Light Rail news, the idea is good but will be a hard sell. Since road improvements are decade long projects I would hope this idea would be approved for a "study". The plan has flaws, like if I drive 20 minutes
to get on the train for the last 10 minutes doesn't make much sense.
I would much rather see stations in Hazel Green, Chase, and Decatur.
Then you drive 5 minutes to the train and ride the remaining 30 or so.
A link downtown would be a major catalyst for new development there, especially residences. Bridge Street as in this plan would be the main transfer station. In the meantime these 1960's era roadways will be just fine
By Yvonne Betowt
Times Staff Writer
[email protected]
Plan to link cities, county, Arsenal would cut traffic
MADISON - Doug Gooch just wants everyone to get on board - literally and figuratively.
Gooch, a native of Madison County and longtime resident of Madison, has been working for three years to get local officials to approve a study of a light rail system that would connect parts of Huntsville and eventually Madison and places in Madison County to Redstone Arsenal.
He knows he needs all three public entities - Huntsville, Madison and Madison County - to agree to support it, along with Redstone Arsenal officials.
He went before the Madison City Council to enlist its support for a feasibility study for a light rail system that he says will take thousands of cars off the roads leading to Redstone Arsenal.
"For it to be effective, it will involve all of us," Gooch said. "If Redstone will commit to a percentage of their folks using it, we can get folks to build it."
The study and design, he said, will be funded through the federal stimulus bill under the TIGER (Transportation Investment Generating Economic Recovery) at 100 percent, and the construction will receive 50 percent funding. He expects to have private businesses pick up the other 50 percent, eliminating the cost for any of the three public entities.
"It will show less dependence on the cars, and we won't have to build and maintain as many roads," Gooch told the council members. "We have the catalyst and economic engine to take 600 people every 12 minutes to and from the Arsenal as compared to one car every 30 to 45 minutes. The rail corridors are already in place."
Gooch said one in five vehicles comes from outside Madison County and many people "cut through" Madison en route to the Arsenal. He said a light rail system would help alleviate some of the traffic congestion along the incoming roads such as County Line and Wall-Triana Highway.