General ramblings about the recommendations:
Tunneys Pasture:
I hate to see the throw-away cost of partially back-filling the trench, and building a huge bus parking area, but that seems to be the best that Staff can come up with.
Bayview:
I absolutely agree that the train should be capable of going directly downtown.
I see that there is no plan to try to re-use the existing Transitway Bridge; Staff have decided that there must be a central platform on the upper level so the tracks are too far apart.
If the bridge is not being used, is there any reason to have the rail elevated over the O-Train track? Why not simply continue the trench and keep all of the lines below grade? This would allow for a single platform for the two interlined routes. Building over the train lines would be much easier if they were already sub grade.
I see they have kept the big (and enlarged by the looks of it) bus lay-up.
(I know they just ran a new water main along Bayview, but it is pressurized so it can be lowered here.)
LeBreton:
Why is the line so far from the canal? Why not run it where the Transitway currently is? The farther south the line is, the higher the road needs to go, unless the track is in a trench, and the more developable land is used.
I still say the line should run straight from LeBreton east under Slater instead of through the reversing curves to get to Albert.
Downtown General:
When I look at the 300m catchment circles, they don't touch: This means that the stations are more than 600m apart. In fact, the 500m ring only just reaches the 300m circles for some of the stations. I think the spacing to too great.
Campus:
I agree that the tunnel should continue as far as possible south: In fact, I would like to see it continue to Hurdman - but that won't happen.
In the Technical Briefing document, the position of the Campus Station is roughly in its current location. The Station Location Map shows it as being farther north. I don't know which is correct, but I suspect it will be in roughly the current location.
Lees:
Apparently the Lees Station 'NEEDS' to remain within the current corridor so that no contaminated land is disturbed. Personally, I would like to see them clean up the area instead of ignoring the problem.
I do find it odd that the station appears to be moved north, but they are balancing the distances to the neighbouring stations.
Also, the Robinson area is going to be re-developed sometime.
Hurdman:
It is a shame that they are ensuring that the S-E Transitway never gets converted to rail.
Train:
It looks as if all three structures will need to be replaced.
This station will cost more than they are expecting: The plan, from what I heard, is to bury the station so that the lawn can be restored in front of the VIA Station. If the Baseline Station is $207M, then expect this area to be about $100M. (Of course, the cost could nix the plans to replace the lawn.)
If three structures and a tunnel station is to be built, why not move the line to provide better access to the Train Yards?
St.Laurent:
Nothing to say about this one.
Cyrville:
Nothing to say about this one.
Blair:
I think this is going to be a very expensive station, and even more expensive to extend the line. This may be the east end equivelent of Baseline Station.