HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #1541  
Old Posted Apr 1, 2009, 3:04 AM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
There was talk about off-board ticketing, but in Montpellier, their TAM trams have on-board ticketing, which consists of taking your ticket and just having it staped by one of many stamping machines on the train. It's pretty simple, but not secure.

I could just walk onto the train without paying, but it has been said;
''A society that is willing to give up a little liberty to gain a little security will deserve neither, and lose both.'' (George Washington).

__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #1542  
Old Posted Apr 1, 2009, 4:29 AM
Ottawade's Avatar
Ottawade Ottawade is offline
Registered User
 
Join Date: Mar 2007
Posts: 288
Quote:
Originally Posted by AylmerOptimist View Post
I could just walk onto the train without paying, but it has been said;
''A society that is willing to give up a little liberty to gain a little security will deserve neither, and lose both.'' (George Washington).
I think you have your Benjamin Franklin's and your George Washington's crossed. For a number of reasons I'm also pretty sure the spirit of the quote didn't have to a whole lot to do with bus fare
Reply With Quote
     
     
  #1543  
Old Posted Apr 1, 2009, 10:50 AM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
But quoting makes my post look all that more learn-ed!

How about this:
''A city who is willing to give up a little system speed to gain a bit of ticket verification, will deserve neither and lose both.'' George Franklin.

__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #1544  
Old Posted Apr 1, 2009, 3:02 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,651
Don't worry, in a year or two, Ben Washington will be the holder of that panacea of fares, a Presto Smartcard. If he has the 'Pass' version, he'll board by any door on the artic's, just like he does today. On any other bus, boarding will be by the front door, just as it is today. This will be an honour-system fare structure - sort of; since, just as today, there will be Fare Inspectors with hand-held Smartcard readers to verifiy the validity of his pass.

If he has the 'Purse' version of the Presto card, then he will board by the front door and tap his card on the reader. This will electronically 'time-stamp' his card and deduct the fare from its stored value. This will allow the driver to bar his boarding if he has insufficient funds, or require additional cash payment. Since the card is 'time-stamped', it can be validated by the Fare Inspectors. Just like now, except without the need to wait 4 seconds for the paper transfer.

If Ben pays with cash, he will still hold up the line waiting for his paper transfer to be printed; just like now.

The Smartcard will be revolutionary. Not only will people be forced to pay $5.00 for the re-loadable cards, but the minimum re-load will be significant enough that the card issuing body (the GTAFS, based in Toronto) will make a handsome profit from the interest on the funds held. And, of course there is the 1% fee which OC Transpo will have to pay them.

What does the new Presto card mean for the dwell time of buses? I think that ticket riders should be able to get on the bus faster, provided they have sufficient funds stored on their card. If not, then they will hold up the line by then fishing in their pockets for coins and then waiting for a transfer. As at Dec. 31, 2007, tickets accounted for 20.8% of the fares paid. There will be no difference for current pass or cash boarding. And, of course, the smartcard will not reduce the number of questions asked by people boarding the bus.
Reply With Quote
     
     
  #1545  
Old Posted Apr 1, 2009, 6:25 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
^ you're making a lot of assumptions about how things are going to work... farecards work great in other cities I've been too.
Reply With Quote
     
     
  #1546  
Old Posted Apr 1, 2009, 6:29 PM
p_xavier p_xavier is offline
Registered User
 
Join Date: Dec 2006
Posts: 3,568
Quote:
Originally Posted by waterloowarrior View Post
^ you're making a lot of assumptions about how things are going to work... farecards work great in other cities I've been too.
In MTL, I love it. No more waiting in line for your monthly pass as you can charge ahead. You can charge bus tickets from different cities, so you don't have to carry them around. Plus the best of all, you can charge your card on any machine, and it gives you a credit card payment option. I know in MTL, you can't pay cash and use your card, you do one of them, as it's the transit passes or tickets that are stored on the card, not the cash.

Just to get rid of the 2 hours line-up in the rideau centre, it would be a sound investment.
Reply With Quote
     
     
  #1547  
Old Posted Apr 1, 2009, 7:03 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
It works well with the STO in Gatineau also. I have an *express* STO pass and I get 10% off per month for being a smart card (carte à puce) user. Which means it costs me about $80 per month for unlimited use of pretty much the entire system. Couple that with the feds’ transit pass deduction, it costs me just under $70 per month to travel to and from work.

STO also partners with various organizations and events so smart card pass holders can get discounts. So for example last weekend I went to the Salon du livre (book fair) and got two-for-one admission.

The rationale for the smart cards isn’t just to prevent fraud (not really an issue for the STO as there are no rear-boarding buses). It is also useful to transit operators when assessing ridership and where adjustments to routes and services are required. Smart cards give much more reliable and year-round data on transit use than the traditional student counters sitting on the front bench of the bus with a clipboard once a year.
Reply With Quote
     
     
  #1548  
Old Posted Apr 1, 2009, 8:00 PM
Suzie Suzie is offline
Registered User
 
Join Date: Jun 2008
Posts: 245
Quote:
Originally Posted by Dado View Post
I saw these numbers earlier and shook my head in complete disbelief at the Lincoln Fields numbers. They make no sense whatsoever. Currently, there are 3500+ passengers travelling inbound in the morning peak hour between Pinecrest and Queensway Station. So, already there are more passengers travelling along here than they are projecting to transfer at Lincoln Fields in 2031. Something is simply not adding up here. We would have to be losing ridership big time for this projection to be true. That, or I wonder if there isn't some idea floating in the background to keep running express buses from Kanata to downtown Ottawa on the Parkway.
As I said, I was a bit taken aback by the estimates as well.

I would be really surprised if they kept the express buses. While I fully expect that express riders will be upset at losing their no-transfer service, they carry less political weight than downtown business owners. Also, the express buses would probably get bogged down in or just west of the downtown core.

Quote:
Anything above 3000 pphpd is more than good enough for full LRT, even across greenspace. If Ottawa were Calgary, they'd be looking at LRT extensions to Orleans and Kanata already. The N-S LRT was - and still is - justified on less than two thirds of this, nor does Carling hit 3000 and we're going to put LRT there as well. What there isn't justification for are trans-Greenbelt transitway projects (like the Southwest Transitway a few years ago) where bus lanes can provide the interim capacity. We should not be building any more radial transitways unless there's no chance they'll exceed 3000 pphpd or so in the next 20 odd years.
The 3000 pphpd threshold is based on what? Where is the analysis showing that this is the right threshold from a cost-benefit perspective?

What would be the peak and, more importantly, the off-peak frequencies on these outside the Greenbelt extensions?

Carling would be much better served with a BRT service like the B-Lines in Vancouver. It could be done much more quickly and cheaply than with a $250M LRT, and cover a greater portion of Carling, instead of just the O-Train corridor to Lincoln Fields. I find it strange that a city with a supposed BRT mentality would push a costly project like that.

Quote:
Your logic escapes me. If this line of thought applies to extending to Bayshore, then it applies equally to extending to Baseline because what I heard one of the officials say is that they would park half the trains at Lincoln Fields (for people from Kanata) and send the rest to Baseline.

So what you're going to have at LF is a mess: Kanatans will be alternately heading for fullish trains from Baseline or empty trains just coming out of the train parking area, so I'm not too sure how having access to fullish trains actually constitutes an advantage. Another possibility though is that a third platform area - serving a stub track - would be built next to the bus terminal so Kanatans can head for a waiting empty train instead of heading to the regular Transitway platform. But if this is the case - and it would avoid a mess on the Transitway platform and delays to patrons already on the train from Baseline - then Kanatans are no better off than if they were able to get on a train at Bayshore. Indeed, they are worse off since they've had to suffer an extra few kilometres on a bus.
I see what you are saying. But, if there are significant problems, they may end up running all of the trains to Baseline, which is not that far away from Lincoln Fields in any case.

The extra few kilometres on a bus would not be an issue, especially since it would be on a Transitway.

Quote:
What Bayshore gets us (who live inside the Greenbelt) is LRT access to the biggest shopping centre in the west end and it gets us LRT access to the retail and office space along the Queensway near Pinecrest, all without one of those extra transfers that you're usually so concerned about. It can also be done without blowing away two dozen houses.
Yes, I had indeed considered this. At a personal level, an extension to Bayshore could benefit me, although not as much as more frequent, direct BRT service to Bayshore. However, for the people living east of Lincoln Fields, the Rideau Centre (which has many of the same stores as Bayshore and the Market right next door) would be as close if not closer time wise (remember all trains would go to the Rideau Centre). For me (living in Westboro), the Rideau Centre would remain my preferred choice. From this reason, I am very sceptical that Bayshore would attract a lot of transit traffic from the East. Another factor would be the continued availability of free parking at Bayshore (a strong disincentive to using transit). Shopping at Ikea pretty much requires a car.

Of course, other factors could change my mind. For example, if an extension to Bayshore has lower overall cost than completing the Pinecrest to SW Transitway segment as a bus Transitway, this could lead me to change my mind.

Quote:
This is supposed to be addressed by bus priority improvements on Baseline with buses from Bayshore or indeed Kanata itself.
How would Bayshore be connected to Baseline? Via Richmond Road? A new road link? I doubt it would be as good as Transitway service all the way to Baseline and beyond.

Quote:
Umm, it'll cost less to operate and it'll be a better ride for more of the trip while supporting the goal of establishing a town centre in Orleans.
Depending on the frequency, you could save on operating costs. However, how much would the extension cost? To users, I doubt the ride would be much different (empirical evidence suggests that they would be indifferent in cases such as these).

Quote:
I think Montreal Rd gets bypassed due to it being a long way (by walking) from anywhere. If the station were on the north side of the 174 near the Canotek business park with a shuttle bus doing a circuit, that low traffic count could be improved.
The westbound station is already on the north side. To avoid the transfer penalty and the wait for the shuttle, I suspect that the few people that would use this station would probably walk to/from the business park. A shuttle would not attract a lot of riders and would probably be quickly terminated.

This is a low-density business park. This ranks among the least attractive types of development to service with rapid transit.

Quote:
The Cumberland Transitway will only terminate at Blair until the Hospital Transitway is built, after which point most traffic will head that way (maybe one regular route will head to Blair). I just can't see how the Blair Rd interconnection transitway can be justified in the long term.
I hope the Hospital Transitway gets fully built, although I have my doubts.

Quote:
That "estimate" is rubbish unless the City carries on with its BRT-mentality of trenching everything everywhere (just wait for the Hospital and Cumberland Transitways). LRT doesn't require grade separation nearly everywhere like BRT does due to fewer vehicles, better adherence to schedule and tying-in to the signalling system. If they stick to a mainly at-grade alignment, it could probably be done for $50M.
The city document, which I must admit was confusing on this issue, gave a range of estimates: it said the cost of going from Bayview to Lincoln Fields would be $135M using the Parkway and $235M to $295M using Byron (depending upon extent of cover). However, on the same page, the extra of cost of the Byron alignment was shown to be between $200M to $260M. It looks like someone forgot their calculator.

Grade separation may be required to have short headways. You’ll certainly need some trenching around Woodroffe and around any crossing of Richmond. Personally, if I lived in the immediate area, I would prefer a trench, but that's just my view.

Quote:
Now there's a problem we won't have. We're having trouble keeping the drivers we already have and we require lots of overtime from them. Suburban feeder routes could be increased in frequency as well. Combine that with attrition from retirements that will be coming fast and thick when the tunnel finally comes online and we're not going to have to layoff any bus drivers. This really is a non-issue.
I hope you are correct. However, I was told on this forum that Calgary did get rid of a lot of its bus drivers as its LRT system came online. The increased suburban frequencies (which I agree may be required to offset the sting of the increased transfers) would cost money (or, put differently, reduce the operational savings from the conversion).
Reply With Quote
     
     
  #1549  
Old Posted Apr 1, 2009, 8:14 PM
Suzie Suzie is offline
Registered User
 
Join Date: Jun 2008
Posts: 245
I hope that the deployment of the Presto Smartcard will reduce dwell times. However, I tend to be pessimistic about things and assume the worst.

Based on my casual observations of the boarding of STO buses on Rideau, dwell times will still be a significant issue for 40-foot buses. Also, if people switch from monthly passes to the 'Purse' version of the smartcards, dwell times for articulated buses could increase, since they will be restricted to using the front door.

In my opinion, to encourage the use of the smartcards, they should hike cash fares significantly when they are introduced.
Reply With Quote
     
     
  #1550  
Old Posted Apr 1, 2009, 8:24 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Quote:
Originally Posted by Suzie View Post
I hope that the deployment of the Presto Smartcard will reduce dwell times. However, I tend to be pessimistic about things and assume the worst.

Based on my casual observations of the boarding of STO buses on Rideau, dwell times will still be a significant issue for 40-foot buses. Also, if people switch from monthly passes to the 'Purse' version of the smartcards, dwell times for articulated buses could increase, since they will be restricted to using the front door.

In my opinion, to encourage the use of the smartcards, they should hike cash fares significantly when they are introduced.
Why would articulated boarding be restricted to the front door?

I agree, that's what they did in London
Reply With Quote
     
     
  #1551  
Old Posted Apr 1, 2009, 8:26 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,651
My point is not that the Presto card will not work "fine" here, but that if we expect it to reduce the bus dwell times at stops, we might be hoping for too much.

With the current paper passes, people can board quickly by the front door, with only a quick glance from the Operator, or board by the rear door on the artic's. This will not change with the new smartcards. (I have not heard yet if there is to be a Photo-Id associated with the pass, but I think they are leaning that way - I'll try to find out.)

People who pay cash will still take the same long time getting on the bus, and waiting for their transfer/POP. This will not change at all with the introduction of the Presto card.

Ticket users will be the only group which has the potential to speed up the service. If all goes well, then things should be faster since they will not need to wait for a transfer/POP. If a person is rejected due to insufficient funds, then it might take longer for that person to stand in the doorway and fish through their pockets for the exact change (or as close to it as they can get). How closely will people track the amount left on their card? Will "Insufficient Funds" be a common problem? With almost 21% of riders currently using tickets, I hope that there can be a decrease in stop dwell times, but it might not be as large as some people think.

As for the financial costs, people will now be buying a Presto card from the GTAFS and not from OC Transpo. (This is an assumption; it might be that OC Transpo actually does get to hold the money from their sales. I'll try to find that out too.) In the past, OCTranspo liked to have a large portion of the month's income for the entire duration of the month. It allowed them to plan for expenses better (and collect any interest). If that money is held else where, will they have the same benefit?

How much of an affect will the loss of 1% of OC Transpo's pass and ticket income have? GTAFS is charging OC Transpo a 1% administration fee for allowing OC Transpo to use the Presto card.

I don't know what the minimum 're-load' value will be, but I have heard talk of $20. If each person who would have bought a $10 sheet of tickets will have to load their card with $20, then the holder of the money just doubled their interest income.

The card database will be downloaded to the buses each night as they sleep. If a person has, say two trips left in his 'purse', but trys to take three trips, the third trip will be flagged as out of funds. I have heard that there might be an 'auto re-load' option for the cards, but I expect that this would only happen over-night. My understanding at this point is that there is NO real-time updates between the buses and the database. The person would need to pay a cash fare (which is substancially higher than a ticket fare, recall) for that third trip. Of course, by the next day, they would again have $20 on their card. It is possible that there will be a 'credit' feature, or over-draft protection for people who have the 'auto re-load' option. This would allow the third trip and deduct its cost from that night's re-load.

All in all, I don't think it is a bad thing to move to a smart card, but I have my doubts that it will cure the boarding delays.
Reply With Quote
     
     
  #1552  
Old Posted Apr 1, 2009, 8:37 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,651
Quote:
Originally Posted by waterloowarrior View Post
Why would articulated boarding be restricted to the front door? ...
Because there will only be a smart card reader at the front door and the person will have to pay for each trip if they have the 'Purse' option.

This does bring up the point that there will not be a real option for zones. Nor will OC Transpo get much trip data out of this implementation of a smart card system.
Reply With Quote
     
     
  #1553  
Old Posted Apr 1, 2009, 8:56 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Quote:
Originally Posted by Richard Eade View Post
Because there will only be a smart card reader at the front door and the person will have to pay for each trip if they have the 'Purse' option.

This does bring up the point that there will not be a real option for zones. Nor will OC Transpo get much trip data out of this implementation of a smart card system.
In systems I've been in there were card readers at the back door. Is this not planned for Ottawa?

Buses in the GTA will be using fare zones with Presto, it could be adopted here as well.
Reply With Quote
     
     
  #1554  
Old Posted Apr 1, 2009, 9:12 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,651
Quote:
Originally Posted by waterloowarrior View Post
In systems I've been in there were card readers at the back door. Is this not planned for Ottawa?

Buses in the GTA will be using fare zones with Presto, it could be adopted here as well.
Yes, the Presto allows for zones, but since we are only planning to have machines at the front door, it would not be practical forcing everyone on and off only by the front door.
Reply With Quote
     
     
  #1555  
Old Posted Apr 2, 2009, 1:00 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
OK, the latest transit score from Queen's Park

Toronto $9B Ottawa 0

All to be spent before 1 km of track is built in Ottawa
Reply With Quote
     
     
  #1556  
Old Posted Apr 2, 2009, 2:13 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Toronto projects:

New 31km Eglinton Rapid Transit to Toronto Airport $4.6B
New Finch Avenue LRT $1.2B
Scarborough Rapid Transit Extension $1.4B
York Viva BRT improvements $1.4B

Why can't Ottawa come up with projects like this, which will speed up service and attract new ridership?
Reply With Quote
     
     
  #1557  
Old Posted Apr 2, 2009, 2:32 AM
Cre47's Avatar
Cre47 Cre47 is offline
Awesome!
 
Join Date: Mar 2006
Location: Orleans, ON
Posts: 1,971
I will be more convinced of that when it will be announced by the province and the feds not from the mayor. But the province can certainly afford at least $1 billion for here if they can fund for $9-10 billion Toronto even if Ottawa only has 7 or 8 MPP seats at Queen's Park.
Quote:
Originally Posted by Derek Puddicombe

O'Brien expects provincial LRT funding on the way

By DEREK PUDDICOMBE, Sun Media

Provincial funding for the first phase of Ottawa's $5-billion light-rail transit plan could be arriving soon, the mayor says.

Larry O'Brien said he's encouraged by Ontario Premier Dalton McGunity's announcement earlier today that the province is contributing over $9 billion for public transit projects in Toronto.

"I think this is good news for Toronto and good news for Ottawa," O'Brien said shortly after McGuinty's announcement.

"They are showing they are going to come through with the funding for our transit plan."

O'Brien isn't worried that the premier, who lives in the nation's capital, has bypassed the city. O'Brien says he believes it's only a matter of time before McGuinty makes a funding announcement for the $1.8-billion first phase of Ottawa's new transit plan.


Click here to find out more!

"I am now happy he will cast his gaze onto his hometown," said O'Brien. "It's reassuring to know they are going to fund our transit plan."

The province has already committed $200 million to the city's new LRT plan and has yet to say if any new money is available. Ottawa recently made a formal request to the federal and provincial governments to chip in $600 million each to fund the first phase, which includes a downtown tunnel and LRT running from Blair Rd. to Tunney's Pasture.

Bay Coun. Alex Cullen, chairman of the city's transit committee, said the fact the province is investing in LRT in Ontario is good news for Ottawa.

"It's a tangible indication of their support for LRT," said Cullen. "Opening up their chequebook in Toronto is encouraging to us in that they will be opening up their chequebook here in Ottawa."
Reply With Quote
     
     
  #1558  
Old Posted Apr 2, 2009, 3:47 AM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
It all has to do with votes and politics. (Also, the federal government is technically responsible for Ottawa transit so they are who to ask first, which is a strange quirk)
Reply With Quote
     
     
  #1559  
Old Posted Apr 2, 2009, 11:18 AM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
Quote:
Originally Posted by eternallyme View Post
It all has to do with votes and politics. (Also, the federal government is technically responsible for Ottawa transit so they are who to ask first, which is a strange quirk)
Err, what?
Reply With Quote
     
     
  #1560  
Old Posted Apr 2, 2009, 1:20 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
If we are going to spend $5B or $6B, why haven't we more seriously considered a partially tunneled Eglinton-style rapid transit line for Carling and Montreal Road? Surely, if properly designed, service along those corridors can be substantially speeded up over current bus routes, it offers tremendous intensification opportunities, offers more walk on possibilities, and can be extended to both Kanata and Orleans as a surface route. The other plus is that it complements the Transitways, avoids Transitway disruption and we end up with a second east-west rapid transit route. We get the downtown tunnel, buses routes not effectively connected to the LRT line can easily continue downtown via the Transitway, and it will ease Albert/Slater transit congestion if we provide a suitable suburban terminus ideally at the Town Centres. I see this as a way to connect more of the city by rapid transit and attract more transit riders, something Transitway conversion does not accomplish. Another good thing, no temporary bus re-routing measures, no temporary bridges, no megatransfer stations, and no suburban Transitways that have to be converted if LRT is to ever reach the suburbs with all the problems that later conversion presents down the road.

Why is this city so committed to building rapid transit as a staged project, ie bus Transitways first then later conversion to LRT? What other city does this? Would it not be cheaper in the long run to simply plan to build LRT directly?

We should decide, whether each potential corridor is best as LRT or is best for a Transitway and build it with the idea that this is going to be the future for the next 50 or 100 years. There is no better place to build rail transit (Carling-Montreal) which is already congested and where bus improvements will provide little benefit.

How can we possibly lose, building the downtown tunnel while continuing to allow buses from the Transitways along Albert and Slater? This automatically doubles our downtown transit capacity.

It is time to take transit planning back from the Albert/Slater coalition. Spending this kind of money has to produce more dividends for the public than the current proposal.

Last edited by lrt's friend; Apr 2, 2009 at 1:35 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.