Old Posted Jul 14, 2009, 4:47 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by Bureaucromancer View Post
Oh yeah, I'm not going to be able to get to BC for awhile after this opens and I've been wondering, does Waterfront have the same single track platform as the other terminals?
nope. two platforms. see construction photos.
     
     
  #6802  
Old Posted Jul 14, 2009, 5:30 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Quote:
Originally Posted by twoNeurons View Post
I found an article with some interesting information:
  • There were worries about the automated train killing people (apparently a teenage boy was hit?)
anyone know the details on this? I remember the news story as a kid but not the full details.

Also there was a situation with a street sign/pole being tossed over and into the guideway that was on the news near the opening if i remember correctly.
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #6803  
Old Posted Jul 14, 2009, 5:54 AM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
Quote:
Originally Posted by Bureaucromancer View Post
Oh yeah, I'm not going to be able to get to BC for awhile after this opens and I've been wondering, does Waterfront have the same single track platform as the other terminals?
No - two centre island. Waterfront will see trains terminating every 3 minutes, whereas YVR Airport and Richmond will see trains terminating every 6 minutes each.
     
     
  #6804  
Old Posted Jul 14, 2009, 2:16 PM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
In the future when more capacity is needed on the C line won't the single tracking in Richmond create a significant limitation?
     
     
  #6805  
Old Posted Jul 14, 2009, 3:00 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
^ that "future" point on the timeline, to me, would be right after the opening.
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
     
     
  #6806  
Old Posted Jul 14, 2009, 3:38 PM
Bureaucromancer Bureaucromancer is offline
Registered User
 
Join Date: Mar 2008
Posts: 106
I don't exactly love the single track or the platform lengths, but I haven't seen anything yet that suggests the C-line will be any more overcrowded than new lines in the States at opening. That aside, it doesn't look like adding another track in Richmond is actually all that hard (although I wonder if extending platforms for double unit trains might happen first).
     
     
  #6807  
Old Posted Jul 14, 2009, 3:49 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
I honestly don't think overcrowding would be a big problem. Yes, we can't expand our platforms by a lot, but it's not like the initial ridership of 98 B-Line + other suburban buses exceed what the Canada Line can handle on opening date.

Expanding Richmond isn't as easy as it looks... there isn't a lot of room. What might be needed to be done is to close off Richmond-Brighouse and tear down the C-Line portion and install double track guideways instead. Oh well, at least then during the process, we have a double tracked terminus =P
     
     
  #6808  
Old Posted Jul 14, 2009, 4:06 PM
flight_from_kamakura's Avatar
flight_from_kamakura flight_from_kamakura is offline
testify
 
Join Date: Mar 2008
Location: san francisco and montreal
Posts: 1,319
did someone already post this?

http://www.youtube.com/watch?v=n4KTIASW318

the buzzer has posted several. looking pretty good, all told, though the trains obviously look absurdly short, cute little baby trains, vegas monorail style.

i like this one a lot:
http://www.youtube.com/watch?v=JtaKep-48T0&feature=related
     
     
  #6809  
Old Posted Jul 14, 2009, 4:09 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Yes they have been posted already.
     
     
  #6810  
Old Posted Jul 14, 2009, 4:20 PM
lightrail lightrail is offline
Registered User
 
Join Date: Oct 2007
Posts: 809
Quote:
Originally Posted by Gordon View Post
In the future when more capacity is needed on the C line won't the single tracking in Richmond create a significant limitation?
Yes. And if a train stalls in the single-track station, there is no bypass track. There are no sidings on the route to store spare trains, meaning a breakdown or replacement train has to travel to and from the OMC.
     
     
  #6811  
Old Posted Jul 14, 2009, 4:26 PM
crazyjoeda's Avatar
crazyjoeda crazyjoeda is offline
Mac User
 
Join Date: Feb 2006
Location: Vancouver
Posts: 861
The single track shouldn't be a problem at YVR because any expansion there will see the track to loop around.
     
     
  #6812  
Old Posted Jul 14, 2009, 5:30 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by crazyjoeda View Post
The single track shouldn't be a problem at YVR because any expansion there will see the track to loop around.
Is there even enough space for that?
     
     
  #6813  
Old Posted Jul 14, 2009, 5:32 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by flight_from_kamakura View Post
the buzzer has posted several. looking pretty good, all told, though the trains obviously look absurdly short, cute little baby trains, vegas monorail style.
     
     
  #6814  
Old Posted Jul 14, 2009, 5:55 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Does anyone think it's ironic that SkyTrain was called a "Toy" train because it was so short, and now that we're not using the "proprietary" SkyTrain system, we have even shorter trains?

(Shorter than a 4-car MkI)

The platform length suits the airport perfectly. It will never wrap around. It wouldn't really serve much of a purpose and there isn't room. YVR-3 Station will be a future station and probably be situated at the end of the double tracked section. This will allow greater frequency as well. If you look at the track at YVR, there are two cross-track segments at the end. This will give them options as to what they want to do regarding the station (extend the track, create a centre platform or side platforms, position the station to integrate into the new building, etc.)

It will be right in the vicinity of the transition to single track. The Airport's 20-year plan shows no curved track. Canada line trains also have a larger turn radius than SkyTrain.

Last edited by twoNeurons; Jul 14, 2009 at 6:08 PM.
     
     
  #6815  
Old Posted Jul 14, 2009, 6:07 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,652
All this talk about C-Line trains and platforms kills me. If there is any C-Line station that is busier than Broadway within 5 years I'll eat my hat.
     
     
  #6816  
Old Posted Jul 14, 2009, 6:13 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by WarrenC12 View Post
All this talk about C-Line trains and platforms kills me. If there is any C-Line station that is busier than Broadway within 5 years I'll eat my hat.
That's the problem. Short-term thinking instead of long-term thinking.

We've basically built ourselves a much bigger Scarborough RT.
     
     
  #6817  
Old Posted Jul 14, 2009, 6:28 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,089
there's enough stations in richmond - only one is single tracked - the population can't grow that much - its not in the growth plan for the region and one earthquake and everyone will bail anyway
__________________
belowitall
     
     
  #6818  
Old Posted Jul 14, 2009, 6:35 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,997
I just wish they were opening at the full 50m length with the middle C cars already in place. To me that will actually make the trains look a lot larger as well (the fact that it is not just two brain cars connected)

As I have been saying, if the train line is seriously overcrowded 30 or 40 years in the future that will give us the best excuse ever to do a major renovation and we will essentially get a new line!

Also as a side note, in Kobe Japan there actually were a few JR lines that only had 60m platforms and 3 car trains serving them, and this is in Japan!
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #6819  
Old Posted Jul 14, 2009, 6:44 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ i'd rather do it right now, and use the billions that would have been otherwise spent on expanding the line on something else.


I would have been satisfied if they had built platforms (~60-metres), enough for a 20,000 pphpd capacity rather than the 15,000 pphpd we have now. We should have started out with 50-metre platforms today and then extend it in the future to 60-metres. There also should have been more track switches and some STORAGE TRACKS.

20 years from now, we are going to regret that we built the Canada Line this way.
     
     
  #6820  
Old Posted Jul 14, 2009, 6:53 PM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,997
Well 60 meters would not have been enough for another C car i believe, but i do agree it would have been better if they built it to open with 50m with 1 c car, and expandable to 65m and adding another c car. And some storage tracks would have been a good idea (at least one in the underground region) and no single tracking in Richmond. The YVR single tracking is okay because there really is no room for expansion there.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:56 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.