The north core hasn't jumped yet. Maybe within 2 weeks?
Picture is within the last hour:
Meanwhile looks like a big pour is about to happen on the ground level south of the south core. Also the south core form cladding is being removed from the south side of the south core, meaning a different construction method will commence beyond the current level of south core concrete, eventually.
Finally on Vesey St. (N. of the N. core), demolition of the overhang has made progress (lower right).
On another forum, people are asking what the steel forms which were recently removed from Fulton St. were for. Someone here mentioned the steel forms for used for staging material until the plaza to the East was poured. The plaza area is now being used for temporary storage / staging.