  #8861  
Old Posted Aug 27, 2009, 7:51 PM
radacal's Avatar
radacal radacal is offline
sparky
 
Join Date: Feb 2003
Location: Vancouver
Posts: 190
Quote:
Originally Posted by officedweller View Post
Part of the revitalization of Pacific Boulevard with the multi-ways etc. (already completed from Homer to Richards).
It's also in preparation for the eventual streetcar tracks down the middle, but that seems a bit distant to me. It's just going to perpetuate the bottleneck that has existed there during Canada Line construction, although there shouldn't be as many cars going straight through to Drake, since Davie reopened.
People have been driving into the middle to turn left so it hasn't been too bad - don't know why they can't put in the left turn lanes until the street car goes in. Way more cars turn at Davie than Drake.
     
     
  #8862  
Old Posted Aug 27, 2009, 8:02 PM
seaJ seaJ is offline
Registered User
 
Join Date: Mar 2006
Posts: 155
Quote:
Originally Posted by hollywoodnorth View Post
at last check Hwy #1 seems to run the length of Metro Vancouver even divides it in half
But it stops at Vancouver. Once again the end of the line. You can't go further west and going east you run into mountains before long. I-5 through Washington runs north south along a coastal lowland all the way through the length of Oregon. You don't hit a major impediment until you reach southern Oregon.
     
     
  #8863  
Old Posted Aug 27, 2009, 8:22 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by radacal View Post
People have been driving into the middle to turn left so it hasn't been too bad - don't know why they can't put in the left turn lanes until the street car goes in. Way more cars turn at Davie than Drake.
Never mind that the streetcar system is still in a planning/viability study at best...
     
     
  #8864  
Old Posted Aug 27, 2009, 9:15 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,721
Here's the City report:

http://vancouver.ca/ctyclerk/cclerk/20090602/documents/a14.pdf

The plan in Appendix B even looks like it has a left turn lane - but it's not - you can see the sidewalk ramps at the crosswalk. I think the side of the median without the trees could just be raised concrete median.

     
     
  #8865  
Old Posted Aug 27, 2009, 10:57 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Just an aside, Seattle Link light-rail ridership seems to be have some life, approximately 20% increase over the initial week ridership
Quote:
Light rail's passenger counting system not working

By SCOTT GUTIERREZ
SEATTLEPI.COM STAFF

A technical glitch is hindering Sound Transit's ability to count riders on the month-old Link light rail line.

Sound Transit spokesman Geoff Patrick said Tuesday the system began malfunctioning in the last few weeks and shouldn't affect the accuracy of previous reports on ridership numbers.

Through Aug. 14, weekday boardings averaged 14,784 on the 14-mile line between downtown's Westlake Center and Tukwila, according to Sound Transit. That shows a gradual increase from the last two weeks of July, when weekday ridership averaged about 12,357 boardings. The light rail line opened July 18.

"There is no evidence suggesting we'll need to revise those (numbers)," Patrick said.

Ten light rail vehicles are equipped with an Automatic Passenger Counter -- an infrared sensor that counts passengers boarding on and off at stations. Once per day, the system is supposed to wirelessly download the data to Sound Transit's operations center. Recently, it hasn't been working properly, he said.

"There has been a deterioration in performance for reasons that we haven't figured out yet," he said.

The system is missing days on some vehicles and downloading the same day's figures twice in a row on others, forcing Sound Transit employees to manually sort it out, Patrick said.

The system isn't functioning properly on less than half of the cars equipped with it, he said. Sound Transit is working with the vendor, Kinkisharyo Boca Raton, (formerly GeoFocus until they were purchased by light rail vehicle manufacturer Kinkisharyo International) to fix the problem.

Sound Transit is required to report monthly ridership numbers to the Federal Transit Administration because federal funding is involved in the $2.3 billion project. July's numbers will be included in a report to the FTA in September. August's data will be submitted in October, Patrick said.

Sound Transit hopes to resolve the problem quickly, or the agency may need to send out employees to manually count passengers on the light rail vehicles.

"We're hoping that we're not going to need to do that," he said.
If Canada Line also sees 20% increase after a month from aug 17, it will be right around the magic number 100,000
     
     
  #8866  
Old Posted Aug 27, 2009, 11:09 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
Have there been any recent ridership numbers released for Canada Line?
     
     
  #8867  
Old Posted Aug 28, 2009, 12:34 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ it's still hovering at around 80,000.
     
     
  #8868  
Old Posted Aug 28, 2009, 1:43 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,094
I took the second-last train out of airport last night to kill off some time while waiting for my flight. I saw about 40 people taking the train, most with luggage too. When I arrive back in the airport, there were about 20 people waiting at the platform and it was still 8 min until the last departure. I'm actually quite surprised at the number of people riding train this late (I thought they would be all empty after like 11:30pm...)
     
     
  #8869  
Old Posted Aug 28, 2009, 2:10 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Have any of you seen the renderings for Seattle's underground 3.15-mile LINK rail extension to the University of Washington? The underground stations look AMAZING. The extension also requires 3 tunnel boring machines.


With all that said, the extension is going to cost US$1.9-billion....more than what we spent on our 19-km/~12-mile Canada Line.
     
     
  #8870  
Old Posted Aug 28, 2009, 2:27 AM
agrant's Avatar
agrant agrant is offline
Cheers!
 
Join Date: Sep 2006
Location: Vancouver, BC
Posts: 1,869
Pretty safe to say that boring the entire underground portion of the Canada Line would have added a good chunk more.
     
     
  #8871  
Old Posted Aug 28, 2009, 2:34 AM
Jared's Avatar
Jared Jared is offline
senior something
 
Join Date: Oct 2001
Location: Vancouver, Canada
Posts: 4,051
I believe the Seattle extension alignment runs through a former landfill - extremely difficult tunneling.
__________________
My Diagrams My Photos

I'm not the guy from Subway.
     
     
  #8872  
Old Posted Aug 28, 2009, 2:43 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Some really nice renderings for their extension....it would have been nice if we could have met them halfway for both platform lengths and aesthetics:




UNIVERSITY OF WASHINGTON STATION












CAPITOL HILL STATION








     
     
  #8873  
Old Posted Aug 28, 2009, 2:57 AM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
What affect has the opening of the Canada Line had on the loads on the #98?
     
     
  #8874  
Old Posted Aug 28, 2009, 2:59 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Gordon View Post
What affect has the opening of the Canada Line had on the loads on the #98?
Drastic affects.

I passed by a southbound 98 B-Line bus on 41st Avenue yesterday, and there were only about 12 people on it.
     
     
  #8875  
Old Posted Aug 28, 2009, 3:05 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,994
I would still take the Canada-Line any day over Seattle's system.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #8876  
Old Posted Aug 28, 2009, 3:12 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ i certainly would too, their system is way, way, way overbuilt. While ours is underbuilt. It would have been nice if we could have met them halfway with platform lengths, space, and aesthetics.
     
     
  #8877  
Old Posted Aug 28, 2009, 3:25 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Overbuilt is not that bad... if the lands around the stations get redeveloped then there will be thousands more using the system... and then that extra capacity will be eaten up.

However, to underbuild in a place where ridership is expected to grow is bad practice. The Canada Line will not do well if the redevelopment plans proposed along the route corridors (No 3 Rd + Oakridge + Southeast False Creek - Cambie North) go ahead... all that extra traffic will seriously strain the system to the max.
     
     
  #8878  
Old Posted Aug 28, 2009, 3:30 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ agreed. Though i suppose we should remember they use drivers, whereas we use automated so that enables us to use shorter platforms....BUT what we have is just ridiculous. Like I said, meet them halfway with our platforms (and perhaps aesthetics too)...which brings us to maybe 80-metre platforms.
     
     
  #8879  
Old Posted Aug 28, 2009, 3:34 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,994
and remember, the C-line is fully grade separated, no street level portions such as Seattle's Line.

Again, given the pros and cons of both lines, the C-line comes out on top for me. I will take the small stations with automation & full grade separation over having large stations with drivers and street level portions.

And honestly, 1.9 billion for 3.15 miles? That is insane!
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #8880  
Old Posted Aug 28, 2009, 3:39 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ lol yes, i'd prefer our Canada Line as well. I've been spoiled with automation's high frequencies and grade separation.

Looking back, the Canada Line could have used another $500-million.

I had the opportunity to ride the line again today. I think it would have been an absolutely perfect line if it had 80-metre platforms, or at least the capability for that length in the future.


I wonder how much ridership this 5-km, US$1.9-billion extension will bring.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.