No bus terminals downtown, thank you very much. Especially, no bus terminals at ground level in a shopping area downtown, which will take away from street level attractiveness for pedestrians. Transit should for the most part flow through downtown with the terminals away from downtown. Hurdman is a good example today.
Reply With Quote
     
     
  #2082  
Old Posted Jun 13, 2009, 1:18 AM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by lrt's friend View Post
No bus terminals downtown, thank you very much. Especially, no bus terminals at ground level in a shopping area downtown, which will take away from street level attractiveness for pedestrians. Transit should for the most part flow through downtown with the terminals away from downtown. Hurdman is a good example today.
I think you should travel more to see what's done elsewhere, it's more on B1 level than the ground floor. Plus you'd rather have streets full of buses waiting to pick up passengers then?
Reply With Quote
     
     
  #2083  
Old Posted Jun 13, 2009, 5:40 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Ottawa Suggests That Province Own City's Light Rail
http://communities.canada.com/ottawaciti...that-province-own-city-s-light-rail.aspx
By KENNETH_GRAY 06-13-2009 COMMENTS(0) THE BULLDOG

Filed under: Larry O'Brien, light rail, Dalton McGuinty, Peter Hume, Rick Chiarelli, City of Ottawa, Kent Kirkpatrick, Jim Watson, Diane Deans, Maria McRae, budget, GO Transit
City staff members have approached the province about Ontario owning Ottawa's light-rail project.

"It is certainly a point of discussion," Alta Vista Councillor Peter Hume says. "Absolutely."

Hume is part of a group of councillors and staff who are meeting regularly with Municipal Affairs Minister Jim Watson and John Fraser, an aide to Premier Dalton McGuinty, as Queen's Park does due diligence on the plan.

This is one of the ideas city manager Kent Kirkpatrick and deputy city manager Nancy Schepers have broached to staff from Infrastructure Ontario during continuing talks on rail, Hume said. They have also suggested having the province handle the bidding process for the rail plan and letting Queen's Park manage the construction of the project.

Hume says this is being discussed because the city has lost its "credibility" for doing large projects due to the failure to complete the first light-rail project whose line was to extend from Barrhaven to the University of Ottawa. That lack of credibility makes it difficult for the city to attract bids for the project from large multinational corporations.

At present, the province operates GO Transit in the Toronto area and Hume envisages the possibility of a similar arrangement here, or Ottawa and Ontario sharing responsibility for the project (Hume calls this option O-squared).

"Do they keep it and run it as a mini GO?" Hume asked.

Hume says the possibility of the province owning the project has been discussed by provincial and city staff, but not at the political level.



This is getting interesting...
Reply With Quote
     
     
  #2084  
Old Posted Jun 13, 2009, 2:59 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,676
Quote:
Originally Posted by Kitchissippi View Post
Personally, I like the proposed station on Rideau Street rather than the Mackenzie King bridge area, as it serves the Market area really well. The Market is the late night entertainment district, beyond the operating hours of the Rideau Centre. Also, having the station 10 storeys underground then having street access three storeys up on bridge level would just be ridiculous. The way to address the stupid view of the Rideau Centre management is to reverse the current situation: have the station under Rideau Street but remove most of the buses there and reroute them to the bridge. This would result in a calmer Rideau Street and maybe restore the street level shopping there. Less buses on Rideau would also less traffic on Wellington.

The other thing I like about what is currently planned is the potential for underground pedestrian link between the Sparks Street Mall and the Market, as well as the Canal, avoiding the ridiculous crosswalk situation on the Plaza Bridge area
I do understand your point about providing a more direct transit service to the Byward Market area, but I still don’t think that it out-weighs the benefits of having a Mackenzie-King to Waller station.

The Byward Market is a big tourist draw and THE spot for night life in the city; both of these factors would help provide off-peak ridership. Also, a station under Rideau still provides direct access to the Rideau Centre and DND employees can walk through to DND-HQ. As for an underground walking connection between Sparks Street and the Market, I really, really don’t think that will happen; and I don’t think it should: The Confederation Square area is a very walk-able area and I (and the NCC, I’ll bet) would like it to encourage street-action.

On the other side of the coin (or Rideau Centre) is my idea of having a station stretching under the green-space from the Rideau Centre to the Desmarais Building AND a station spanning under the War Memorial, from Sparks Street to the Rideau Canal. Also, because this gives an extra station downtown, the Downtown-east Station can be pushed west to be under the intersection of Queen at Bank. I think it is more important to have a station under Bank Street than O’Connor.

Having two stations replace the proposed Rideau Station allows for a better distribution of station load. The Memorial Station, as I will call it, offers a single, central, point for tourists to remember and is very identifiable on the streets. Having a central location for tourists is not a small detail. I think the Rideau Station is too far east for tourists to easily see most of their desired destinations upon exiting the station.

Some of you might have believed the Staff when they said that there could possibly be an underground connection from the west side of the canal to a Rideau Station; this is actually very unlikely. In order to make that connection, most of the distance from the street-level access to the station would need to be excavated from the surface; cut and covered. I do not believe that this will happen under the Government Conference Centre nor across the Historic Rideau Canal.



Based on reasoning, I think we can discard the Staff’s “possible” distant station accesses and accept that the shafts will be columnar. There is going to be trouble enough opening up the surface for the narrow shafts so I don’t think huge excavations are going to be acceptable or, in most cases, possible.

Keeping with the excavations, the Memorial Station offers lots of opportunity to dig down without disruption to surface traffic. There can be excavation along Sparks Street, in the centre island of the Square itself, and between Elgin and the canal. For the Rideau Station, there is room where the Mackenzie Overpass is, but there is no opportunity to dig under the Government Conference Centre and the rest might need to be dug down under the Rideau Centre. Since deep holes tend to be wide holes, digging down from Rideau Street will likely involve closing the entire street to traffic, which will force those buses to be moved; likely to the Mackenzie-King Bridge which is already crowded with all of its own bus traffic. And, not only is constructing the Rideau Station MUCH more disruptive, it is technically more difficult and risky.



As can be seen in the above figure, there is a deep bedrock valley under the north of the Rideau Centre. To place a station under the that part of the Rideau Centre will require many piles to be cut and new underpinnings to be constructed; all from within the tunnel and station. Any differential settling will cause damage to the Rideau Centre. There is no such problem constructing the Memorial Station. Nor is there the same problem under the south of the Rideau Centre as the valley is much shallower there.

The following diagram is an older one, showing an alignment directly under the bridge, but it illustrates the point.



Notice that the tunnel and station are well within the bedrock, below any piles. Indeed, since the tunnel would not be ascending here, since the Campus Station is now also to be underground, the buffer space to the piles would be even greater. And even if there was a catastrophe and a pile sank, bridges are far more forgiving of small warps than multi-story buildings. As well, the placement of the station I suggested in mostly under the green-space that Waller runs through. Once a structure was in place to carry the traffic, the station excavation would be simple.

So technically, it is MUCH easier to build a station south of the Rideau Centre than under the north end of it. But there are other benefits to going south and the big one is that there is an extra station to provide easier and more distributed access to the subway.

The Staff plan to have two stations, Downtown-east and Rideau, handle the majority of the transit traffic seems unreasonable to me. Currently, between LeBreton and Campus there are 7 bus stops, excluding LeBreton and Campus; this will be replaced by 3 train stations in the Staff plan. In the main core, there are bus stations at Bank, Metcalfe, Mackenzie-King, and Laurier. Staff want one station at O’Connor and one under Rideau, and claim that the station accesses could “possibly” be quite some distance from the actual station position, thus providing the illusion of many, more closely spaced stations. Since, as I have mentioned above, the accesses will not likely be widely spaced, we will simply wind up with two very large, crowded stations.

Also, if, as I suggest, we have a station at the War Memorial, then this station will provide better access for people working west of the canal, say along Elgin, than a Rideau Station would.

Having a station to replace both the Mackenzie-King and Laurier Bus Stations also better captures riders from the new Conference Centre, DND-HQ, and the north of Sandy Hill and the University of Ottawa. There can be direct accesses to the new Conference Centre (remember they were forced to put aside $1.5M to help pay for a station), the Rideau Centre’s south end (does it really matter if your elevator rises ten stories or twelve? Once you are in it, the extra 10-12 seconds of ride can’t be that significant. The Rideau Centre might help pay for a south-end station, but probably not a north one since they don’t want it there.), DND-HQ (the link already exists), and the second phase of the Desmarais Building (when it gets built).

What about the several hundred late-night revellers from the Market area? I think they can easily walk either along Rideau/Wellington to the Memorial Station or along Nicholas to the Mackenzie-King Station. A few hundred do not out-weigh the needs of the thousands of commuters; whom this system is actually being built for, remember.

Is moving the buses from Rideau to the Mackenzie-King Bridge really a good idea? Currently buses which normally run on the bridge are re-routed to run on Rideau after 1 am and this would probably continue after the tunnel is in. I think it is better to keep the bus routes consistent and have them run on Rideau all the time. Also, once the STO buses weave their way down to Mackenzie-King, they will need to weave back up to Wellington to cross the Portage Bridge. What route would they take and how much disruption would they cause? Remember, one of the big drivers of this tunnel is to get rid of buses along Albert and Slater; to simply move the 140 STO buses, plus all the OC Transpo buses from Rideau, plus all of the residual surface buses after the conversion to Albert and Slater would defeat the purpose of this project. I don’t think the Downtown Coalition would accept the idea.

I think that the original transit layout through the core was well thought out during the initial design of the Transitway and unless there is a VERY compelling reason to change the traffic patterns which have been built-up over the past quarter century, I think that the new route through the core should try to offer as similar a system as possible; only adding enhancements, not negatives. I am not in favour of moving the rapid transit station to Rideau. As it stands, I have suggested effectively moving the Metcalfe stop north by two to three short-blocks, but I think that this is an acceptable compromise to provide better access for tourists and people who have more northern destinations. Also, since most of OC Transpo’s Rideau Street buses travel around Confederation Square, this provides the facility for direct vertical transfers between the subway and surface buses.
Reply With Quote
     
     
  #2085  
Old Posted Jun 13, 2009, 3:34 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by waterloowarrior View Post
Ottawa Suggests That Province Own City's Light Rail
http://communities.canada.com/ottawaciti...that-province-own-city-s-light-rail.aspx
By KENNETH_GRAY 06-13-2009 COMMENTS(0) THE BULLDOG

Filed under: Larry O'Brien, light rail, Dalton McGuinty, Peter Hume, Rick Chiarelli, City of Ottawa, Kent Kirkpatrick, Jim Watson, Diane Deans, Maria McRae, budget, GO Transit
City staff members have approached the province about Ontario owning Ottawa's light-rail project.

"It is certainly a point of discussion," Alta Vista Councillor Peter Hume says. "Absolutely."

Hume is part of a group of councillors and staff who are meeting regularly with Municipal Affairs Minister Jim Watson and John Fraser, an aide to Premier Dalton McGuinty, as Queen's Park does due diligence on the plan.

This is one of the ideas city manager Kent Kirkpatrick and deputy city manager Nancy Schepers have broached to staff from Infrastructure Ontario during continuing talks on rail, Hume said. They have also suggested having the province handle the bidding process for the rail plan and letting Queen's Park manage the construction of the project.

Hume says this is being discussed because the city has lost its "credibility" for doing large projects due to the failure to complete the first light-rail project whose line was to extend from Barrhaven to the University of Ottawa. That lack of credibility makes it difficult for the city to attract bids for the project from large multinational corporations.

At present, the province operates GO Transit in the Toronto area and Hume envisages the possibility of a similar arrangement here, or Ottawa and Ontario sharing responsibility for the project (Hume calls this option O-squared).

"Do they keep it and run it as a mini GO?" Hume asked.

Hume says the possibility of the province owning the project has been discussed by provincial and city staff, but not at the political level.



This is getting interesting...
TERRIBLE idea. It precludes any extension into Gatineau, since the province would have no jurisdiction there.

Personally, I think a single, federally-regulated transit authority should be created for the entire region, independent of the cities of Ottawa and Gatineau and run separately from the politicians.

It should include a 13-member board:

6 representing Ottawa
3 representing Gatineau
3 representing the outlying municipalities - 2 from Ontario and 1 from Quebec
1 representing the NCC

It should be paid by regional property taxes (which are dependant on the level of service received).
Reply With Quote
     
     
  #2086  
Old Posted Jun 13, 2009, 4:56 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,632
Running a transit line construction is very different from establishing an operating authority. I think your comparing nuts and bolts there.
Reply With Quote
     
     
  #2087  
Old Posted Jun 14, 2009, 2:17 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,676
Yup, one project cancelled at a late stage and our credibility is shot. But how are we to rebuild that credibility? By asking others to do things for us, of course. This Council is so weird.

First; the perceived lack of credibility has not been tested. It is possible that Siemen's would not bid as a protest, but there is no indication that others would not bid.

Second; timing is everything. The next election is in 2010 so don't set up the contract to be signed/finalized right around then; have this Council lay the ground work and have the next Council actually lock in the contract. This also allows the election to be an endorsement from the public - or not.

Third; we can not rebuild any credibility by never doing another big project by ourselves. We need to do a REALLY good job on the design of this system so that it is absolutely what we need, then sell it to the public so the majority is 'on side', and then put out a RFI. If companies truly have no interest in dealing with the City, then we can get a 'co-signer', but we need to take control of how this turns out. If we don't, then it will be much harder the next time we need to build something.
Reply With Quote
     
     
  #2088  
Old Posted Jun 15, 2009, 1:54 AM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,676
With the relatively low cost of TBMs (roughly $10M new, or $1-2M used) I was thinking that we should buy two TBMs. One would be for HARD ROCK and it would run from LeBreton to Mackenzie. The second would have a mixed face on it and could also have special features such as Earth Pressure Balance, if needed. It should be a Shielded-TBM so that it builds a lining in the tunnels as it bores. This unit would bore through the upper soil from Hurdman to Waller, parallel to the Transitway.



Having two TBMs would allow the job to get done faster since they would meet in the middle and then be trucked back to the start to do it again.

Because the mixed-face TBM is not as deep, the new underground Hurdman, Lees and Campus Stations are easily built using shallow cut & cover. The machine would gradually descend as it headed north of Campus Station. Although the diagram shows the route following the Transitway, I would actually run it under the new UofO building so that the station can be integrated into the building. This would also move that 'kink' to right beside the station instead of midway between stations, when the train is supposed to be going its fastest.

The Transitway is not disrupted except at the short stretch between Laurier and Waller. This section (where Laurier Station is now) would be excavated to recover the TBM. The buses could be re-routed onto Laurier and Waller between the Mackenzie-King Bridge and Laurier.

The Hard-rock TBM is extracted from the excavation under a new Waller structure built between Mackenzie-King Bridge and Laurier. To minimize the disruption, the structure would be built before the ground is dug out from under it.


1,2: Temporary roads while structures are built
3,4: New structures for Waller
5: TBM Extraction pit and station building access

Again, the new Convention Centre should offer direct access to the subway, as should the new Library. We really need to get away from the City's current definition of 'Integrated'; Billings Bridge Station is NOT integrated with the shopping centre, it is BESIDE it, with a bridge to it. None of the other so-called 'Integrated' stations are really integrated either - including the new Baseline Station and Algonquin College.

Using two TBMs should be able to speed up the job while reducing the surface disruptions.

Last edited by Richard Eade; Jun 15, 2009 at 2:36 AM.
Reply With Quote
     
     
  #2089  
Old Posted Jun 15, 2009, 6:19 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Richard Eade View Post
Yup, one project cancelled at a late stage and our credibility is shot. But how are we to rebuild that credibility? By asking others to do things for us, of course. This Council is so weird.

First; the perceived lack of credibility has not been tested. It is possible that Siemen's would not bid as a protest, but there is no indication that others would not bid.

Second; timing is everything. The next election is in 2010 so don't set up the contract to be signed/finalized right around then; have this Council lay the ground work and have the next Council actually lock in the contract. This also allows the election to be an endorsement from the public - or not.

Third; we can not rebuild any credibility by never doing another big project by ourselves. We need to do a REALLY good job on the design of this system so that it is absolutely what we need, then sell it to the public so the majority is 'on side', and then put out a RFI. If companies truly have no interest in dealing with the City, then we can get a 'co-signer', but we need to take control of how this turns out. If we don't, then it will be much harder the next time we need to build something.
Though you're probably right that handing over the reigns to the province may not be the best idea, creating a regional transit authority as eternallyme suggests might be the best option. City staff/council seems unable to do the job and a 4 year term is too short to do decades long projects properly. Add to that the special circumstances here in Ottawa - mix of federal, municipal, and two provinces, compounded by 3 satellite "cities" across the greenbelt and a board that represents everyone's interests seems like a good idea. Though the devil is in the details I'm sure.
__________________
Francois
Reply With Quote
     
     
  #2090  
Old Posted Jun 17, 2009, 10:17 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Ottawa's LRT-link study to include Carling Avenue


THE OTTAWA CITIZENJUNE 17, 2009 3:02 PM


OTTAWA — The official city study to determine the best way to link Lincoln Fields to the planned light rail network is underway, and it will include Carling Avenue.

City transit planning officials had originally planned to look only at the Ottawa River Parkway and a nearby former tram-way corridor running along Byron Avenue as the western rapid-transit link to the planned light rail system, including a downtown subway.

Carling Avenue was going to be looked at separately as a residential light-rail route. However, after concern was raised at council and by the public against running trains on the parkway, the area to be study was expanded to see whether the Carling route could provide rapid transit service, too.

The study, which will result in a recommended corridor and a plan to build it, is expected to be concluded in 2012.

Councillors on the city’s transit committee endorsed the scope of the study on Wednesday.

© Copyright (c) The Ottawa Citizen
Reply With Quote
     
     
  #2091  
Old Posted Jun 18, 2009, 1:49 AM
Mille Sabords's Avatar
Mille Sabords Mille Sabords is offline
Elle est déjà vide!
 
Join Date: Sep 2006
Location: Big Bad Ottawa
Posts: 2,083
Quote:
Originally Posted by Richard Eade View Post

1,2: Temporary roads while structures are built
3,4: New structures for Waller
5: TBM Extraction pit and station building access

Using two TBMs should be able to speed up the job while reducing the surface disruptions.
What I really like about this staging/recovery area is that is can actually serve a double purpose: dig it a little wider and you have the Stewart Station that I keep clamouring for.

The distance between Rideau and Campus stations is sufficient to insert another station to serve Sandy Hill and Ottawa U. I know us Sandy Hillians use Laurier Station massively. Walking to Campus isn't an attractive alternative, and unless Rideau Station has an accessway around the Nicholas-Stewart corner, I'd call for another station.
Reply With Quote
     
     
  #2092  
Old Posted Jun 18, 2009, 1:58 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
The comment has been made, why is it taking 3 years just to make a recommendation on the western LRT route?

We only spent 1 year developing the whole transportation master plan. Of course, there seemed to have been a predetermined agenda in that case. We expect to have detailed plans for the eastern LRT route in no more than a year.

Like everything else relating to LRT in this city, we seem to be dragging our feet.

I guess we cannot begin construction on the western route until after the tunnel is completed in 2017 or so, so there is no hurry. Of course, what if another special funding program becomes available? We never seem to be prepared for that especially when it comes to funding LRT.
Reply With Quote
     
     
  #2093  
Old Posted Jun 18, 2009, 6:56 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,676
Quote:
Originally Posted by lrt's friend View Post
The comment has been made, why is it taking 3 years just to make a recommendation on the western LRT route?

We only spent 1 year developing the whole transportation master plan. Of course, there seemed to have been a predetermined agenda in that case. We expect to have detailed plans for the eastern LRT route in no more than a year.

Like everything else relating to LRT in this city, we seem to be dragging our feet.

I guess we cannot begin construction on the western route until after the tunnel is completed in 2017 or so, so there is no hurry. Of course, what if another special funding program becomes available? We never seem to be prepared for that especially when it comes to funding LRT.
Good point, but remember the TMP Update 2008 was only a rough sketch on a map; the real work of actually deciding the routes and designing the system is still to be done. I believe the western route study itself is only 20 months + 6 months for the EA, which is the same as the DOTT, I think. But your point about other studies is valid. In fact, the second Open House for the Hospital Link and Cumberland Connection BRT is this coming Tuesday. This study started with over 200 possible routes and is narrowing things down fast.

The starting point:


Drop by, you might be surprised by where they are already.

Notice for Public Open House #2
City of Ottawa – Hospital Link / Cumberland Transitway Connection Study



The City of Ottawa has initiated its pre-consultation / initial planning process for the upcoming Environmental Assessment (EA) Study for the proposed transit links that would connect the Southeast Transitway, the future Cumberland Transitway and Blair Station. This project is being undertaken to improve transit service to the Ottawa Health Sciences Centre and hospital lands; provide east-west bus rapid transit (BRT) network continuity; improve transit service from Ottawa’s east end to central Ottawa; and, address existing and future development issues.

The formal EA process will commence later this year. At that time, a Notice of EA Study Commencement will be issued. This EA Study will be undertaken in accordance with the new Ontario Transit Regulation 231/08 under the Ontario Environmental Assessment Act.

Public participation will form an integral part of the study. The second Public Open House has been arranged to present an update on the study progress and to provide the evaluation of Alternative Design Concepts. The Public Open House is being held on:
Tuesday, June 23, 2009
From 6:00 pm to 9:00 pm
Jim Durrell Recreation Centre
1265 Walkley Road, Ottawa
The City of Ottawa encourages interested persons to provide comments at any time during the pre-consultation or formal EA stages of this study. Please note that with the exception of personal information, all comments collected will become part of the public record.

If you are not available to attend the Public Open House and would like to discuss the project, or would like additional information, please direct your comments and questions to:

Frank McKinney, P.Eng.
Program Manager
City of Ottawa
4th Floor, 110 Laurier Avenue West
Ottawa, Ontario K1P 1J1
Phone: (613) 580-2424 ext. 28540
Fax: (613) 580-2578
Email: [email protected]

or

Andrew Harkness, P.Eng.
Consultant Project Manager
Morrison Hershfield Limited
2440 Don Reid Drive, Suite 200
Ottawa, Ontario K1H 1E1
Phone: (613) 739-3258
Fax: (613) 739-4926
Email: [email protected]

Or visit the project’s website at http://www.ottawa.ca/residents/public_consult/hospital_cumberland/index_en.html
Reply With Quote
     
     
  #2094  
Old Posted Jun 18, 2009, 7:44 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Richard Eade View Post
Drop by, you might be surprised by where they are already.
No surprise, they have screened out all valid routes but the one they were supposed to end up with - typical BS.

Plus, short notice and little (zero?) advertising means this process is being rammed through.
__________________
Francois
Reply With Quote
     
     
  #2095  
Old Posted Jun 18, 2009, 11:48 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
West Transitway from Bayshore Station to Moodie Drive

Public Open House # 1

In November 2008, Ottawa City Council approved its long-range Transportation Master Plan, which identified the construction of the West Transitway from Bayshore Station to Moodie Drive as a priority project required to address significant current transit operational concerns in the west urban community. In order to take advantage of near-term federal and provincial funding opportunities, the City has initiated a study to complete all outstanding planning and design work for this facility.

Public Open House
Thursday, June 25, 2009
6 p.m. to 9 p.m.
Presentation from 7 p.m. to 7:30 p.m.
Crystal Beach Community Association – Maki House
19 Leeming Drive
Ottawa, ON
This project is being planned in accordance with the province’s Transit Projects Assessment Process (Ontario Regulation 231/08). This process requires the consideration of alternative designs, public and agency consultation, an assessment of potential environmental effects, the identification of mitigation measures and the preparation of an Environmental Project Report.
In order to engage the public and obtain feedback into the planning and design for this facility, a consultation program has been developed that includes three public open houses. At this first open house, members of the public will be presented with the following information:

Project history and background;
The new Transit Projects Assessment Process;
Existing conditions in the study area;
The analysis and evaluation of alternative corridors;
Further opportunities for public participation; and
Next steps.

Bay ward Councillor Alex Cullen and representatives from the City of Ottawa and the consulting team will be available at the open house to discuss the project, answer any questions and receive public feedback on any aspect of the study.

With the exception of personal information, comments will become part of the public record.
For more information and/or to submit comments, please contact:

Darryl Shurb, M. Eng., P. Eng.
Senior Project Manager
Infrastructure Services
City of Ottawa
100 Constellation Crescent, 6th Floor West
Ottawa, ON K2G 6J8
Tel: 613-580-2424, ext.16204
Fax: 613-560-6064
E-mail: [email protected]
Reply With Quote
     
     
  #2096  
Old Posted Jun 18, 2009, 11:50 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Leitrim Park and Ride Facility

The City of Ottawa Transportation Master Plan (September 2003) states that "the City will provide park and ride lots at the outer ends of all present and future rapid transit lines." The plan then identifies potential park and ride facilities on the north / south LRT corridor at a number of locations, including Leitrim Station.

The North-South Corridor LRT Project (Rideau Centre to Barrhaven Town Centre) Environmental Assessment Report (September 2005) identified the need for a park and ride lot at this location to provide service for the residents of the Leitrim and Riverside South communities, as well as the large rural area southeast of Ottawa. The Environmental Assessment identifies a Stage 1 development of the park and ride facility consisting of approximately 1200 parking spots and a further 2300 parking spots in the Stage 2 development, as well as access for passenger drop-offs, stops for the feeder buses and the light rail station.

The City of Ottawa has now identified the need for a park and ride (bus) facility to service the immediate needs of this community.

The Leitrim Station Park and Ride Lot Stage 1 includes a park and ride facility of 1268 parking spots to be planned as a multi-phased design construction development in increments of 200 to 250 parking spaces per phase, including drainage, stormwater quality / quantity management, underground services and lighting. Also included are an access roadway, the widening of Leitrim Road to accommodate auxiliary lanes and modifications to Quinn Road. The first phase of development is planned to be opened in 2010.

For further information and/or to submit comments, please contact:
Paul Sauve, P.Eng.
Senior Project Manager
Infrastructure Services
Infrastructure Services and Community Sustainability
City of Ottawa
100 Constellation Crescent, 6th Floor
Ottawa, ON K2G 6J8
Tel: 613-580-2424, ext. 21796
Fax: 613-560-6064
E-mail: [email protected]

Public Open House # 1
The City of Ottawa invites you to attend an open house to discuss the development of the Leitrim Park and Ride facility, to be located just west of Albion Road and south of Leitrim Road.

Public Open House
Monday, June 29, 2009
5 p.m. to 7 p.m.
Riverview Community Centre
4310 Shoreline Road
Ottawa, ON

The City identified the need to introduce a Park and Ride facility along Leitrim Road, just west of Albion Road, to facilitate the interaction between the multiple modes of travel.
At the open house you will have the opportunity to:

Review plans displaying existing conditions and general information on the scope and limits of the recommended design for the Park and Ride facility.
Bring forth any issues pertaining to the project that have not yet been identified.
Discuss the staged expansion of the Park and Ride lot.

Gloucester-South Nepean Councillor Steve Desroches, representatives from the City and members of the consulting team will be available to discuss this project and answer your questions.
Your feedback is an important part of the consultation process. Comments regarding the project should be submitted by July 8, 2009 to:

http://ottawa.ca/residents/public_consult/leitrim_parkride/poh_1_en.html
Reply With Quote
     
     
  #2097  
Old Posted Jun 18, 2009, 11:51 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Maintenance and Storage Facility Public Open House
Public Open House
Wednesday, June 24, 2009
5:30 to 8:30 p.m.
Ottawa City Hall
Jean Pigott Hall
Main Floor
110 Laurier Avenue West

The City’s Transportation Master Plan identified the need for a Maintenance and Storage Facility to support the operation of the future light rail system. Given that the Downtown Ottawa Transit Tunnel (DOTT) project represents the first part of the future rail rapid transit network, the Maintenance and Storage Facility has been included within the scope of this project.

You are invited to the study’s second Public Open House:

Wednesday, June 24, 2009
5:30 to 8:30 p.m.
Ottawa City Hall
Jean Pigott Hall
Main Floor
110 Laurier Avenue West
Materials available for public review will include:
The need for a Maintenance and Storage Facility in the vicinity of the light rail alignment;
Candidate sites investigated for suitability to accommodate the Maintenance and Storage Facility; and
Evaluation of candidate sites.

The Maintenance and Storage Facility will accommodate activities needed to support the operation and maintenance of the light rail system, including:

Heavy maintenance (major repairs);
Light maintenance (minor repairs);
Cleaning (inside and out);
Storage of rail vehicles; and
Signaling and communications control.

The facility will be sized to accommodate the ultimate number of vehicles required, though only a portion of the facility may be constructed initially.

The Study Team will be available at the Open House to discuss the study findings. Information will also be posted on the City’s project website at www.ottawa.ca/tunnel and feedback can be provided online at [email protected].
Reply With Quote
     
     
  #2098  
Old Posted Jun 19, 2009, 2:49 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
It's like a pub crawl for transit consultation around here for the next week or so:

Sat 20 June: LRT tech forum
Tue 23 June: Hospital/Cumberland corridor
Wed 24 June: LRT maintenance yard
Thu 25 June: West Transitway - Bayshore to Moodie
Mon 29 June: Leitrim Park & Ride

From all this consultation, does anyone suppose that any consultation feedback (from any of them) will be incorporated?
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #2099  
Old Posted Jun 19, 2009, 5:42 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Dado View Post
It's like a pub crawl for transit consultation around here for the next week or so:

Sat 20 June: LRT tech forum
Tue 23 June: Hospital/Cumberland corridor
Wed 24 June: LRT maintenance yard
Thu 25 June: West Transitway - Bayshore to Moodie
Mon 29 June: Leitrim Park & Ride

From all this consultation, does anyone suppose that any consultation feedback (from any of them) will be incorporated?
Though they may not incorporate any feedback, it's very important to show up, fill in the comment sheets and e-mail the press, councillors, and any one else who may influence decisions. And when it becomes too obvious the process is fixed, it will have to change.
__________________
Francois
Reply With Quote
     
     
  #2100  
Old Posted Jun 20, 2009, 1:40 AM
the capital urbanite the capital urbanite is offline
Registered User
 
Join Date: Jun 2006
Posts: 662
O-Train track upgrades?

OC Transpo has posted some otrain track upgrade notices on their website. Apparently it is a significant track upgrade along the entire route. Does anyone know what this is all about? I couldn't find it anywhere in council minutes. I though they upgraded the track only a few years ago. How much will this cost?

Apologies in advance if this has been discussed before but i no longer frequent this thread.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:49 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.