  #1281  
Old Posted Apr 21, 2009, 11:54 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
No her stance is that if the line was originally built in the first place, it would've only cost $800 mil. They fully understand it'll cost $1.4 billion dollars now and will fully fund that amount to get Skytrain to Coquitlam like originally intended back in the late 90s.

I don't like Carole any more than you guys but read the article carefully. Twisting people's words and spreading misinformation sucks whether you're an NDP or Liberal supporter.
     
     
  #1282  
Old Posted Apr 22, 2009, 6:20 AM
racc racc is offline
BANNED
 
Join Date: Oct 2008
Posts: 1,241
Quote:
Originally Posted by WarrenC12 View Post
Classic NDP complaining. Where's their results?
The Millennium Line which was finished $60 million under budget. The Evergreen Line would have been started right after the Millennium Line was completed. The bottom line is that Campbell delayed it.
     
     
  #1283  
Old Posted Apr 23, 2009, 11:14 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,568
Quote:
Originally Posted by racc View Post
The Millennium Line which was finished $60 million under budget. The Evergreen Line would have been started right after the Millennium Line was completed. The bottom line is that Campbell delayed it.
The M-Line aka the road to nowhere? I live near it now, but as the 2nd major link, it's a complete joke geographically.

If the NDP are so budget conscious, why didn't they let Steve Wynn build us a free convention centre?
     
     
  #1284  
Old Posted Apr 23, 2009, 11:28 PM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,110
Quote:
Originally Posted by WarrenC12 View Post
The M-Line aka the road to nowhere? I live near it now, but as the 2nd major link, it's a complete joke geographically.

If the NDP are so budget conscious, why didn't they let Steve Wynn build us a free convention centre?
I used to have to take a bus along Lougheed before the M-line. It sucked. Before the M-Line, there was really only one viable choice to get downtown from the tri-cities: drive. I've never lived in the Tri-cities, but I wouldn't say it goes nowhere, it's just only half-built.

Where the NDP made the mistake is they should've committed and signed contracts for extensions, like the Liberals have done with the Port Mann.

Smart move, next gov't can't really kill it and so they're forced to finish it, without getting any of the credit.

We'd have a seamless SkyTrain from Coquitlam to Granville St. by now if that were done.
     
     
  #1285  
Old Posted Apr 24, 2009, 12:19 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by WarrenC12 View Post
The M-Line aka the road to nowhere? I live near it now, but as the 2nd major link, it's a complete joke geographically.

If the NDP are so budget conscious, why didn't they let Steve Wynn build us a free convention centre?
Well, in all fairness the Millennium Line under NDP plans were to include the Evergreen and Broadway extensions as phase II...for a 2006 completion. So really, all those complaints back then about the M-Line with its lower than expected ridership was because the line was only half built.

I couldn't agree more with the last part, though I believe it was the City of Vancouver that didn't let Wynn build his casino-resort-convention centre.
     
     
  #1286  
Old Posted Apr 29, 2009, 3:32 AM
STEELWHEELS STEELWHEELS is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, B.C.
Posts: 31
I think this project could have an early contruction start if it was done in two phases. The first phase just to the Burquitlam Plaza Station, then the last phase building the tunnel and remaining part of the line. The designs for Lougheed Station's Coquitlam Centre platform, and the criss-crossing guideway onto North Road have already been completed, just needing to be dusted off. One would think that the environmental review for this section would be simple, as there are no streams to cross over. By getting the Burquitlam section done early, the 97 B-Line bus route could be shortened up, avoiding the rush-hour gridlocked area around Lougheed Mall.
     
     
  #1287  
Old Posted Apr 29, 2009, 4:44 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
At this point, I'll be glad to see it start at all.
     
     
  #1288  
Old Posted Apr 29, 2009, 5:12 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
At least they should start working on the third platform for Lougheed station now...
     
     
  #1289  
Old Posted Apr 29, 2009, 4:26 PM
metroXpress's Avatar
metroXpress metroXpress is offline
(||||||-||||-||||||)
 
Join Date: Jan 2009
Location: Vancouver B.C.
Posts: 2,220
^ I wonder how it would look like??
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
     
     
  #1290  
Old Posted Apr 29, 2009, 5:36 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
^^^ Better? lol. It could probably use a good pressure washing.
     
     
  #1291  
Old Posted Apr 29, 2009, 8:00 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,568
Can this topic be moved passed "Proposed" yet? All of the funding is in place right?
     
     
  #1292  
Old Posted Apr 29, 2009, 8:02 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
AFAIK it's still 173 million short

And we don't have an official SSP designation that goes between Proposed and U/C - see: http://forum.skyscraperpage.com/showthread.php?t=137997
     
     
  #1293  
Old Posted Apr 29, 2009, 8:03 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
Quote:
Originally Posted by Allen View Post
^ I wonder how it would look like??
Here are pics of a model of the originally proposed configuration for the PMC Line at the Model Shop website.
It shows the turnout for the tracks heading up North Road (as well as the third platform).

http://www.modelshop.bc.ca/porty2/file/4000/4021/4021-1.htm







Model from the other direction:

Last edited by officedweller; Sep 16, 2014 at 5:46 AM.
     
     
  #1294  
Old Posted Apr 29, 2009, 9:53 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,003
i stil understand the platform

If i am coming from braid - I have to exit at the station as it is now - walk downstairs and than back up stairs to the new added on platform? and vice versa if i am coming from coq centre and want to go to braid?
__________________
belowitall
     
     
  #1295  
Old Posted Apr 29, 2009, 10:06 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
Quote:
Originally Posted by SpongeG View Post
i stil understand the platform

If i am coming from braid - I have to exit at the station as it is now - walk downstairs and than back up stairs to the new added on platform? and vice versa if i am coming from coq centre and want to go to braid?
I think you only need to walk down and back up if you're going to Coquitlam.

From the last image, if you label the platform from left to right as 1, 2, and 3, I think platform 1 goes toward Braid, platform 2 goes toward VCC-Clark, and platform 3 goes toward Coquitlam. The stacked configuration for the turn is probably for the inbound and outbound track to switch position when coming into Lougheed station.
     
     
  #1296  
Old Posted Apr 29, 2009, 10:08 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,003
how convenient
__________________
belowitall
     
     
  #1297  
Old Posted Apr 29, 2009, 10:30 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
I don't think the stacked guideways basketweave to switch sides - otherwise the eastbound trains would have to switch over level tracks west of the station to reach that 3rd platform.

I think the stacking is to allow both guideways to adopt the same (or similar) radius of curvature for the turn. It's a very very tight turn.
     
     
  #1298  
Old Posted Apr 29, 2009, 10:39 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,003
so when will demo start on some of the buildings?

i think that garage next to the white spot has to be removed - i think i remember seeing a layout and that building was gone
__________________
belowitall
     
     
  #1299  
Old Posted Apr 29, 2009, 10:41 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,075
Quote:
Originally Posted by officedweller View Post
I don't think the stacked guideways basketweave to switch sides - otherwise the eastbound trains would have to switch over level tracks west of the station to reach that 3rd platform.

I think the stacking is to allow both guideways to adopt the same (or similar) radius of curvature for the turn. It's a very very tight turn.
If you look closely at the last photo, there is indeed a switch. The last pillar in the photo is directly below the upper deck while it is on the east side of lower deck. By switching side, there will only be 1 at-grade switchover at the west side of the station instead of 2.
     
     
  #1300  
Old Posted Apr 29, 2009, 11:25 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,568
Quote:
Originally Posted by GeeCee View Post
AFAIK it's still 173 million short

And we don't have an official SSP designation that goes between Proposed and U/C - see: http://forum.skyscraperpage.com/showthread.php?t=137997
Ahhh the rules... what would we be without rules? Complete savages I'm sure.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump