Old Posted Jun 17, 2009, 7:25 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,202
I believe this one comes down to Campus Planning actually. And everyone one campus knows just how great they are...
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #3102  
Old Posted Jun 17, 2009, 9:33 AM
Millennium2002 Millennium2002 is offline
Registered User
 
Join Date: Jun 2009
Posts: 1,742
Most people here are probably basing UBC's design based on current bus ridership figures and the number of buses that run to the loop everyday.

However, we must also keep in mind that if and when a Millennium Line station opens at UBC a lot of that bus traffic will be reduced, especially on the busy Broadway corridor were many users will want to switch into a faster mode of transport. Taking that into effect the number of buses needed will fall dramatically.
     
     
  #3103  
Old Posted Jun 17, 2009, 4:57 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Quote:
Originally Posted by allan_kuan View Post
Most people here are probably basing UBC's design based on current bus ridership figures and the number of buses that run to the loop everyday.

However, we must also keep in mind that if and when a Millennium Line station opens at UBC a lot of that bus traffic will be reduced, especially on the busy Broadway corridor were many users will want to switch into a faster mode of transport. Taking that into effect the number of buses needed will fall dramatically.
And when will that be? 2015? 2020? 2025? The M-Line was planned to be done by 1996. The UBC line isn't even planned. It's more a "potential future line" that has had little or no work done on implementing a system (previous studies stopped at Arbutus)

That's a long time from now.
     
     
  #3104  
Old Posted Jun 17, 2009, 6:02 PM
ravman ravman is offline
BANNED
 
Join Date: Mar 2008
Posts: 560
the BC Liberal Liars stated that it would be done by 2020...
     
     
  #3105  
Old Posted Jun 17, 2009, 6:18 PM
Gordon Gordon is online now
Registered User
 
Join Date: Jul 2008
Posts: 1,065
As far as i understand Translink is releasing a pair of studies in the fall on the 2 planned transit lines ( U.B.C. & Surrey).

Has anyone seen the new skytrain cars in full service , because it will take a while to get all the bugs worked out . At least 1\2 of them are supposed to be in service for the return to work & school on Sepr 8th.
     
     
  #3106  
Old Posted Jun 17, 2009, 7:36 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,620
Quote:
Originally Posted by ravman View Post
the BC Liberal Liars stated that it would be done by 2020...
GO GORDO GO!

GO BOND GO!

GO NDP GO! AWAY!

     
     
  #3107  
Old Posted Jun 17, 2009, 9:43 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,114
Smile

Quote:
Originally Posted by ravman View Post
the BC Liberal Liars stated that it would be done by 2020...
So, given that they will likely not do anything (except another study) until 2013 (election year)... we can expect it at the earliest 2020.

And hate to break it to you, but ALL politicians are liars. Just some are better at covering their tracks than others.
     
     
  #3108  
Old Posted Jun 17, 2009, 10:58 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Quote:
Originally Posted by ravman View Post
the BC Liberal Liars stated that it would be done by 2020...
are you really this retarded? go away bro.....no need for you here.....maybe get a job and a friend or 2....you know a life?
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #3109  
Old Posted Jun 17, 2009, 10:59 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Quote:
Originally Posted by WarrenC12 View Post
GO GORDO GO!

GO BOND GO!

GO NDP GO! AWAY!

HELLS YA!
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #3110  
Old Posted Jun 17, 2009, 11:36 PM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
It's a document by TransLink, not the Provincial Government.
     
     
  #3111  
Old Posted Jun 18, 2009, 2:56 AM
osirisboy's Avatar
osirisboy osirisboy is offline
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by ravman View Post
the BC Liberal Liars stated that it would be done by 2020...
Umm ok... well frankly I love the "liberal liars" way better than the ndp socialist nut cases!
     
     
  #3112  
Old Posted Jun 18, 2009, 3:15 AM
mrjauk mrjauk is offline
Registered User
 
Join Date: Oct 2008
Posts: 555
Quote:
Originally Posted by osirisboy View Post
Umm ok... well frankly I love the "liberal liars" way better than the ndp socialist nut cases!
Please define "socialist". Are there any socialists in British Columbia politics? Are there any in the Legislature?
     
     
  #3113  
Old Posted Jun 18, 2009, 3:24 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
If you guys are going to define any political terms or continue talking about politics, you are welcome to do so in the Politics Subforum but not here.
     
     
  #3114  
Old Posted Jun 18, 2009, 3:48 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Can't blame Translink for this one, this is all UBC. Translink is trying to make the best of it and they aren't thrilled about it to say the least. Perhaps this is UBCs way of handicapping the system to help ensure the M-Line extension comes all the way into campus.
     
     
  #3115  
Old Posted Jun 18, 2009, 3:54 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by jlousa View Post
Can't blame Translink for this one, this is all UBC. Translink is trying to make the best of it and they aren't thrilled about it to say the least. Perhaps this is UBCs way of handicapping the system to help ensure the M-Line extension comes all the way into campus.
I don't see why UBC would be doing something so expensive. It doesn't make any sense.
     
     
  #3116  
Old Posted Jun 18, 2009, 3:58 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ i believe the last estimated cost figure for the underground terminal was $30-million, which i highly doubt is sufficient even for this inadequate bus loop. The biggest cost, however, would be put on those who actually use it.
     
     
  #3117  
Old Posted Jun 18, 2009, 3:59 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by mr.x View Post
^ i believe the last estimated cost figure for the underground terminal was $30-million, which i highly doubt is sufficient even for this inadequate bus loop. The biggest cost, however, would be put on those who actually use it.
Isn't UBC in debt already? I don't know, I honestly think this money would be better used for upgrading the current terminal instead. I realize that UBC wants more space for buildings, but at least have it so that it can be integrated with the future UBC Line, whether it's LRT or SkyTrain. Just wait a few more years.
     
     
  #3118  
Old Posted Jun 18, 2009, 4:08 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ not sure about the debt, but the money for the new loop would likely come from the endowment. Translink definitely won't be contributing to it, that's their way of giving the university a middle finger for building a sub-par facility for them to use.

Ideally, i'd like to have a two-level transit station. The first underground level would be the bus platforms, ticketing concourse for SkyTrain, waiting area for buses, and from the ticketing concourse/waiting area for buses there would be a mass of escalators and staircases to the second underground level - the SkyTrain platform.

Inspired by the MTR. ...except both levels there would be train platforms. :p



The 7-platform bus terminal COULD work but ONLY IF SkyTrain (and NOT LRT) is extended all the way to UBC.
     
     
  #3119  
Old Posted Jun 18, 2009, 4:16 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by mr.x View Post
The 7-platform bus terminal COULD work but ONLY IF SkyTrain (and NOT LRT) is extended all the way to UBC.
Honestly, I don't think it would work even if SkyTrain would be built. It's most likely IN THE WAY of the ideal station location... not to mention it won't have a decent connection from the Bus Terminal platform to the SkyTrain platform.
     
     
  #3120  
Old Posted Jun 18, 2009, 4:21 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ lol, well i'm not sure why UBC seems to be in such a rush to build the new underground terminal. It would be more ideal if they waited for the new rapid transit rail line...then again, that could be decades at this rate. :p

But there's absolutely nothing wrong with the existing temporary bus terminal.



The 7-platform bus terminal could work if SkyTrain is also built as much of the bus ridership would be transplanted into SkyTrain.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure