Quote:
Originally Posted by Dado
You mean like the Transitway itself? With all its unnecessary trenching, grade-separations and pricey stations - unnecessary because had we gone with light rail from the outset much of it would not be needed - the Transitway is a 'gold-plated' monument built with little regard to cost as a legacy to future generations. Insanely, it took a recession and an NDP government of all things to bring some fiscal sense to the monument-building by saying 'No' to the ultimate in gold-plated Transitway extravagance, a massive twin bus tunnel project comprising four subterranean lanes in total. The legacy aspect is clear: just look how emotional Andy Haydon gets when 'his' Transitway is to be converted. Or that John Bonsall finds a need to come back to Ottawa years after he left to also defend 'his' Transitway from conversion to light rail. They're both still disappointed that their legacy is incomplete as it is missing its tunnel. With no bus tunnel on the horizon, the latter of the two went on to work with one of the major consultation companies involved in transitway construction and promoted the concept in places like Brisbane, Australia, which now gets bus jams just like in Ottawa.
So the current tunnel project is just following the well-trodden path established by the Transitway project in monument-building.
|
There are certainly parts of the Transitway that were overbuilt in my opinion. The Lincoln Fields and Queensway stations come to mind and there are no doubt others. They could qualify as monuments, albeit small ones. However, there are instances where the Transitway was quite frugal as existing infrastructure (e.g., the Ottawa River Parkway and Highway 174) was extensively used. I also don’t have major complaints about the Scott Street trench for example, except that too many road bridges were built over it given the low traffic volumes of some streets.
With regards to the Ontario NDP, it is funny that their fiscal sense did not extend to Toronto. The Sheppard subway line, a truly horrendous waste of public money, is a case in point. Certainly, the $1 billion or so that was spent on that white elephant would have yielded much greater benefits had it been used instead to build a downtown bus tunnel in Ottawa (who knows, maybe there would have been some money left over, which would have allowed us to build some of the Transitway segments that are currently missing) . If, on top of that, we had adopted bus rapid transit best practices (you know, really cutting-edge, complex stuff like fare collection prior to boarding, which is something that Brisbane has also failed to do and hence the bus jams), we’d be in great shape right now and set for at least the next fifty years thanks to capacity of 25,000 to 30,000 pphpd. With that level of capacity, the bus tunnel would have accommodated both OC Transpo and the STO. We would have a world-class transit system, the best in Canada. Instead, we are going to end up with a costly rail transit system that has poor door-to-door speed, very limited coverage and terrible integration with the STO/Gatineau, and this after a very disruptive conversion.
I cannot speak for Haydon and Bonsall since I know neither of them. But perhaps they are like me in that they are deeply disillusioned with the process that has led us here. If Haydon does challenge this before the OMB or some other forum, he’ll at least have the facts and common sense on his side:
- The claim that a bus tunnel would have trouble handling demand for 2031 and beyond (14,000 pphpd without the STO and 20,000 pphpd with the STO) is based on total ignorance of how state-of-the-art BRT systems are operated today. The reference documents they used date back to the early 1990s and thus don’t take into account the great BRT innovations of the past decade that are allowing such systems to achieve the capacities of subways.
- The ridership model result that a rail system with longer waits, slower travel times for many trips (i.e., as compared to express buses) and vastly more transfers would garner significantly more ridership than the bus option with a tunnel is completely illogical. Either the modelling was deeply flawed or the model results were tampered with.
- The peer-reviewed studies on modal preferences, which have consistently shown that riders are indifferent between rail and buses when travel characteristics are the same, were ignored. Instead, when there was a discussion of modal preferences, we got totally irrelevant blurbs on stuff like the impact of rail systems on land values.
- The large operating cost advantage of the rail option was calculated using unrealistically low off-peak frequencies (seven times lower than bus frequencies) and did not account for the higher average speed of express buses.