operating speed is 60km/h, so it takes 31 minutes to travel the 14km route. The train is running 8min early morning, 4-5min peak, 5min off-peak weekday, 4min weekend, 10-15min late evening with service starting at 6:00 and ending at 12:30.

Given that our route is 10% longer, 32% faster, 10% more frequent, 7% (peak) or 33% (off-peak) higher capacity per hour, and 14% longer operating hour, it would easily make up the 1.5% less capacity per train and thus would have slightly higher capacity than the line.
     
     
  #9054  
Old Posted Sep 1, 2009, 2:49 AM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
^ Are you sure it is 3x the length of the Skytrain Canada Line? the platform length looks like 80-100 meters.
     
     
  #9055  
Old Posted Sep 1, 2009, 2:57 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,077
Quote:
Originally Posted by CLC View Post
^ Are you sure it is 3x the length of the Skytrain Canada Line? the platform length looks like 80-100 meters.
They are 6-cars trains, but the cars are alot shorter. By the look of it, each car is probably not even 12 meter long.

And note that the busiest day have 276372 riders, which mean that the system isn't at capacity yet.

[EDIT] Measured using Google Map, the station is about 60m long, and each 6-cars trainset is about 52m long. You can see a station here, and you can find a train slightly east of the station, over the river.

Last edited by nname; Sep 1, 2009 at 3:12 AM.
     
     
  #9056  
Old Posted Sep 1, 2009, 3:13 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,614
Looks like a VAL type system - it's on rubber tires - so maybe comparable to 6-car MKI trains?
Massively long cloverleaf-looping ramp up to the Rainbow Bridge.
     
     
  #9057  
Old Posted Sep 1, 2009, 3:14 AM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
Originally Posted by nname View Post
They are 6-cars trains, but the cars are alot shorter. By the look of it, each car is probably not even 12 meter long.

And note that the busiest day have 276372 riders, which mean that the system isn't at capacity yet.

[EDIT] Measured using Google Map, the station is about 60m long, and each 6-cars trainset is about 52m long. You can see a station here, and you can find a train slightly east of the station, over the river.


mystery solved , the specification can be found here:
http://www.yurikamome.co.jp/contents/hp0105/index.php?No=63&CNo=105
     
     
  #9058  
Old Posted Sep 1, 2009, 3:21 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,077
Quote:
Originally Posted by CLC View Post
mystery solved , the specification can be found here:
http://www.yurikamome.co.jp/contents/hp0105/index.php?No=63&CNo=105
That's where I found most of the data.. but it doesn't say how long each train is though...
     
     
  #9059  
Old Posted Sep 1, 2009, 3:41 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,614
I don't read/speak Japanese, but don't the 1-6 indicate the length of each car?
10.8m/10.6m/10.5m/10.5m/10.6m/10.8m?
     
     
  #9060  
Old Posted Sep 1, 2009, 4:26 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,077
Quote:
Originally Posted by officedweller View Post
I don't read/speak Japanese, but don't the 1-6 indicate the length of each car?
10.8m/10.6m/10.5m/10.5m/10.6m/10.8m?
Those are weights, in tonnes.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:06 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.