Quote:
Originally Posted by Franky
"Sick of BRT", where did you come up with that?
|
Oh, I don't know, reading the paper, listening to people.
Quote:
|
Ridership is pretty high compared to similarly sized placed.
|
Ridership in Ottawa was always high; it was high before the Transitway existed even in concept. It sunk to its lowest point in 1996, the year the basic Transitway network was finished. The Transitway simply has not had a positive effect on ridership - at best it slowed down a decline. Transit trips per capita are lower now then they were in the 70s, whereas in Calgary they are higher.
Quote:
|
If it truly was about BRT, we would just have a bus tunnel and things would be fine.
|
Nope. There'd be underground queues of buses instead of above ground queues. Why is it you think that a bus tunnel will change the fundamental problem of too many buses and routes? Are you one of those deluded individuals who thinks the problem downtown is the traffic lights? Well I've got news for you:
IT'S NOT THE TRAFFIC LIGHTS CAUSING THE BUS QUEUES DOWNTOWN!
Calgary's 7th Avenue surface LRT now has a greater passenger throughput than do Albert and Slater in Ottawa, with only 75 m trains. Oh, and they've got more cross-streets to worry about. Not only that they've got shorter block lengths than we do. They even operate the trains outside the signalling system running as part of the regular traffic lights instead. On all the physical aspects we're better off or no worse, yet they still manage better than us. How is that possible? What is the fundamental difference between Calgary and Ottawa that could possibly explain how they come out on top despite having been dealt a worse hand physically in the street grid? Well they had the wisdom not to "invest" in BRT but rather to invest in LRT. What's more, they can still lengthen their stations (which they are, albeit slowly) for 100 m trains to get 33% more capacity. There's nothing we can do to increase the capacity of the BRT system downtown by 33%, tunnel or not.
If you want to know why, look at this recent footage from Hurdman Station, looking east:
• Video Link
At about 2:00 a queue has built-up on the East Transitway, just like downtown. The intersection isn't helping but the actual problem is that the station is over capacity. Buses are queueing waiting not for the intersection to clear but for the station itself to clear (one can see the end of one bus to the right). Then at ~2:30 one can hear a bus reversing! What's striking here is that some buses that haven't yet started their runs (i.e. expresses) are passing other buses that are in service, stopped at the station. But downtown in your bus sewer that won't be happening because every bus has to stop and take its turn at every station, which there'd be fewer of. Then it occurs again at ~3:40 - a bus waits not because of the intersection (which is bad enough) but because the station is occupied. This is exactly what will happen in a bus tunnel/sewer for most of the peak period.
All those stopped buses will and do have a cost: we need more buses - and drivers - to cover the same ground in the same time, so up goes the operating cost (fuel, wages, spare parts) and the rolling stock capital cost of our transit system along with its emissions. With drivers stuck in their buses idling, they are more likely to go into overtime and costs escalate still more (didn't OC Transpo just finish trying to force their drivers to swallow a longer workday spread in the recent strike? A workday spread of 13.5 h compared to the current 12 h, which is also the nation-wide norm. Hmm, coincidence?). We are and will continue to hemorrhage money because of BRT. We've pushed it well past its practical capacity and had we not been ruled by BRT fanatics we would have started looking at conversion in the 2003 TMP.
Quote:
|
The tunnel design would have been done properly (more economically) and the sticker price would be Billions less than LRT. If people had been given "real" numbers when the "choice" between LRT and BRT was given, they would have chosen BRT. The true sticker price of LRT is starting be known and BRT looks better and better.
|
They couldn't get away with a bus tunnel. They are still constrained by political realities, but they push as much BRT as they can get away with.
As for "true sticker price of LRT", give me a break. It's being inflated here, there and everywhere. The runaway cost of Baseline Station is due to BRT considerations (grade separation, tunnelization), not LRT - but LRT will get the blame because it's allegedly being built for LRT. How much of the population will know of the design that Richard has posted and come to the realization that maintaining a parallel BRT is pushing up the costs?