Old Posted May 14, 2009, 2:37 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,696
Quote:
Originally Posted by Franky View Post
I think that bringing transit to that mall would help shape it into a more pedestrian friendly area. I live close enough to the mall to walk there and I do. In a way, it's nice to be able to walk directly to the store you want though the parking lots make the distances rather large. If transit allows 25 less parking spaces per bus bay, as was done at St.Laurent, there might be more room for stores and less parking needed. I seem to recall a Toronto proposal that included a Wal-mart that WAS pedestrian friendly so the concept isn't exactly foreign. As the Train Yards complex gets larger and larger, car traffic in the area will become worse and worse and with those 250 buses moving in and out of the depot, could become a problem so transit access will become more important.
Dream on. College Square was built a stone's throw from Baseline station but it is FAR from pedestrian friendly. Transit usage at the Trainyards would probably be way less.
Reply With Quote
     
     
  #1882  
Old Posted May 14, 2009, 4:06 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by Suzie View Post
Certainly some bridges are required to ensure access across a trench. My point was that too many of them were built, as Northwestern, Banting, Hinchey and Carruthers are not busy streets and have bridges nearby. Money could have been saved by not building them.
Northwestern serves Ottawa's largest mosque. Exactly how is it that it would not be at least somewhat busy?

Quote:
With peak headways of two minutes, you’d be looking at a train every minute on average.
True, and they take about 15 seconds to clear an intersection. So that's 20-25 seconds depending on allowance for approach in every minute. Considering that many intersections work using 1 minute cycles it would be no worse than those. And that's for a volume of passengers we haven't even seen yet. Depending on train length, we'd be at 3-5 minutes right now (well, that's not quite fair: ridership might also be higher).

Quote:
I’m sure that would have required a long underpass at Holland and Parkdale, and a below grade station at Tunney’s Pasture. That whole area is really busy during peak periods.
No, it could have been at grade there too. It's not *that* busy. There are plenty of crossings in Calgary that are busier than Tunney's Pasture.

Quote:
Further, I’m not sure whether pressure to have underpasses at Churchill, Lanark and Carleton could have been resisted. In fact, the local community could well have insisted that the entire segment be below grade.
The community at large was ignored when it came to choice of technology, so I'm not sure why they'd be listened to on matters of grade separation. Moreover, there were still tracks in place as far west as Ross/Banting as late as 1982 and as far west as McRae in 1970, so it's not like tracks would be unfamiliar to most of the people living there at the time.

Quote:
Lastly, there would have been the incremental cost of extending the LRT line from Dominion to Lincoln Fields (the existing BRT service uses the Ottawa River Parkway).
Yes, to be paid for from the savings of not excavating a trench and building pricey stations and overpasses. Back then the former CPR corridor was still a quite viable option.

Quote:
I’m also curious as to what the arrangement / alignment would have been through the downtown core. Would Albert Street have been converted to a transit mall?
That was the original plan for the Transitway iirc. I don't think the current system is what the transit planners wanted for either bus or rail. It's possible - though this is purely speculation - that BRT on the surface was regarded as a temporary measure and therefore no point in dedicating a whole street to it and then undoing it a few years later.

Sparks might also have been the chosen route had rail been chosen. At the time the Rideau Centre complex didn't exist but plans were underway for it, so a light rail routing past the old train station and then through the current Rideau Centre complex grounds would have been possible.


Quote:
$2.6M/km is clearly too low for busways. Perhaps, he is basing that number on the cost of bus lanes or HOV lanes, which can be used in some cases by BRT services. Even in that case, the number is at the low end.
That's where the number is coming from but he's using it for a busway. I swear he's stuck in the early 80s when the cost of the system was supposed to be $100M for the ~30km network.

Quote:
I have no problem with using Calgary as the benchmark LRT system since it follows best practices. With regard to BRTs, the TransMilenio system in Bogota has set the bar for best practices and there’s no North American (or Australian) system that comes close to it. Unfortunately, since it is located in a developing country with different cost structures and crowding tolerances, it would be inappropriate to compare its cost performance with that of Calgary.

Still, from an operational perspective, TransMilenio has demonstrated conclusively what a BRT system can achieve if it follows best practices:

- Capacity on par with that of many metro systems. Thus, a similar system in Ottawa with a tunnel would meet combined OC Transpo and STO demand for 2031 and beyond.

http://www.flickr.com/photos/99887786%40N00/2468594299/

TransMilenio uses 4-lane cross-sections in the busiest corridors, just like the would-be bus tunnel (really, tunnels) in Ottawa. Once you've done that you have to be prepared to compare it to 4-track rail systems (i.e. two twin-track rail tunnels) with respect to capacity.

I note also that pedestrians seem to be allowed to cross the TransMilenio at grade, above, and below:


http://www.flickr.com/photos/darilov/2329414198/
"This is our cheap subway system. El Transmilenio"

I guess it's held in as high a regard as the Transitway is here...

Quote:
- Significant reduction in the incidence of bus jams thanks to average dwell times of 15 to 20 seconds (despite severe overcrowding) and the use of multi-berth stations.
It still seems to get them:


http://www.flickr.com/photos/miguelmatus/1353158224/

All the buses here are special high-capacity, high-floor buses with opposite-side doors. That would tend to eliminate express buses from using the system unless there are platforms on the right-hand side of the main corridors (which there aren't) or people don't mind boarding buses from the middle of their neighbourhood streets on mini-platforms. Indeed, further research revealed that the system relies on feeder buses (painted green) that bring people to the main corridors where they transfer onto the trunk buses (the red articulated buses), though some of these red articulated buses are what might be termed "trunk expresses" that skip certain stops (there'd be little point in having four lanes if such routes did not exist). At any rate, neighbourhood-to-downtown express buses as we understand them don't exist on the TransMilenio. Other than the bus design and platform arrangements this picture looks disturbingly familiar I'm afraid.


Ottawa gets bus jams. Brisbane gets bus jams. And Bogotá gets bus jams. It seems to be endemic to BRT. At any rate BRT has taken us as far as it realistically can. It was a somewhat interesting little experiment but now it's time to call it a day and move on to something else, which, mercifully, we finally are.

Calgary is now thoroughly trouncing us: they're up to 300,000 passengers per day on the CTrain, compared to about 250,000 on the Transitway here in Ottawa. They're also opening up new extensions, new lines and lengthening platforms for longer trains while putting on more feeder buses. At the rate things are going, by the time we get our tunnel they may well pass us for the first time ever in rides per capita as well. Ottawa today has fewer rides per capita than it did in 1977 whereas Calgary has substantially more. Why 1977? Because 1977 was before either city had a rapid transit system and in that year the populations of the two cities were the same, so it makes a good base for comparison. At that time our rides per capita were far higher than theirs. We have squandered nearly three decades on a BRT experiment that has not raised ridership (as opposed to patronage, which has increased) one bit whereas Calgary has increased ridership with LRT while also tackling a much greater increase in population (from 475k in 1977 to over a million now, versus 875k or so here in Ottawa). All the while our transit system now costs more to operate and has led to workday length pressures not found anywhere else in the country - the upshot being a long strike with drivers determined not to cave in. The results are clear and the sooner we get on with putting an end to our dependency on BRT the better off we'll be.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #1883  
Old Posted May 14, 2009, 4:22 PM
m0nkyman m0nkyman is offline
Registered User
 
Join Date: Oct 2006
Location: Ottawa
Posts: 2,032
Quote:
Calgary has increased ridership with LRT while also tackling a much greater increase in population (from 475k in 1977 to over a million now, versus 875k or so here in Ottawa
Um. No. The CMA's are very close in population, but Ottawa-Gatineau is larger at 1,130,761 vs Calgary at 1,079,310.

But, yes, the sooner we kill the BRT to downtown experiment, the happier I will be.

BRT's are very useful as high speed corridors between suburban destinations, but they do not work when sent downtown.
Reply With Quote
     
     
  #1884  
Old Posted May 14, 2009, 5:29 PM
Rathgrith's Avatar
Rathgrith Rathgrith is offline
I'm just joking.
 
Join Date: Sep 2007
Location: Ottawa
Posts: 1,164
Quote:
Originally Posted by highdensitysprawl View Post
And that adjective you used to describe 'some developer' adds to the description in a useful manner in which way?
O-Town Hockey is just saying that the developer is acting/acts in a way that is comparable to a product that is used to clean a female orifice.

Its all relative really.
Reply With Quote
     
     
  #1885  
Old Posted May 14, 2009, 6:49 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Kitchissippi View Post
Dream on. College Square was built a stone's throw from Baseline station but it is FAR from pedestrian friendly. Transit usage at the Trainyards would probably be way less.
This is a good example of what not to do - place the station far away from the mall. "stone's throw"? 400 m to the nearest stores, 570 m to the Loblaws, 780 m to the other store and everyone has to cross a busy street - Woodroffe. I don't even consider this transit access.

Elmvale used to be an indoor mall and it was converted to an outdoor type mall similar to OTY (yes much smaller). They have since built new stores (including Starbucks, and Subway?) right next to the transit station. You're on the bus, you see practically every single store available and walk right to it. OTY has these pedestrian medians about every block size distance for pedestrian access. It's not ideal, but it's better than dodging cars trying to park. If they made a covered walkway, it might even be enjoyable. It's 130 m to the farthest end of the mall from the transit station.

OTY will be over 1km from one end to the other. It could probably use 2 stations when fully developed, but even a single station makes it about 500 m to the furthest ends.
__________________
Francois
Reply With Quote
     
     
  #1886  
Old Posted May 14, 2009, 7:00 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by m0nkyman View Post
Um. No. The CMA's are very close in population, but Ottawa-Gatineau is larger at 1,130,761 vs Calgary at 1,079,310.
Um, yes. OC Transpo along with its Transitway does not serve the CMA population, only Ottawa's population, so when comparing to Calgary or anywhere else we have to limit ourselves to Ottawa until such time as there is a reasonably unified transit network in the NCR (particularly downtown). If, for example, STO sent its buses onto Albert and Slater in addition to those of OC Transpo then it would be reasonable to include Gatineau in the population count but for all intents and purposes right now Wellington might as well be Rue Laurier in Hull.

Quote:
BRT's are very useful as high speed corridors between suburban destinations, but they do not work when sent downtown.
Exactly. They would also be good for connecting destinations off the main rapid transit corridors to those corridors. They should be used as "super-feeders" for LRT, particularly on corridors that are roughly perpendicular to the main LRT corridors. Arterial median busways would be very useful in that regard. Examples would be Terry Fox in Kanata and Strandherd in Barrhaven.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #1887  
Old Posted May 14, 2009, 7:34 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Dado View Post
Exactly. They would also be good for connecting destinations off the main rapid transit corridors to those corridors. They should be used as "super-feeders" for LRT, particularly on corridors that are roughly perpendicular to the main LRT corridors. Arterial median busways would be very useful in that regard. Examples would be Terry Fox in Kanata and Strandherd in Barrhaven.
Of course it doesn't work downtown, it's not even BRT downtown. A tunnel would be required for that with off-board ticketing and question asking/answering.

The BRT vs. LRT debate is academic. Ottawa went with BRT but shouldn't have - whatever. Converting BRT to LRT is just silly and very expensive though and that's where we're at now. LRT introduces an extra transfer that BRT avoided. Pluggin up the core with LRT destroys the significant BRT advantage (direct bus to city core) and will make our system worse than it was before LRT.
__________________
Francois
Reply With Quote
     
     
  #1888  
Old Posted May 14, 2009, 9:46 PM
Suzie Suzie is offline
Registered User
 
Join Date: Jun 2008
Posts: 245
Quote:
Originally Posted by Dado View Post
Northwestern serves Ottawa's largest mosque. Exactly how is it that it would not be at least somewhat busy?
Carleton with its bridge and traffic light on Scott is right next door. Only one of the two bridges was really needed.

Quote:
True, and they take about 15 seconds to clear an intersection. So that's 20-25 seconds depending on allowance for approach in every minute. Considering that many intersections work using 1 minute cycles it would be no worse than those. And that's for a volume of passengers we haven't even seen yet. Depending on train length, we'd be at 3-5 minutes right now (well, that's not quite fair: ridership might also be higher).

No, it could have been at grade there too. It's not *that* busy. There are plenty of crossings in Calgary that are busier than Tunney's Pasture.
Each cycle needs to serve the north-south traffic as well as the traffic turning northward from Scott. Parkdale is a busy two-lane street that is linked to the Queensway and the Ottawa River Parkway. It along with Holland provide access to one of the largest employment centres in Ottawa and the only other access is from the Ottawa River Parkway.

It is quite true that peak headways to meet today’s demand would higher than two minutes. However, demand is expected to continue to grow in the future and headways would be expected to become shorter over time. Eventually grade separation would become highly desirable, if not a must, at significant cost and disruption.

Quote:
The community at large was ignored when it came to choice of technology, so I'm not sure why they'd be listened to on matters of grade separation. Moreover, there were still tracks in place as far west as Ross/Banting as late as 1982 and as far west as McRae in 1970, so it's not like tracks would be unfamiliar to most of the people living there at the time.
As we can see from the reaction to proposed upgrades and service expansions to the Georgetown rail corridor in Toronto, the presence of tracks (even active ones) does not remove community pressure to have the tracks put below grade. In the Toronto case, the pressure appears to have succeeded.

Quote:
That was the original plan for the Transitway iirc. I don't think the current system is what the transit planners wanted for either bus or rail. It's possible - though this is purely speculation - that BRT on the surface was regarded as a temporary measure and therefore no point in dedicating a whole street to it and then undoing it a few years later.

Sparks might also have been the chosen route had rail been chosen. At the time the Rideau Centre complex didn't exist but plans were underway for it, so a light rail routing past the old train station and then through the current Rideau Centre complex grounds would have been possible.
It’s too bad a transit mall on Albert was not pursued. It could have yielded significant benefits for either bus or rail options (or both). It would have been a challenge to implement at the time, but less so than today.

Sparks would not have been an ideal choice, given that it is located away from the densest downtown streets.

Quote:
That's where the number is coming from but he's using it for a busway. I swear he's stuck in the early 80s when the cost of the system was supposed to be $100M for the ~30km network.
Like I said originally, I agree he needs realistic numbers.

Quote:

http://www.flickr.com/photos/99887786%40N00/2468594299/

TransMilenio uses 4-lane cross-sections in the busiest corridors, just like the would-be bus tunnel (really, tunnels) in Ottawa. Once you've done that you have to be prepared to compare it to 4-track rail systems (i.e. two twin-track rail tunnels) with respect to capacity.
TransMilenio only has four lanes in its busiest sections. For the other sections, only passing lanes at stations are required. A similar system in Ottawa would probably have, at maturity, four lanes from Hurdman to Lebreton. TransMilenio in Bogota is an at-grade system so the fairest comparison (i.e., apples-to-apples) would be with a 4-track at-grade LRT system, not with a metro. I am not aware of any such system, although I guess one could always multiply by two the capacity of the busiest 2-track at-grade LRT line with adjustments for differing crowding tolerances to obtain a comparable figure.

Irrespective, you only need sufficient capacity to serve future demand levels in Ottawa. A TransMilenio system in Ottawa that is grade-separated (at least in its busy central portion) would meet that threshold.


Quote:
I note also that pedestrians seem to be allowed to cross the TransMilenio at grade, above, and below:


http://www.flickr.com/photos/darilov/2329414198/
"This is our cheap subway system. El Transmilenio"

I guess it's held in as high a regard as the Transitway is here...
This does not correspond to what I've heard. TransMilenio is well regarded by the local population. Their main beef is that it is over-crowded. However, such complaints are typical of transit systems in developing countries.

Quote:
It still seems to get them:


http://www.flickr.com/photos/miguelmatus/1353158224/
I knew you were going to post that picture. It would be interesting to find out what was the cause of the backup. Was it volume related or was it due to something else? Remember, TransMilenio is an at-grade system. Such systems, whether bus or rail based, have to deal with intersections (i.e., cars, people and traffic lights). Was the delay due to a traffic accident at one of the intersections? Was it due to some protest? A window falling off a high-rise hotel? With a tunnel, such a system in Ottawa would be grade-separated in its central portions.

Boarding and alighting on TransMilenio is the same as for a train (i.e., fare collection before boarding, four wide doors across each bus, levelled boarding, etc.) and the drivers are not peppered with questions. So it would not be subject to the biggest sources of delays Ottawa currently faces. Further, dwell times in Ottawa would be less than in Bogota due to much lower levels of crowding.

Rail systems are not immune to delays. When I listen in the morning to Toronto traffic reports on TV, I hear about problems with its rail system and that as a result shuttle bus service is being provided.

Quote:
All the buses here are special high-capacity, high-floor buses with opposite-side doors. That would tend to eliminate express buses from using the system unless there are platforms on the right-hand side of the main corridors (which there aren't) or people don't mind boarding buses from the middle of their neighbourhood streets on mini-platforms. Indeed, further research revealed that the system relies on feeder buses (painted green) that bring people to the main corridors where they transfer onto the trunk buses (the red articulated buses), though some of these red articulated buses are what might be termed "trunk expresses" that skip certain stops (there'd be little point in having four lanes if such routes did not exist). At any rate, neighbourhood-to-downtown express buses as we understand them don't exist on the TransMilenio. Other than the bus design and platform arrangements this picture looks disturbingly familiar I'm afraid.
TransMilenio is described throughout the following document -- http://itdp.pmhclients.com/index.php/microsite/brt_planning_guide_in_english . Part II and Part III are the most relevant (chapters 8 and 11 in particular). The document is a useful read if you want to know more about the problems with BRT systems and how they can be addressed.

Under a similar system here, our regular Transitway routes would be served by high-floor articulated buses with four doors (two in the front and two in the back) on their right side (i.e., the same as today) and use high platforms to ensure levelled boarding. For the expresses, we would have two choices:

- Hub-and-spoke with “trunk expresses” (to use your term) using the same articulated buses as the regular routes.
- Low-floor double-decker buses (two-door, two-staircase model) using low-level platforms.

At least initially, either option would work. Eventually though (say in 20years) the first option, which would still be considerably faster than rail because of the skipping of many stops (probably half of the stops would be skipped), would become more efficient than the second. I would nonetheless seriously consider the second option for the first 20 years given its comfort advantage over articulated buses (or rail cars for that matter) and fewer transfers.

Quote:
Ottawa gets bus jams. Brisbane gets bus jams. And Bogotá gets bus jams. It seems to be endemic to BRT. At any rate BRT has taken us as far as it realistically can. It was a somewhat interesting little experiment but now it's time to call it a day and move on to something else, which, mercifully, we finally are.
See earlier comment about the Bogota bus jam picture.

Quote:
Calgary is now thoroughly trouncing us: they're up to 300,000 passengers per day on the CTrain, compared to about 250,000 on the Transitway here in Ottawa. They're also opening up new extensions, new lines and lengthening platforms for longer trains while putting on more feeder buses. At the rate things are going, by the time we get our tunnel they may well pass us for the first time ever in rides per capita as well. Ottawa today has fewer rides per capita than it did in 1977 whereas Calgary has substantially more. Why 1977? Because 1977 was before either city had a rapid transit system and in that year the populations of the two cities were the same, so it makes a good base for comparison. At that time our rides per capita were far higher than theirs. We have squandered nearly three decades on a BRT experiment that has not raised ridership (as opposed to patronage, which has increased) one bit whereas Calgary has increased ridership with LRT while also tackling a much greater increase in population (from 475k in 1977 to over a million now, versus 875k or so here in Ottawa). All the while our transit system now costs more to operate and has led to workday length pressures not found anywhere else in the country - the upshot being a long strike with drivers determined not to cave in. The results are clear and the sooner we get on with putting an end to our dependency on BRT the better off we'll be.
Calgary is not trouncing us at all. The Census numbers (commuting to work) provide the only consistent set of numbers to compare cities and Ottawa is still ahead of Calgary despite the latter’s advantage in parking costs ($400+ per month downtown) and size of the downtown core.

Further, comparing both cities using 1977 is not appropriate at all. Ottawa is an eastern metro area. Such areas have exhibited a long-term structural decline in transit use, although there have been differences in the timing of these declines. In this sense, what has happened in Ottawa is no different than what has occurred in Toronto, Montreal, New York City, Boston, Chicago, Washington (DC) and Philadelphia, which are all cities with extensive rail systems.

Long transit strikes are not unheard of (e.g., Vancouver had a long bus strike in 2001, although if I remember correctly it was during the spring, not the winter). The reason most are short is because the workers are often quickly legislated back to work. This did not happen in the case of Ottawa for the reasons we all know.
Reply With Quote
     
     
  #1889  
Old Posted May 14, 2009, 10:17 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,646
Quote:
Originally Posted by m0nkyman View Post
^ Have you been to Trainyards? While I'm sure that Marty is a nice guy, as a developer, he's a douchebag who builds crappy big box developments that are the antithesis of everything that I find worthwhile about the urban experience.
Yeah, what he said! Sorry to spark up contraversy, but I think big box malls are a plague on Canada's large urban centres and, to an even larger extent, to our medium-sized cities. Take a trip to Regina, Peterborough, Kingston, etc and you'll see beautiful, pedestrian-oriented, urban form being abandoned for sterile concrete oceans and stores with metal siding, no windows, and no streetfront interaction. Obviously, this is all driven by the almighty dollar, but a little effort to make these centres more pedestrian friendly and nice-looking would go a long way in terms of winning me over (I like a deal just as much as the next guy). Anyway, sorry to offend any big box developers on Skyscraperpage, but please speak to me next time you design one and I'll give you some suggestions .
Reply With Quote
     
     
  #1890  
Old Posted May 14, 2009, 11:27 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by O-Town Hockey View Post
Yeah, what he said! Sorry to spark up contraversy, but I think big box malls are a plague on Canada's large urban centres and, to an even larger extent, to our medium-sized cities. Take a trip to Regina, Peterborough, Kingston, etc and you'll see beautiful, pedestrian-oriented, urban form being abandoned for sterile concrete oceans and stores with metal siding, no windows, and no streetfront interaction. Obviously, this is all driven by the almighty dollar, but a little effort to make these centres more pedestrian friendly and nice-looking would go a long way in terms of winning me over (I like a deal just as much as the next guy). Anyway, sorry to offend any big box developers on Skyscraperpage, but please speak to me next time you design one and I'll give you some suggestions .
It doesn't seem to matter what goes into the official plan, the OMB favours business and so we have Big Box malls. At least the Ottawa Train Yards, due to proximity to the Train Station (rails), is probably not suitable for residential, mixed use, development. Or is that not the reason there is no residential on that site? To me, next best thing is to add a transitway. If people can't live there, bring them there on public transit.
__________________
Francois
Reply With Quote
     
     
  #1891  
Old Posted May 15, 2009, 1:24 AM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,646
Quote:
Originally Posted by Franky View Post
It doesn't seem to matter what goes into the official plan, the OMB favours business and so we have Big Box malls. At least the Ottawa Train Yards, due to proximity to the Train Station (rails), is probably not suitable for residential, mixed use, development. Or is that not the reason there is no residential on that site? To me, next best thing is to add a transitway. If people can't live there, bring them there on public transit.
Just not at the expense of essential services that rely on public transit.
Reply With Quote
     
     
  #1892  
Old Posted May 15, 2009, 2:11 AM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by O-Town Hockey View Post
Just not at the expense of essential services that rely on public transit.
There is a dedicated bus route, and the AVTC with dedicated bus lanes coming, how is that "at the expense of essential services?"

If anything, building these boondoggles will take money out of other city programs that really could use the money.
__________________
Francois
Reply With Quote
     
     
  #1893  
Old Posted May 15, 2009, 4:21 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255

City Wants Province to Take Over Light-Rail Project

http://communities.canada.com/ottawaciti...nce-to-take-over-light-rail-project.aspx
By KENNETH_GRAY 05-15-2009 COMMENTS(0) THE BULLDOG

The monthly light-rail meetings at Ottawa City Hall between top municipal staff and committee chairs and Municipal Affairs Minister Jim Watson have much more significance than previously believed.

Initially thinking was that the meetings were being held so that Watson and provincial public servants could do their due diligence on the current light-rail project before funding it. In fact, it is much more than that.

According to planning committee chairman Peter Hume, the city is trying to forge a "partnership" with the province to construct the project. That might be a polite term for it. In reality, the city is lobbying for Infrastructure Ontario to handle the bidding for the new project and maybe even plan it and manage it.

That's because the city has neither the "ability" nor the "credibility" to bring a new light-rail project to fruition, Hume said. It lost its ability to plan the project when the people who assembled the first project left the city after that plan was canned by council. On credibility, reneging on the agreement with the Siemens' consortium has meant that, in Hume's opinion, the municipality could not run a successful request for proposal. In other words, no companies would bid on a new rail project.

Hume says the city can't build light rail on its own, period. "We don't have the credibility in the marketplace," Hume said in an interview Thursday.

Instead, the municipality needs the province to run the project, Hume said, because it has the respect of potential bidders. The city needs Queen's Park not just for funding, but to take over the light-rail file.

"We need a new relationship" with the province, Hume said. "We need a deeper relationship."
Reply With Quote
     
     
  #1894  
Old Posted May 15, 2009, 6:05 AM
m0nkyman m0nkyman is offline
Registered User
 
Join Date: Oct 2006
Location: Ottawa
Posts: 2,032
Quote:
Originally Posted by Franky View Post
This is a good example of what not to do - place the station far away from the mall. "stone's throw"? 400 m to the nearest stores, 570 m to the Loblaws, 780 m to the other store and everyone has to cross a busy street - Woodroffe. I don't even consider this transit access.
The 'mall' as it exists now was built after the transitway and Baseline Station were already well established. They had an opportunity when they rebuilt to address the fact that they were near one of the busiest transit stations in the city, and next to a major educational institution. Instead they turned their backs on it and made a pseudo big box strip mall.

c.f. Trainyards and the train station
Reply With Quote
     
     
  #1895  
Old Posted May 15, 2009, 11:19 AM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
Quote:
Originally Posted by waterloowarrior View Post

City Wants Province to Take Over Light-Rail Project

http://communities.canada.com/ottawaciti...nce-to-take-over-light-rail-project.aspx
By KENNETH_GRAY 05-15-2009 COMMENTS(0) THE BULLDOG

The monthly light-rail meetings at Ottawa City Hall between top municipal staff and committee chairs and Municipal Affairs Minister Jim Watson have much more significance than previously believed.

Initially thinking was that the meetings were being held so that Watson and provincial public servants could do their due diligence on the current light-rail project before funding it. In fact, it is much more than that.

According to planning committee chairman Peter Hume, the city is trying to forge a "partnership" with the province to construct the project. That might be a polite term for it. In reality, the city is lobbying for Infrastructure Ontario to handle the bidding for the new project and maybe even plan it and manage it.

That's because the city has neither the "ability" nor the "credibility" to bring a new light-rail project to fruition, Hume said. It lost its ability to plan the project when the people who assembled the first project left the city after that plan was canned by council. On credibility, reneging on the agreement with the Siemens' consortium has meant that, in Hume's opinion, the municipality could not run a successful request for proposal. In other words, no companies would bid on a new rail project.

Hume says the city can't build light rail on its own, period. "We don't have the credibility in the marketplace," Hume said in an interview Thursday.

Instead, the municipality needs the province to run the project, Hume said, because it has the respect of potential bidders. The city needs Queen's Park not just for funding, but to take over the light-rail file.

"We need a new relationship" with the province, Hume said. "We need a deeper relationship."
This could be really good or really bad, I'm not sure yet.
Reply With Quote
     
     
  #1896  
Old Posted May 15, 2009, 12:23 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by waterloowarrior View Post

City Wants Province to Take Over Light-Rail Project

http://communities.canada.com/ottawaciti...nce-to-take-over-light-rail-project.aspx
By KENNETH_GRAY 05-15-2009 COMMENTS(0) THE BULLDOG

The monthly light-rail meetings at Ottawa City Hall between top municipal staff and committee chairs and Municipal Affairs Minister Jim Watson have much more significance than previously believed.

Initially thinking was that the meetings were being held so that Watson and provincial public servants could do their due diligence on the current light-rail project before funding it. In fact, it is much more than that.

According to planning committee chairman Peter Hume, the city is trying to forge a "partnership" with the province to construct the project. That might be a polite term for it. In reality, the city is lobbying for Infrastructure Ontario to handle the bidding for the new project and maybe even plan it and manage it.

That's because the city has neither the "ability" nor the "credibility" to bring a new light-rail project to fruition, Hume said. It lost its ability to plan the project when the people who assembled the first project left the city after that plan was canned by council. On credibility, reneging on the agreement with the Siemens' consortium has meant that, in Hume's opinion, the municipality could not run a successful request for proposal. In other words, no companies would bid on a new rail project.

Hume says the city can't build light rail on its own, period. "We don't have the credibility in the marketplace," Hume said in an interview Thursday.

Instead, the municipality needs the province to run the project, Hume said, because it has the respect of potential bidders. The city needs Queen's Park not just for funding, but to take over the light-rail file.

"We need a new relationship" with the province, Hume said. "We need a deeper relationship."
Wow. This puts another nail in the coffin doesn't it.
__________________
Francois
Reply With Quote
     
     
  #1897  
Old Posted May 15, 2009, 12:25 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by m0nkyman View Post
The 'mall' as it exists now was built after the transitway and Baseline Station were already well established. They had an opportunity when they rebuilt to address the fact that they were near one of the busiest transit stations in the city, and next to a major educational institution. Instead they turned their backs on it and made a pseudo big box strip mall.

c.f. Trainyards and the train station
Makes sense, developers not playing ball. Makes one wonder why we bother trying to design liveable communities when developers do as they please.
__________________
Francois
Reply With Quote
     
     
  #1898  
Old Posted May 15, 2009, 12:39 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,696
Quote:
Originally Posted by jeremy_haak View Post
This could be really good or really bad, I'm not sure yet.
I'm thinking it could be good. The normally Toronto-centric Provincial Government would likely ensure that the calibre would be on par with what's happening in the GTA, with less of the myopic half-measures we tend to mete out of city hall and get our dysfunctional council's fingers off the details. It would be great PR for the Ontario Government and restore some sense of their tangibility and visibility in the capital since the dissolution of Regional Government (what have they done for us lately besides work on the Queensway?)
Reply With Quote
     
     
  #1899  
Old Posted May 15, 2009, 12:43 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Kitchissippi View Post
I'm thinking it could be good. The normally Toronto-centric Provincial Government would likely ensure that the calibre would be on par with what's happening in the GTA, with less of the myopic half-measures we tend to mete out of city hall and get our dysfunctional council's fingers off the details. It would be great PR for the Ontario Government and restore some sense of their tangibility and visibility in the capital since the dissolution of Regional Government (what have they done for us lately besides work on the Queensway?)
The problem is, why trust that there was any competence in designing the system? If I were the prov. gov't, I'd start from scratch and do it right. If you start with a bad design (as we have seen) the whole project becomes costly and ineffective.
__________________
Francois
Reply With Quote
     
     
  #1900  
Old Posted May 15, 2009, 1:19 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,742
Quote:
Originally Posted by Franky View Post
The problem is, why trust that there was any competence in designing the system? If I were the prov. gov't, I'd start from scratch and do it right. If you start with a bad design (as we have seen) the whole project becomes costly and ineffective.
If we start from scratch, it's done. You can forget about any light rail for the next 10 years. From my perspective as someone who lives downtown, that might not be a bad thing, eventually traffic will incentivize people to live closer to downtown and thus increase the density inside the "greenbelt".
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.