Quote:
Originally Posted by GeeCee
We still have the C-Line TVMs, don't we?
|
1) There was only one, they ran it through twice
2) "We" never owned it. I believe it was owned by SELI, an Italian company which was subcontracted by InTransit BC to bore the tunnel.
Just for the record, to avoid confusion: TVM = Ticket Vending Machine. You're thinking of a TBM.
---------------------
DKaz:
WRT bore diameter, trains actually require larger tunnels than you'd think. Remember, all those concrete precast pannels they've added around the edge of the tunnel come from the space that has been dug out. Next, you need to fill up the bottom of the tunnel, to get a flat surface on which to lay your tracks. The overhead power supply also means you need more room, not just for the pantograph, but also to run the overhead catenary wires.
Unless your tunnel is straight as an arrow (unlikely), they you need to look at how your train envelope changes as the train turns. Simply because the tracks have a nice curve doesn't mean your train will curve, it will overhang into the inner radius of the turn, so you need clearance for this. Similarly, if you superelevate any of your tracks, the entire train will tilt, and you have to make sure the top corner in the direction of tilt won't start hitting the tunnel wall.
You also need space for a service/emergency walkway, and of course you want some buffer zone between train and the nearest points of contact.