  #1621  
Old Posted Apr 8, 2009, 7:59 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Cre47 View Post
Not sure if it was the correct thread but seems there could be a settlement regarding the old N-S LRT mess

http://www.ottawasun.com/News/OttawaAndRegion/2009/04/08/9054916.html
Does this mean Siemens and the cement co. would supply ALL of the LRT/cement for Ottawa without getting other bids? It's also another fictitious reason not to go with another mode if LRT costs balloons out of reach. I agree, what a mess.
__________________
Francois
Reply With Quote
     
     
  #1622  
Old Posted Apr 8, 2009, 8:09 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
has this link been posted? ottawa.ca Southwest Transitway Extension (baseline) website

http://ottawa.ca/residents/major_projects/sw_transit_ext/index_en.html

Reply With Quote
     
     
  #1623  
Old Posted Apr 9, 2009, 6:02 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
the bulldog has some leaked memos about the siemens lawsuit
http://communities.canada.com/ottawacitizen/blogs/bulldog/default.aspx
Reply With Quote
     
     
  #1624  
Old Posted Apr 9, 2009, 7:30 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
If we revert back to surface rail through downtown, what was the whole point of the last 2 years? I would think that Alex Cullen would fight this tooth and nail, since the tunnel was his and the mayor's pet project.
Reply With Quote
     
     
  #1625  
Old Posted Apr 9, 2009, 8:08 PM
m0nkyman m0nkyman is offline
Registered User
 
Join Date: Oct 2006
Location: Ottawa
Posts: 2,032
If we revert to surface rail, I am going to have a conniption fit.
Reply With Quote
     
     
  #1626  
Old Posted Apr 9, 2009, 8:17 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by m0nkyman View Post
If we revert to surface rail, I am going to have a conniption fit.
Could someone remind me (in the other thread) what that surface rail option looked like?
__________________
Francois
Reply With Quote
     
     
  #1627  
Old Posted Apr 9, 2009, 8:19 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,627
lol, if the settlement of the original contract is to restore it, wow, it is truely messed up. I forget, was the train supposed to be on Albert & Slater with buses and traffic? and how far to the east was it to go?

Welcome to path dependence Ottawa! The ultimate tool of policy planning.
Reply With Quote
     
     
  #1628  
Old Posted Apr 9, 2009, 8:23 PM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by lrt's friend View Post
If we revert back to surface rail through downtown, what was the whole point of the last 2 years? I would think that Alex Cullen would fight this tooth and nail, since the tunnel was his and the mayor's pet project.
The result of a big fraud?
__________________
Francois
Reply With Quote
     
     
  #1629  
Old Posted Apr 9, 2009, 9:56 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Surface rail through downtown is not a good option, since it would not increase capacity (they would still have the lights slowing things down) and the safety issues are also a problem.
Reply With Quote
     
     
  #1630  
Old Posted Apr 9, 2009, 10:26 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by kyle_olsen View Post
lol, if the settlement of the original contract is to restore it, wow, it is truely messed up.
Right now, it's all rumours swirling about. However, it's unlikely to be the "original" contract in its entirety.

Quote:
I forget, was the train supposed to be on Albert & Slater with buses and traffic? and how far to the east was it to go?
Well this is the point: what the original project would have done was to introduce a new LRT line to the existing bus traffic (though reduced to 70% of then-current) on Albert & Slater. It was only going to go as far east as the University of Ottawa, an endpoint which precluded it from completely replacing bus service.

We have never seriously looked at the option of removing all or most buses and replacing them with LRT on the surface.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #1631  
Old Posted Apr 9, 2009, 11:41 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by Dado View Post
We have never seriously looked at the option of removing all or most buses and replacing them with LRT on the surface.
Actually, it was looked after. The minimum headway for streetcars is 5 minutes to be actually functionnal. In Toronto, even that headway results in packed streetcars (much like 4 following #2 buses in Ottawa). Plus the downtown can only handle a maximum of a 3-car LRV. This makes it impossible to actually remove the buses. Line ups of buses would be replaced by a line up of streetcars, albeit a much shorter line.
Reply With Quote
     
     
  #1632  
Old Posted Apr 10, 2009, 12:53 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by d_jeffrey View Post
Actually, it was looked after.
No it wasn't, not seriously. Here's the only reference to it in the public open houses:

http://ottawa.ca/residents/public_consult/beyond_2020/tmp/transit/phase1/80_surface_options_en.html

"An LRT-only option would require:
Single car LRT operating every 36 seconds (not practical);
3 or 4 car trains operating every 1.8 to 2.5 minutes (practical); and
3 to 4 car trains require 90 to 120 metres of platform at stations."

Note that this was for 2031 ridership levels - and it was said to be practical. If it's practical for 2031 ridership then it should be practical for 2020 or 2025 ridership, which gives us more time to get the tunnel built.

However, it was ruled out because:

"All surface operations would create an undesirable urban environment that severely impacts adjacent businesses and, while workable in theory, are vulnerable to incidents making ability to deliver reliable rapid transit impractical."

I can't see how trains coming every 2 minutes or so could be any more undersirable than what we have right now. The incidents issue is one that can't be dismissed but it also has to be weighed against another extra 5-8 years of regular bus jams.

Quote:
The minimum headway for streetcars is 5 minutes to be actually functionnal. In Toronto, even that headway results in packed streetcars (much like 4 following #2 buses in Ottawa).
Someone should tell Calgary that, then. When I was last there I timed the interval between two trains (one from the NE line, one from the South line) on 7 Avenue at 75 s. By Calgary's own scheduling they're getting an average of 2.5 min headways on 7 Avenue. You just have to keep the lanes clear of other vehicles.

Quote:
Plus the downtown can only handle a maximum of a 3-car LRV. This makes it impossible to actually remove the buses. Line ups of buses would be replaced by a line up of streetcars, albeit a much shorter line.
The block lengths in downtown Ottawa are enough for 4-car trains @ 30 m per car. Even Bay-Lyon could hold (but only just) a 4-car train because it is a little over 120 m and the cars are actually a little under 29 m in length. The rest of the blocks are in excess of 150 m (in fact, they look like they're 600' - i.e. a standard block of 2 rows of 12 standard 50' lots - or 180 m). That actually makes our blocks longer than Calgary's, which are very close to 150 m (probably 500').

With 4-car trains holding 150 passengers/car at 2.5 min, there's over 14000 pphpd capacity. Were we still in the situation at the year 2000 we'd probably be best going for a tunnel, but things have reached the point now where we can't afford to wait another decade for it. We've run out of time and we need to buy ourselves some more. This is how we can do it.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #1633  
Old Posted Apr 10, 2009, 1:30 AM
Franky's Avatar
Franky Franky is offline
Registered User
 
Join Date: Apr 2008
Posts: 1,551
Quote:
Originally Posted by Dado View Post
However, it was ruled out because:

"All surface operations would create an undesirable urban environment that severely impacts adjacent businesses and, while workable in theory, are vulnerable to incidents making ability to deliver reliable rapid transit impractical."
Wow. Could you imagine transit being delayed and someone in charge actually thinking it matters? Where are the people who made this quote when transit is out for months or a group of protesters bugger up the system or some buses fail and they don't do anything about it?

How much weight can we attach to these "reasons"?

That said, I don't think an LRT-only solution would be best (at the start). We could always (by 2031) double track both Albert and Slater to get the required throughput when the system is built out.
__________________
Francois
Reply With Quote
     
     
  #1634  
Old Posted Apr 10, 2009, 1:38 AM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by Dado View Post
No it wasn't, not seriously. Here's the only reference to it in the public open houses:

http://ottawa.ca/residents/public_consult/beyond_2020/tmp/transit/phase1/80_surface_options_en.html

"An LRT-only option would require:
Single car LRT operating every 36 seconds (not practical);
3 or 4 car trains operating every 1.8 to 2.5 minutes (practical); and
3 to 4 car trains require 90 to 120 metres of platform at stations."

Note that this was for 2031 ridership levels - and it was said to be practical. If it's practical for 2031 ridership then it should be practical for 2020 or 2025 ridership, which gives us more time to get the tunnel built.
These are actually the numbers I was thinking about. For Calgary it works because of the dedicated ROW as well as the barrier preventing traffic crossing. This wasn't planned or studied at all for Ottawa. In Toronto, the Spadina streetcars are a complete mess because of the lack of streetcar priority. The Spadina streetcars are at a 2-3 minutes headways, and it's an unbelievable mess.
Reply With Quote
     
     
  #1635  
Old Posted Apr 10, 2009, 1:41 AM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by Franky View Post
Wow. Could you imagine transit being delayed and someone in charge actually thinking it matters? Where are the people who made this quote when transit is out for months or a group of protesters bugger up the system or some buses fail and they don't do anything about it?

How much weight can we attach to these "reasons"?

That said, I don't think an LRT-only solution would be best (at the start). We could always (by 2031) double track both Albert and Slater to get the required throughput when the system is built out.
There was a truck stuck on Albert last year, 3 hours of bus congestion. This week, a protest, 2 hours of bus congestion. I think the complain is valid enough. Mixed operations just doesn't work for a backbone transit system.

It's the same valid complaint about only 2 stations in the CBD, I'm pretty sure that dug stacked tunnels, and with 3 stations, would cost a lot less than any 2 station bored tunnel. It's just inconvenient for them, that's all. Too bad for 500M$ more, that aspect is never inconvenient for city planners, not to mention the Baseline Station, which I still find it the most ridiculous waste of money. No money for a stadium, but enough money for a BRT and LRT tunnel in a place well it isn't deserved. Again, city of Ottawa as its best.
Reply With Quote
     
     
  #1636  
Old Posted Apr 10, 2009, 2:58 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,806
Surface operation of LRT replacing all buses was discussed by the city and dismissed for a variety of reasons. Why are we rehashing an old FOTO idea that will not be popular with the public?

1. Requiring virtually everybody to transfer to reach downtown will cause unnecessary delays for passengers, especially if their destination is not downtown.

2. The Albert/Slater Coalition will not find a jam of trains any better than a jam of buses.

3. It still does not provide the capacity of Calgary's 7th Avenue, which is not open to regular traffic. Can you imagine the Albert/Slater coalition if we suggested an exclusive LRT mall on one of those streets.

4. All it will take is a single accident blocking LRT to throw downtown transit into total chaos. If you think the buses can be bad, trains will be far worse. At least buses can drive around an accident or be re-routed. You can imagine with that number of trains operating in mixed traffic, accidents involving LRT will be frequent. Remember all the comments about Houston LRT accidents when the last plan was being debated. Let's triple or quadruple the number of trains or train cars and you can expect the problem to be much worse.
Reply With Quote
     
     
  #1637  
Old Posted Apr 10, 2009, 3:18 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,627
^ Just to clear up a point, Calgary does not have barriers to prevent interaction with traffic in the street running portion. The barriers only exist where the train has full priority over the roads.
Reply With Quote
     
     
  #1638  
Old Posted Apr 10, 2009, 3:20 PM
Suzie Suzie is offline
Registered User
 
Join Date: Jun 2008
Posts: 245
Quote:
Originally Posted by Dado View Post
I had started writing a message last week, but then the browser crashed and got rid of everything. When that kind of thing happens, I tend not to return to what I was doing until the annoyance at it all has worn off.
It has happened to me as well. I try to protect myself by writing my messages (if they are long) in Word, saving them often and pasting them once I’m finished.

Quote:
A rapid transit study was done by Winnipeg (I had the link before but laziness has now set in...) citing work from a consultant who mainly does BRT that put 1500 pphpd as the threshold at which LRT was more cost effective to operate than BRT. The N-S LRT was premised on a corridor getting no more than 2500 pphpd when it started service (now downgraded to 1900 in 2031...) and it pegged the cost of operating an LRT system at 88% of the cost of the equivalent BRT system using one-car trains and at 83% using two-car trains. The data was based on Ottawa for BRT and Denver and Pittsburgh for LRT (so not even low-cost Calgary).
http://ottawa.ca/calendar/ottawa/citycouncil/trc/2005/07-06/Document%202%20-%20Bus%20vs%20Rail.pdf
Thanks for the study comparing the Ottawa N-S LRT versus a busway along the same corridor, as I had not seen it before.

It was an interesting read. However, I was unable to find the NPV of the total cost (infrastructure, vehicles, O&M and refurbishment) of both options, even though it is the most appropriate basis for comparison. Using the information available, I did do a “quick and dirty” NPV of both options. The outcome was basically a tie with a very slight edge to the busway option.

I was a bit surprised that the infrastructure costs of the busway option were not far off from those of the LRT option. The study also made the dubious assumption in my opinion that expensive Civis buses would be used under the busway option, as opposed to the same buses as the rest of the fleet.

More importantly, I was really struck at how unimaginative the busway option was in the study. In particular, it completely failed to take advantage of the operational flexibility of buses and the synergies with the rest of the transit network. For example:

• It is hard to believe that, like the LRT, the bus routes using the N-S busway would have terminated at the Rideau Centre. Under a more realistic scenario, they would have continued to Hurdman and beyond (i.e., interlining where appropriate, which saves on operating costs). Perhaps, the main route would have been merged with the 94 and/or some other main routes. As well, the study assumed that there would be no skipping of low-use stations by some bus routes. Given the pattern of demand along the corridor and current practice in other corridors, I'm also unsure whether all bus routes would have started/terminated at Barrhaven (i.e., some could have started/terminated closer to downtown thereby reducing the length of the roundtrip).

• New bus routes could have been established that would take advantage of portions of the new N-S busway. Examples of potential routes include South Keys to Tunney’s Pasture via Carleton University, South Keys to Hull via Carleton University, Barrhaven to Hurdman, Hurdman to Carleton University via Confederation Heights, etc.

• The busway option could easily have incorporated a ramp at Carling to provide the 85 or, better yet, a new BRT line on Carling with fast, congestion-free access to downtown (i.e., a bypass of Bronson). This would have allowed the City to “kill two birds with one stone”: significantly improve transit not only along the North-South corridor but also along the Carling Corridor. The ramp could also have been used by a new bus route linking Carling (with Lincoln Fields or Bayshore as its terminus) with Carleton University and perhaps South Keys.

• OC Transpo would have gained the flexibility to transfer N-S routes between the new busway and the SE Transitway in order to better balance demand in the Central portion (i.e., better equalize bus flows from the East and West).

The above would have generated significant ridership gains and allowed OC Transpo to better manage its system.

I sincerely hope that the City did not decide to pursue the LRT option based on this study.

Quote:
As I wrote earlier, Calgary seems to have used something that worked out to about 3000 pphpd peak hour when the lines were established, though where along the line that would be is not clear. My admittedly not-great understanding is that they use annual boardings/km and since 1990 until the end of the data in 2005 that number has been at or above 1M boardings/km. It should be noted that the boardings/km goes up and down above 1M because every time an extension opens it lowers boardings/km initially and then it trends back up as ridership increases due to the extension. Blair to Place d'Orleans would add about 10 km and nominally require that there be 10M annual boardings from east of Blair - except you're allowed to average out all boardings over the entire length of the line, which lowers the threshold somewhat. Either way, I don't think we'd have any trouble meeting that threshold: already (2006) at the Green's Creek screenline it's above 5300 pphpd during the peak hour. Using the formula* for estimating daily ridership from peak hour, we get a number just shy of 53000. Annualize that over 300 average service days and ridership from Orleans is approaching 16M, or 1.6M/km. In other words, just the section of Blair-Place d'Orleans is already above the historic Calgary average, Greenbelt penalty and all; indeed, it could go all the way to Trim and still be within the Calgary norm. By any measure of a threshold for LRT, we're well above it. Lincoln Fields to Terry Fox is also close today; we're above 3800 at Lincoln Fields, or 11.38M annually. Spread that across the 12 km to Terry Fox and it works out to 950k boardings/km so by the time we'd be in a position to build it there'll be over 1M boardings/km on that corridor as well. What becomes apparent is that it's shocking we haven't already converted the Transitway and shocking that we're not looking at suburban extensions for another generation.
I hope we can agree that LRT extensions need to be evaluated on a case-by-case basis.

In the case of Blair to Place d’Orleans, such an extension would be quite costly to build due to its length, the presence of some interchange and the need for trenching and an extensive transfer station at Place d’Orleans. I would guess something like $200M would be reasonable, but you no doubt have a better estimate than I.

The question becomes whether the benefits, essentially savings in operating costs, would be sufficient to fully offset this large capital investment.

kyle_olsen’s numbers for Calgary (http://209.160.24.7/showpost.php?p=3970947&postcount=1017 ) suggest that a 4-car LRT train would cost $306 per hour to operate. Whether a 4-car LRT in Ottawa could be operated at that cost is an open question. In other words, I’m not sure if Ottawa right now is as cost-conscious as Calgary. $306 per hour is slightly less than three times higher than Ottawa bus costs ($105 per hour for standard bus and $115 per hour for a high capacity bus, at least according to the MRC/Delcan study).

I would expect that there would be savings during the peak periods due to the heavy volumes. How big they would be on an annual basis, I don’t know. During the off-peak periods, I doubt there would be any meaningful savings due to the need to have decent headways like the one you suggested below.

By way of comparison, the last estimate that I saw of the annual savings in bus operating costs generated by the Canada Line in Vancouver was $6.6M for 2010 and $12.9M for 2021. These are the savings generated by replacing a large number of buses (e.g., the 98 B-Line) that currently use congested streets like Granville with a 19.5km rapid transit line, a much more favourable situation than an LRT extension between Blair and Place d’Orleans, which would replace buses that speed along using bus lanes in a 10km stretch of highway with at most two stops. Since the Canada Line itself was estimated at the time to have operating costs of $25M per year, the project was expected to lead to an overall increase in operating costs. I suspect that this reflects TransLink’s emphasis on improving overall service, rather than reducing bus service/costs to the bare minimum.

I want to be clear that I am not a proponent of building busways everywhere and in every situation. Although not as good, bus lanes or HOV lanes are much less expensive and should be used where appropriate. For example, I would not favour building a busway between Blair and Place d’Orleans, since it would be very costly to build yet provide marginal improvement over the current arrangement. Any upgrades to busway need to be justified by a solid business case.


Quote:
That would depend somewhat on the length of train used in off-peak periods, but somewhere in the 5-10 min range seems likely.
Such frequencies would be fine for the suburbs. As I noted in an earlier post, system operating costs will need to be calculated on that basis.
Reply With Quote
     
     
  #1639  
Old Posted Apr 10, 2009, 3:32 PM
Suzie Suzie is offline
Registered User
 
Join Date: Jun 2008
Posts: 245
Quote:
Originally Posted by lrt's friend View Post
Surface operation of LRT replacing all buses was discussed by the city and dismissed for a variety of reasons. Why are we rehashing an old FOTO idea that will not be popular with the public?

1. Requiring virtually everybody to transfer to reach downtown will cause unnecessary delays for passengers, especially if their destination is not downtown.

2. The Albert/Slater Coalition will not find a jam of trains any better than a jam of buses.

3. It still does not provide the capacity of Calgary's 7th Avenue, which is not open to regular traffic. Can you imagine the Albert/Slater coalition if we suggested an exclusive LRT mall on one of those streets.

4. All it will take is a single accident blocking LRT to throw downtown transit into total chaos. If you think the buses can be bad, trains will be far worse. At least buses can drive around an accident or be re-routed. You can imagine with that number of trains operating in mixed traffic, accidents involving LRT will be frequent. Remember all the comments about Houston LRT accidents when the last plan was being debated. Let's triple or quadruple the number of trains or train cars and you can expect the problem to be much worse.
I would add to that the constant blocking/interference caused by taxis/cars/trucks that are weaving in and out of the transit lanes or are making right-turns into parking lots/garages or onto north-south streets (and blocking two lanes of traffic when doing so), the poorly-parked delivery trucks and the delivery/garbage trucks that block all of Slater during the height of rush hour in order back into loading docks. With an at-surface LRT, the end result would be worse than what we have now.
Reply With Quote
     
     
  #1640  
Old Posted Apr 10, 2009, 4:05 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
How ghetto the BRT descriptions look in the paper. Unbelievable.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:14 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.