  #1581  
Old Posted Aug 19, 2009, 6:17 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
They say they need to get the $450 million of extra funding \yr to have their portion of the funding(172 million).
     
     
  #1582  
Old Posted Aug 19, 2009, 6:30 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,128
Closing or even reducing WCE would be ridiculous in my viewpoint. There are constant arguments across the board that there isn't enough transit expansion as it is so to create a new SkyTrain line only to close down part of WCE would be counter productive even with regards to cost savings considerations.
     
     
  #1583  
Old Posted Aug 19, 2009, 6:38 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by jhausner View Post
Closing or even reducing WCE would be ridiculous in my viewpoint. There are constant arguments across the board that there isn't enough transit expansion as it is so to create a new SkyTrain line only to close down part of WCE would be counter productive even with regards to cost savings considerations.
Well, they can route the first 4 trains to Downtown, and terminate train #5 at Coquitlam station and use it as an hourly shuttle between Coquitlam and Port Haney station (the round trip will take 52min in this stretch) before going back to Mission from Coquitlam station as train #1
     
     
  #1584  
Old Posted Aug 19, 2009, 6:49 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,302
The Evergreen Line will get built, the Federal and Provincial governments will either come up with the funding shortfall or shove it down Translink's throats (or a combination of both). The Liberals will be on their heels trying to win back votes after this whole HST thing, they'll get Evergreen rolling guaranteed.

Quote:
Originally Posted by nname View Post
Well, they can route the first 4 trains to Downtown, and terminate train #5 at Coquitlam station and use it as an hourly shuttle between Coquitlam and Port Haney station (the round trip will take 52min in this stretch) before going back to Mission from Coquitlam station as train #1
My wife took train #5 to get to work by 9am.

A lot of construction workers use train #1 each way to and from downtown, consistent with their 7-3 or 7-3:30 work hours.

Downtown needs all 5 trips each way... We actually could use more than 5 trips each way.

If we get to the point where WCE is a profit centre subsidizing the rest of the transit system, why mess with it? If anything I could say that the WCE is keeping the NE Sector (Tri Cities, Maple Meadows) overall farebox recovery rate from being in the absolute pits.
     
     
  #1585  
Old Posted Aug 19, 2009, 7:00 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by DKaz View Post
My wife took train #5 to get to work by 9am.

A lot of construction workers use train #1 each way to and from downtown, consistent with their 7-3 or 7-3:30 work hours.

Downtown needs all 5 trips each way... We actually could use more than 5 trips each way.

If we get to the point where WCE is a profit centre subsidizing the rest of the transit system, why mess with it? If anything I could say that the WCE is keeping the NE Sector (Tri Cities, Maple Meadows) overall farebox recovery rate from being in the absolute pits.
Maybe they should add train #6 to do the shuttle then... or reschedule them so they run every 40 minutes? I think the WCE would be a good opportunity to funnel people from Pitt Meadows and Maple Ridge area to the Skytrain, who otherwise would be using public transit.

And regarding to cost recovery, Tri-City actually have a good cost recovery ratio, which last reported to be in the mid-to-high-60s back in 2004. Ridge Meadows, otherwise, is projected to be in the 30s to low 40s in 2008.
     
     
  #1586  
Old Posted Aug 19, 2009, 8:29 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,302
Quote:
Originally Posted by nname View Post
Maybe they should add train #6 to do the shuttle then... or reschedule them so they run every 40 minutes? I think the WCE would be a good opportunity to funnel people from Pitt Meadows and Maple Ridge area to the Skytrain, who otherwise would be using public transit.
We'll see what they manage to negotiate with CP Rail in 2014, but it's a very heavily used corridor for freight and I'd be ecstatic if they got a 6th trip out of the deal. Having an hourly schedule between Tri-Cities and Maple Ridge would involve building a dedicated track which I know is definitely not on Translink's 10 year outlook.

Quote:
Originally Posted by nname View Post
And regarding to cost recovery, Tri-City actually have a good cost recovery ratio, which last reported to be in the mid-to-high-60s back in 2004. Ridge Meadows, otherwise, is projected to be in the 30s to low 40s in 2008.
The bus loop at Coquitlam and Port Moody is extremely well used during rush hour with buses and community shuttles leaving full, particularily the ones connecting with WCE. I'm not surprised. Evergreen Line will only boost this. Yes Coquitlam might be sprawling up the mountain but Translink is doing something right in Coquitlam - bringing more buses closer to where people live, making it so convenient that people actually want to take transit.
     
     
  #1587  
Old Posted Aug 19, 2009, 10:38 PM
cornholio cornholio is offline
Registered User
 
Join Date: Jun 2006
Posts: 3,916
BCPhill, you make interesting points and having the line go down Guildford would be good since it go straight to Poco with no branching. It might even be cheaper since there would be hardly any land acquisitions required since the ROW is already in place.

The problems I see though is the schools next to Landsdown(even though I agree its bs, but in the end a station there doesnt have to be a priority as you can have good bus conections to Ioco and Douglas). Also you make a convincing point about the Smith/Clark station but imo I think with the redevelopment of the Burquitlam plaza and the likely significant increase in 143 ridership im not so sure its needed to move the station. Keep in mind that there are allot of people living north of there also and you would be moving the station further away from them.

Anyways it should be looked at atleast and properly studied.

By the way used to live on Cottonwood in those yellow apartment buildings about 16 years ago(the area hasnt changed much since), I also went to Douglas college out there after it was built for some courses, and lived at Austin and North Road area about 10 years ago and spent many years up on Forest grove(Burnaby mountain) so I have a little bit of familiarity of the area...Plus I work in the Kingsway, Coast Meridian area right now.

I also agree with the Poco placement of your station, that area is set for massive redevelopment and its next to the WCE, plus the industrial lands would attract lots of ridership...including me on days when I have time and want to relax.
     
     
  #1588  
Old Posted Aug 20, 2009, 2:15 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
this pic from Vancouver Sun has a lot more stations:

I am assuming that it's from the early planning stage?



Notice the Evergreen Line logo....they didn't include Canada Line!!
     
     
  #1589  
Old Posted Aug 20, 2009, 5:39 PM
Jared's Avatar
Jared Jared is offline
senior something
 
Join Date: Oct 2001
Location: Vancouver, Canada
Posts: 4,051
Quote:
Originally Posted by Allen View Post
this pic from Vancouver Sun has a lot more stations:

I am assuming that it's from the early planning stage?



Notice the Evergreen Line logo....they didn't include Canada Line!!
That's the LRT-era plan.
     
     
  #1590  
Old Posted Aug 28, 2009, 11:01 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Care to purchase the Beacon Hill (Seattle) TBM? US$300,000

http://www.tbmexchange.com/pages.php?page=617
     
     
  #1591  
Old Posted Aug 28, 2009, 11:29 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,302
6.44m? Did they try to squeeze bidirectional LRT service into one tunnel? Seems like it'll be a squeeze. Two MKIIs = 5.2m, leaving about less than 1.2m of access. They could also stack the tracks as well.

When I think of the Evergreen Line Clarke Hill tunnel, I think about how can they make sure that the train fire that killed over 150 in that Austrian tunnel doesn't do the same thing here.
     
     
  #1592  
Old Posted Aug 28, 2009, 11:37 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ i believe the Clarke Hill tunnel is now shorter at 2-kms, originally at 3-kms.
     
     
  #1593  
Old Posted Aug 29, 2009, 1:19 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by DKaz View Post
6.44m? Did they try to squeeze bidirectional LRT service into one tunnel? Seems like it'll be a squeeze. Two MKIIs = 5.2m, leaving about less than 1.2m of access. They could also stack the tracks as well.
The height of the train is about 4m (I suppose this is the same for SkyTrain too)... plus about 1.5-2m needed for the overhead wire (this is why it is more expensive to put LRT underground than third rail metro).. and a bit more for the rail, 6.44m seems about right.
     
     
  #1594  
Old Posted Aug 29, 2009, 8:02 AM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,731
Look at how tight the University Link bored tunnel cross section is:


Source [page5]
     
     
  #1595  
Old Posted Aug 29, 2009, 8:59 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,057
Quote:
Originally Posted by officedweller View Post
Care to purchase the Beacon Hill (Seattle) TBM? US$300,000

http://www.tbmexchange.com/pages.php?page=617
The Seattle LRT has had to use this machine to go through the city's steep hills.

For that price, it's not such a bad deal!! Why not go for it?
     
     
  #1596  
Old Posted Aug 29, 2009, 9:04 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
We still have the C-Line TVMs, don't we?
     
     
  #1597  
Old Posted Aug 29, 2009, 2:46 PM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,430
oh no those are long gone
     
     
  #1598  
Old Posted Aug 29, 2009, 6:15 PM
Jared's Avatar
Jared Jared is offline
senior something
 
Join Date: Oct 2001
Location: Vancouver, Canada
Posts: 4,051
Quote:
Originally Posted by GeeCee View Post
We still have the C-Line TVMs, don't we?
1) There was only one, they ran it through twice

2) "We" never owned it. I believe it was owned by SELI, an Italian company which was subcontracted by InTransit BC to bore the tunnel.

Just for the record, to avoid confusion: TVM = Ticket Vending Machine. You're thinking of a TBM.

---------------------

DKaz:

WRT bore diameter, trains actually require larger tunnels than you'd think. Remember, all those concrete precast pannels they've added around the edge of the tunnel come from the space that has been dug out. Next, you need to fill up the bottom of the tunnel, to get a flat surface on which to lay your tracks. The overhead power supply also means you need more room, not just for the pantograph, but also to run the overhead catenary wires.

Unless your tunnel is straight as an arrow (unlikely), they you need to look at how your train envelope changes as the train turns. Simply because the tracks have a nice curve doesn't mean your train will curve, it will overhang into the inner radius of the turn, so you need clearance for this. Similarly, if you superelevate any of your tracks, the entire train will tilt, and you have to make sure the top corner in the direction of tilt won't start hitting the tunnel wall.

You also need space for a service/emergency walkway, and of course you want some buffer zone between train and the nearest points of contact.
     
     
  #1599  
Old Posted Aug 29, 2009, 7:08 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Oops, yeah, TBM not TVM. Losing it..
     
     
  #1600  
Old Posted Aug 29, 2009, 7:10 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ would be interesting to see a TVM attempt to bore a tunnel!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:26 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.