HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    One World Trade Center in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • New York Skyscraper Diagram

• Map Location
• New York Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #5461  
Old Posted Aug 14, 2009, 2:04 PM
Puzzlecraft's Avatar
Puzzlecraft Puzzlecraft is offline
 
Join Date: Nov 2007
Posts: 265
Nice, a tilted corner column!

Is the giant crawler crane going to be able to reach over to the far (west) side for the west side columns or is the crane going to be moved to the other side for that?
     
     
  #5462  
Old Posted Aug 14, 2009, 2:37 PM
uakoops uakoops is offline
 
Join Date: Jul 2009
Posts: 201
Quote:
Originally Posted by Puzzlecraft View Post
Nice, a tilted corner column!

Is the giant crawler crane going to be able to reach over to the far (west) side for the west side columns or is the crane going to be moved to the other side for that?
They are going to put a second crane on that side after they pour the plaza deck.
     
     
  #5463  
Old Posted Aug 14, 2009, 9:05 PM
Zensteeldude Zensteeldude is offline
 
Join Date: Jul 2009
Posts: 692
I see the 3rd floor conection is a seperate piece on the corner column. So there is a temporary brace connecting it to the other column.

In the pics RoldanTTLB posted you can see a brace between the first column and the core steel.
     
     
  #5464  
Old Posted Aug 14, 2009, 10:57 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,287
More pics of the initial column from wtc.com




     
     
  #5465  
Old Posted Aug 14, 2009, 11:13 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,287
Flashback to the east plaza pour...from JOE WOOLHEAD




A little more....JOE WOOLHEAD




     
     
  #5466  
Old Posted Aug 15, 2009, 1:22 AM
uaarkson's Avatar
uaarkson uaarkson is offline
 
Join Date: Nov 2008
Posts: 2,103
Looks like they're pouring the north core.
     
     
  #5467  
Old Posted Aug 15, 2009, 3:11 AM
Gateway395 Gateway395 is offline
 
Join Date: May 2008
Posts: 20
Quote:
Originally Posted by uaarkson View Post
Looks like they're pouring the north core.
Yes big pour busy night at the site.
     
     
  #5468  
Old Posted Aug 15, 2009, 4:02 AM
blue_dragon blue_dragon is offline
 
Join Date: Nov 2004
Posts: 144
progress is slow, but it's really fascinating to follow this project step-by-step
     
     
  #5469  
Old Posted Aug 15, 2009, 4:48 AM
Gateway395 Gateway395 is offline
 
Join Date: May 2008
Posts: 20
Quote:
Originally Posted by blue_dragon View Post
progress is slow, but it's really fascinating to follow this project step-by-step
You have no idea what is going on this massive site it kills me with these comments.
     
     
  #5470  
Old Posted Aug 15, 2009, 12:50 PM
Loslocos Loslocos is offline
 
Join Date: Aug 2009
Posts: 17
With these columns going up, the work on the north core will have to go into overdrive! If the rate is going to be one per day, would that mean the north core will have to raise to the same level as the south in 10(ish) days?

Sounds unlikely, but I'm keepin' the faith!
     
     
  #5471  
Old Posted Aug 15, 2009, 1:16 PM
Loslocos Loslocos is offline
 
Join Date: Aug 2009
Posts: 17
Quote:
Originally Posted by Loslocos View Post
With these columns going up, the work on the north core will have to go into overdrive! If the rate is going to be one per day, would that mean the north core will have to raise to the same level as the south in 10(ish) days?

Sounds unlikely, but I'm keepin' the faith!
Oh, plus a crane jump!
     
     
  #5472  
Old Posted Aug 15, 2009, 3:52 PM
car2004 car2004 is offline
 
Join Date: Aug 2009
Posts: 198
Is it just me or does this building look smaller than it should? I see this pictures when compared to the other buildings and wonder, is that just the elevator?
     
     
  #5473  
Old Posted Aug 15, 2009, 4:25 PM
Puzzlecraft's Avatar
Puzzlecraft Puzzlecraft is offline
 
Join Date: Nov 2007
Posts: 265
The pour is done, the pumping rig is gone, now Vesey street is clear for another column delivery, maybe today?
     
     
  #5474  
Old Posted Aug 15, 2009, 4:37 PM
meh_cd meh_cd is offline
 
Join Date: Jul 2008
Posts: 571
Quote:
Originally Posted by car2004 View Post
Is it just me or does this building look smaller than it should? I see this pictures when compared to the other buildings and wonder, is that just the elevator?
Quote:
Originally Posted by meh_cd View Post
The core area gets smaller as the floors increase.
     
     
  #5475  
Old Posted Aug 15, 2009, 4:44 PM
Plokoon11 Plokoon11 is offline
 
Join Date: Jun 2007
Posts: 1,698
Wow 54 elevators, thats insane! And I am so happy, I can actually now outline the building since that crooked beam went in!
     
     
  #5476  
Old Posted Aug 15, 2009, 6:20 PM
car2004 car2004 is offline
 
Join Date: Aug 2009
Posts: 198
Quote:
Originally Posted by meh_cd View Post
The core area gets smaller as the floors increase.
So you mean the core is small, but the building is exactully wider. I guess from what you are saying, they are working on the core first and the outer part later. Makes sense, if that is what you mean.
     
     
  #5477  
Old Posted Aug 15, 2009, 7:54 PM
car2004 car2004 is offline
 
Join Date: Aug 2009
Posts: 198
Quote:
Originally Posted by Downtown Bolivar View Post
This was supposed to be a monument to New York's strength and determination, but instead it's turned into a monument to New York's government gridlock.
I agree!
     
     
  #5478  
Old Posted Aug 16, 2009, 1:20 AM
Puzzlecraft's Avatar
Puzzlecraft Puzzlecraft is offline
 
Join Date: Nov 2007
Posts: 265
Guessing the date for the north core steel

Looking at my notes, the time from the first South core jump to the fourth and last South core "concrete" core jump was 5 months plus 6 days. The interval time for the North core from first to fourth jump was 5 month minus 6 days or 12 days faster.

For the south core, it took 3 months and 10 days from the last core jump until they started erecting "core steel". If for the north core, the steel onset takes as long, we won't see north core steel until October 28th! Yeah, that seems like forever doesn't it? Maybe it will be faster.... because the south core "wait for the steel" was in the winter while now it is still summer.
     
     
  #5479  
Old Posted Aug 16, 2009, 1:40 AM
uaarkson's Avatar
uaarkson uaarkson is offline
 
Join Date: Nov 2008
Posts: 2,103
It won't take that long. As soon as the concrete cures I bet they'll be putting that — up.

They have to if they want to erect all of the jumbo columns this year.
     
     
  #5480  
Old Posted Aug 16, 2009, 4:49 AM
Zensteeldude Zensteeldude is offline
 
Join Date: Jul 2009
Posts: 692
If you look closely at the erecting steel (core steel) you can see a splice in the columns about 4 feet below the first beam. That is where the core steel was suposta begin.
In other words, there was suposta be another jump of the south core before core steel was erected. I guess things were not happening fast enough so they added 20 feet of columns and put it up ahead of when it was planed.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 1:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.