Rapid Transit: The light rail option
Published: April 20, 2009 4:00 PM
Updated: April 22, 2009 3:08 PM
5 Comments
by DAN KINVIG
and JOE MILLICAN
Abbotsford News
Many of the issues facing Fraser Valley commuters could be solved with the adoption of a light rail system.
That’s the contention of the local advocacy group Rail for the Valley, which is lobbying the provincial government to take advantage of existing rail infrastructure to upgrade the public transit system.
“The future is going to require rail transportation,” said John Vissers, a local Rail for the Valley spokesperson. “Urban areas around North America are slowly making transitions to rail-based infrastructure, and we have to do the same.”
Light rail is a form of rapid transit that operates largely on a dedicated rail track, and refers to the fact that the streetcar-type system accommodates lighter loads. Many light rail systems are powered by overhead electric wires, but some diesel models are also in service.
Rail for the Valley supports the revival of the old B.C. Electric interurban rail line to serve as the backbone of a light rail system linking Chilliwack, Abbotsford, Aldergrove, Langley and Surrey. The 50-kilometre interurban route transported passengers between Chilliwack and New Westminster until the 1960s, and is currently used by the freight transporter Southern Railway.
According to light rail advocate Malcolm Johnston, based on studies of light rail systems in other jurisdictions, a basic diesel system offering hourly trips from Vancouver to Chilliwack could be started for an estimated $500 million. A six-kilometre SkyTrain extension planned for Surrey carries a price tag of $1.1 billion.
“I know there are naysayers about light rail, but I think the movement will take hold,” said Abbotsford Coun. Lynne Harris, who chairs the traffic committee. “I think there’s feasibility to it. The infrastructure is already there, and in terms of economic affordability, it’s an idea that should be explored.”
Advocates also believe that light rail represents a more environmentally friendly solution to transit issues than expanding the road system. Road expansion just increases traffic, Vissers said.
The province is currently assessing the viability of using the interurban rail corridor as part of its Fraser Valley Transit Study. The $400,000 study, launched in late November, is expected to begin the public consultation phase later in the spring. A final report is expected in late 2009.
Speaking at a public forum last year, transportation minister Kevin Falcon noted that the business case conducted for the Evergreen Line linking Coquitlam, Port Moody and Burnaby concluded that SkyTrain technology would draw 2.5 times as many riders as light rail and would reach destinations in almost half the time.
That said, there has been little debate over whether a SkyTrain expansion could stretch to Abbotsford.
It prompted Harris to say last year that Abbotsford had been “shortchanged” when it comes to a B.C. government proposal to only extend SkyTrain’s lines from the existing limit in Surrey out to Langley.
Metro Vancouver’s SkyTrain service is operated by regional transportation authority TransLink.
Spokesman Ken Hardie acknowledged that a SkyTrain-type expansion – whether it be above ground or underground – would be the priciest way to connect Abbotsford to Metro Vancouver.
Light rail would be the next most expensive, he said, followed by rapid bus services.
These buses often have their own dedicated lanes. Their lower cost, when compared to light rail, allow for a larger network at the same price. Technology also means traffic lights can be held green for approaching buses, while bypass lanes can be created to allow the buses to speed past congestion at bridges or intersections.
“We need to look at how many people want to book it through [from Abbotsford] into Surrey, Coquitlam or Vancouver,” he said.
According to Hardie, the provincial study will likely examine whether there is high demand to connect Abbotsford to Metro through transit.
Last week, The News reported that 62 per cent of Abbotsford’s workers have jobs in their hometown. Most commuters travel to Langley and Surrey.
When it comes to reviving the old B.C. Electric interurban rail line, Hardie said a lot of “quite expensive” work would need to be completed before it could be opened. He also questioned whether it accommodates the sites that should be served by a rapid transit service. Another potential problem is that development tends to follow the establishment of any rapid transit network and could impact neighbourhoods that lie close to the track.
Any rapid transit service for Abbotsford is unlikely to come for free, Hardie continued.
TransLink operates the West Coast Express, a commuter train between Mission and Vancouver.
The operating cost for that service in 2008 was $16.7 million, of which TransLink recouped $15.4 million (92 per cent) through fares. That is better than the norm, according to Hardie, who said that on average for all TransLink services, only 53 per cent of operating costs are recaptured through fares. He doubts whether an Abbotsford rapid transit service would turn a profit, leaving taxpayers on the hook for the remainder
“You don’t necessarily have the population density, coupled with the demand for people trying to get from here to there,” he said.
5 Comments
Sort by Community Page Comments feed
Thanks. Your comment is awaiting approval by a moderator.
Do you already have an account? Log in and claim this comment.
*
starstruck60 1 day ago
I would like to know, how in these hard economic times, are we going to get 38 to 42 heavy frieght trains a day off the rail through Langley and onto a different track. That is twice as many trains then the CP tracks that the West Coast Express run on. I New Mexico, They have a heavy rail train like the West Coast Express running up the middle of there major highway. 60 miles of rail for less then 500 billion dollars and built in a year. Runs at up to 100 miles per hour, goes through 7 zones and cost 7 dollar oneway. You can also use your ticket for discounts at over 100 local companies along the way and at hotels.
o Like
o Report
o Reply
o More ▼
o Use Media ▼
Login (optional)
Please log in to Disqus to comment on Abbotsford News.
*
fluffy354 1 day ago
Since the first plans were drawn up in 1988 for the Evergreen line there has been no success. A local engineering plan failed to impress the old Rita Johnston Socreds that went down in 1989-90. Tom Irwin an engineer out of Toronto who has done the Toronto grid said its impossible. The Socreds said it was and through the report out. When the N.D.P. took power the politicians resigned and the group folded.
Two years later in 1992 The NDP formed a community group called the North East Transportation Committee.
The recomendations were widen the freeway HOV, The Millenium line both still in progress. Twinning the Port Mann with a light rail capacity using the middle of the freeway because there are no level crossings to Abbotsford. The Canada Line which was drawn up in 1990 and waited until the CPR and Translink could figure out Arbutus or Cambie. The province stepped in under the Terms of Union of B.C. and Ottawa and got the money for Cambie because the CPR refused to abandon the Arbutus corridor. This in turn trapped the train route to meet with Skytrain, West Coast express, Seabus and the Richmond Airport section.
In 1992 it was confirmed the Millenium line would go to UBC. All cars were ordered and there is no going back. A ten year lead time is required.
Yesterday the announcement of high speed on the Cascadia Corridoe will add stimulus for high speed rail up the valley to Abbotsford where the two intersect on the new Sumas route. The route now has a slow go through White Rock at 15 mph for 2 miles, at Cresent Beach the curve and crossing problems not to mention the tressle problem at 20 mph. None of the exsists between Bellingham and Abbotsford. So from Abbotsford a straight shot down the freeway to Vancouver. Time curently to finish 15 years. However it could be quicker if campbell shortens the length of time on Peter Kiewi the Contractor.
The group for High Speed should be awarded something as a recognized community group sitting on various Committees and holding public forums. railforthevalley.com has been noticed by The president of the U.S. for there work up here. He ordered money and funding last week. Many politicians on both sides of the border are watching this rail configuration. In the past I have worked with them all on the projects and still do as a community liason and volunteer planner and contributor.
One of the future commuter rail runs will be on the E&N railway on Vancouver Island. High speed rail is also been touted for Whistler. Now the highway is finished thre railway down below is a mess and CN with lots of money will want to straighen it all out. There mainline is the Fraser canyon, but a good secondary would be that route from Prince george thru Edmonton. There is an upgrade paragraph in the BCR sale to CN.
Bryan Vogler
o Like
o Report
o Reply
o More ▼
o Use Media ▼
Login (optional)
Please log in to Disqus to comment on Abbotsford News.
*
jameswatt 1 day ago
Not to mention that if CP wasn't charging ridiculous amounts for track fees to the West Coast Express it would be turning a profit!!
o Like
o Report
o Reply
o More ▼
o Use Media ▼
Login (optional)
Please log in to Disqus to comment on Abbotsford News.
*
ZweiSystem 1 day ago
Hardie is just not telling the truth!
Quote: "He doubts whether an Abbotsford rapid transit service would turn a profit, leaving taxpayers on the hook for the remainder "
Hardie certainly doesn't say that SkyTrain is currently subsidized by over $200 million annually!
Quote: "You don’t necessarily have the population density, coupled with the demand for people trying to get from here to there,” he said."
Neither does the $2.5 billion RAV/Canada line, but the government funnelled all sorts of tax money into that scheme.
Quote: "Any rapid transit service for Abbotsford is unlikely to come for free, Hardie continued."
A Vancouver to Abbotsford SkyTrain at over $100 million/km. to build, would cost well over $8 billion; Diesel LRT, track-sharing with the SRR of BC costing an average of $10 million/km. could cost as little as $800 million! A limited 90 minute service, about $500 million.
Quote: "Another potential problem is that development tends to follow the establishment of any rapid transit network and could impact neighbourhoods that lie close to the track."
Um no, unless zoning is changed. LRT preserves neighbourhoods, while SkyTrain destroys them.
o Like
o Report
o Reply
o More ▼
o Use Media ▼
Login (optional)
Please log in to Disqus to comment on Abbotsford News.
*
fluffy354 1 day ago
Skytrain is great and has saved the people millions if not billions in litigation and mourning of the dead and injured people and families. Fact undisputed, Skytrainhas no level crossings. It was built that way for the safety of everbody. ASk Via Rail what it costs for a simple car demoliished by a 2 3000 hp road engines with twenty cars behind it. Ask them what the people look like inside the train after the emergency stop if there was one.
It a 🞵🞵🞵🞵🞵🞵 mess, you cut your way into cars and haul the dead out. The firemen look after the wrecked car with a nice family in it. if you want to comprimize safety at any price then level crossings is the place to go. They have been there since the railway started long before cars. So if the congestion gets worse the more crossings are needed and there is no solution for this suicide run except overtop or tunnelling or a seperate right of way. Both the Canada Line and Skytrain will save millions of lives over the long run and I would rather be safe than sorry.
By the way B.C. Southern has gone on the record as not building light rail for that reason. The leverage is on the 365 mph fast train down the middle of the freeway. Hardie knows his stuff, he has been there awhile.
Bryan Vogler
|
http://www.bclocalnews.com/fraser_valley/abbynews/news/43315132.html
|
|
|