VANOC Street Plan

Quote:
Information on VANOC's transportation plan for Vancouver will be released Wednesday morning at 10 a.m. VANOC has been considering dedicated Olympic lanes as well as other temporary street closures in an effort to balance what's expected to be a very busy traffic period in the Lower Mainland.
- from the Vancouver 24hrs
__________________
"Think simple…reduce the whole
of its parts into the simplest terms,
Getting back to first principles"


~ FRANK LLOYD WRIGHT
     
     
  #2  
Old Posted Mar 11, 2009, 5:17 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Nine major downtown routes to close for Olympics


By Kelly Sinoski, Vancouver Sun
March 11, 2009 9:57 AM

VANCOUVER - Vancouver will face one of its most ambitious tests during the 2010 Olympic Games as it attempts to move Super-Bowl-sized crowds around already-congested city streets and into the mountains in the dead of winter over 17 days.

To deal with the crush, Vanoc partners revealed this week they plan to close nine major routes in and out of the downtown core, convert 32 city blocks into pedestrian-only corridors, develop 170 Olympic bus lanes and increase the fleet of buses and SkyTrain to get more people using transit.

Cited as probably the largest single event ever held in Vancouver, the Winter Olympics will host up to 135,000 spectators a day in Vancouver, 58,000 in Whistler and 60,000 per day at Vancouver celebration sites.

With 10,000 accredited media, 5,500 athletes and a 55,000-member workforce, the daily number of people roaming the downtown core for Olympic entertainment on any given night would be equivalent to the crush after a summer fireworks night coupled with a Madonna concert, TransLink spokesman Ken Hardie said.

The Olympics is considered a major challenge for both Vancouver and Whistler, which are restricted in size and are losing road capacity in their main centres because of geography; Vancouver is bound by bridges and water and Whistler by mountains.

Compared with Salt Lake City, which had five Olympic venues within a nine-kilometres radius of its downtown, Vancouver will have 10 venues within the same radius. Four of those are within one kilometre of the downtown.

While downtown residents will be encouraged to walk or cycle to the venues, and athletes, spectators and Olympic officials will have access to a Vanoc transit system running along priority Olympic bus lanes, others coming into the city won’t be able to leave unless they hitch a lift in a taxi or hop on a TransLink bus or SkyTrain.

This is because major routes in and out of the downtown core — including the Expo and Pacific boulevards, Georgia and Dunsmuir Viaducts and Renfrew Street between Hastings Street and McGill — will be fully or partially closed during the Games to limit the number cars on the road.

Extended parking restrictions, some of them in effect for 24 hours, will be in place along 650 city blocks. Another 32 blocks — along streets such Robson, Granville and Hamilton — will be converted into pedestrian-only corridors from noon to midnight every day.

In Whistler, people won’t be allowed to drive into the village subdivisions without a permit as parking will be restricted to residents. A northbound checkpoint will also be established to discourage “unnecessary trips during peak periods.”

A new Olympic Express route will be added along Highway 99 with community bus service on five neighbourhood routes.

The aim, according to the Olympic transportation plan unveiled today is to reduce gridlock in the downtown core and in Whistler village during the two-week Games by reducing traffic by 30 per cent and boosting transit ridership by 33 per cent. This would see the number of transit users jump from 730,000 today to 960,000 by February 2010.

The cost of a return trip — offered by Vanoc — to Whistler for an Olympic spectator on the Olympic Bus Network is $25; a return trip to Cypress is $12. Departure points, such as Capilano and Simon Fraser universities and park and rides, will be set up around the region.

A two-zone transit pass — about $200 — will allow spectators total access to TransLink transit as part of their Games ticket. Regular transit buses will also have access to the Olympic lanes, which will be open 24 hours and run along routes such as Burrard and Granville and the approaches to the Lions Gate and Ironworkers Memorial bridges.

The surcharge on the ticket will cover administration costs, with $17.3 million going to TransLink.

The Olympic transportation plan is expected to kick into gear two weeks before the Games to ensure Metro Vancouver residents are prepared to take transit, walk or cycle around the city and into the mountains.

To keep people moving freely, Vanoc expects to have more than 950 buses and minibuses on the road to move athletes and other Olympic officials.

By then, TransLink will also have added another 200 buses, the Canada Line and 48 new SkyTrain cars, a third SeaBus, as well as another 180 buses on standby, for any added commuter crunches.

The West Coast Express will also add 80-per-cent capacity — or up to 2,000 people per day — with extra trips during the week and weekends, while temporary cycling routes will be added in the downtown core.

A free streetcar connecting Granville Island and the Canada Line will also be offered in January and February.

The closure of Metro Vancouver universities is expected to free up space on the transit system. Taxi capacity will be also be increased during the Games.

A Know Before You Go campaign will urge residents and commuters to plan ahead to get to events because of potential waits for transit, walks to the venues from transit dropoff points and the time it will take to clear security.

A trip from Surrey to Vancouver usually takes 40 minutes on SkyTrain, for instance, but travellers should probably give themselves an hour and a half to ensure they clear security and get to their seat on time.

The City of Vancouver is also preparing for potential problems in case of heavy snowfall.

The city plans to borrow or buy snow removal equipment to ensure the main roads will be clear in the wake of a heavy dump.

The Ministry of Transportation will also boost its snow removal equipment and plans to upgrade the Duffy Lake Road as a back way into Whistler in case of emergencies. An emergency ferry from Horseshoe Bay or Porteau Cove to Squamish is also in the works.


[email protected]


Quote:
TransLink expecting nearly a million passengers a day during 2010 Games


By Kelly Sinoski, Vancouver Sun
March 11, 2009 10:06 AM

VANCOUVER - TransLink’s transit system will face the ultimate challenge during the 2010 Olympic Games when its daily ridership is expected to swell by 33 per cent to close to a million people.

But even though TransLink is confident it can meet the demands of the extra passenger load by adding capacity to its fleet of buses, SkyTrains and Seabus, it is calling for patience by residents and visitors, saying they will likely face long line-ups and delays to access transit during the two-week Games.

TransLink spokesman Ken Hardie warned travellers to allow extra travel time no matter what route, whether it’s along rapid transit or a key bus line — or time — they plan to travel.

With events on all day downtown, a commuter crush could occur at any time, while people going to Thunderbird Stadium, Hastings Park or the Olympic Oval should consider the time it takes to walk to transit.

At any given time, Hardie said, there could upwards of 100,000 people in the downtown core.

“All things considered it would like having the fireworks and a Madonna concert in one night,” Hardie said. “We’ll be telling people to expect crowding; it will take awhile to get on a train or bus because there are so many people wanting to get on at the same time.”

Under the Olympics transportation plan, TransLink will provide public transit services throughout Metro Vancouver during the Games, while Vanoc will offer the connections to Whistler and Cypress for the main Olympic events.

Under the deal, TransLink would receive about $17.3 million from the sales of Olympic Games tickets, which roll in the cost of transit with a Games pass. A two-zone souvenir pass for the two months will cost about $200, about the same as a regular transit pass, and will allow unlimited access to TransLink services.

Hardie said the money from Vanoc would cover overtime for bus drivers and other incremental costs and TransLink hopes to recover the rest of its Olympic costs through increased ridership.

TransLink is counting on another 230,000 people per day — besides ticket holders — to use transit during the Games, which would bring in $1.3 million in revenue and allow the transportation authority to break even, Hardie said.

The passenger estimate is based on population at the venues, the expected crowds going in and out and the conversion of people from other modes of transit — such as vehicles — to buses and SkyTrain.

“If it doesn’t occur, some of that [money] would be at risk,” Hardie said, but added: “We don’t want the Olympics to be a net cost to us.”

TransLink doesn’t consider its new Canada Line or the expansion of its bus and SkyTrain fleet as Olympic-related costs because they’re included in TransLink’s transportation plan and provide a legacy for the future.

He’s also optimistic people will use transit during the Games, mainly because most major roads leading into the downtown core will be fully or partially closed and rush hour parking restrictions will be in effect for most of the area to allow priority Olympic bus lines.

Starting this fall, TransLink will also ramp up a campaign to get people to get out of their cars and take transit. Three hundred people have already registered with TransLink to get information on specific venues and options to get there and a paid media campaign will urge businesses to shift working hours, encourage people to work from home, rideshare or take transit.

Hardie said he didn’t know the cost of the ad campaign, which will also urge passengers to buy a two-month souvenir pass and buy into the Know Before You Go message, which encourages travellers to factor in the time it’s going to take them to reach their destinations.

He added it’s important that people factor in the time it will take for security searches at the venues, which could add an hour or two to their travel time.

“Whatever trip you’re making it’s going to take longer than normal. As we get more information on the logistics, we’re going to do some of these calculations [on travel times],” Hardie said. “If you’re going to an event, allow this much travel time from your front door to your seat.”

Hardie said the majority of people participating in the Games live close to frequent transit corridors and TransLink will be running extra buses along the priority Olympic routes all day as well as more frequent SkyTrain services to ferry people to and from downtown, BC Place and Canada Hockey Place.

SkyTrain, which now runs about every two to 2.5 minutes on the Expo line and three to five minutes on the Millennium line, will be able to provide service at just under two minute intervals. It will also be extended for another extra hour to 2:15 a.m.

“Because of the flexibility of the system, let’s say we have a big hockey game and ceremonies and BC Place. We can reconfigure all the trains they can whisk a lot of people away very quickly,” Hardie said.

“One thing we have to accommodate is sudden change ... we have to basically turn on a dime to make sure the transit capacity is there.”

TransLink is also in negotiations with Surrey shopping centres to about using their parking lots for overflow SkyTrain parking, and the New Westminster parkade, which provided space to commuters during the closure of the Pattullo Bridge earlier this year.

The West Coast Express will also offer six additional trips on weekdays, nine new trips on Saturdays and seven new trips on Sunday, while a third SeaBus will be added. Hardie said another 180 buses will also be on standby for use on overloaded routes.

He expects there shouldn’t be a problem providing drivers, as Coast Mountain is recruiting 500 new bus drivers and is looking into luring back some of those drivers who recently retired to work during the Games. It has also put a holiday blackout in place during the Games to ensure drivers are available.

The HandyDart fleet will also be expanded by 30 vehicles and will be available to visitors.

“It’s going to be a challenge; public transit has been critical in every Games,” Hardie said, adding that bus drivers went on strike in Torino. “It should give people some comfort that we’re one of the largest cities to ever host a winter Games. During the Games we would probably be moving passengers similar to Toronto’s transit system.”

[email protected]
© Copyright (c) The Vancouver Sun
http://www.vancouversun.com/
     
     
  #3  
Old Posted Mar 11, 2009, 5:39 PM
WBC WBC is offline
Transit User
 
Join Date: Aug 2007
Location: Metrotown/Downtown
Posts: 808
ehm....and what about people who actually have to work downtown?

I guess I will be working from home for 2 weeks...or spending time on a beach in Dominican Republic while the circus is in town.
     
     
  #4  
Old Posted Mar 11, 2009, 5:45 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,762
"The cost of a return trip — offered by Vanoc — to Whistler for an Olympic spectator on the Olympic Bus Network is $25; a return trip to Cypress is $12. Departure points, such as Capilano and Simon Fraser universities and park and rides, will be set up around the region."

that's actually a pretty fair price. i thought it would be more expensive.

i really hope it does not snow. no matter what plans are in place, this city's traffic is a mess even on the lightest of snow days
     
     
  #5  
Old Posted Mar 11, 2009, 5:50 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ lol....like Monday. A friend of mine said it took 2.5 hours to get from Oak and 49th to UBC.
     
     
  #6  
Old Posted Mar 11, 2009, 6:05 PM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
Registered User
 
Join Date: Jan 2004
Location: White Rock, BC (Metro Vancouver)
Posts: 3,145
Quote:
Another 32 blocks — along streets such Robson, Granville and Hamilton — will be converted into pedestrian-only corridors from noon to midnight every day.
Looks like Robson and Granville will be party central for all visitors/Metro Vancouverites during 2010. Robson and Granville makes sense though for the festivities.


Quote:
An emergency ferry from Horseshoe Bay or Porteau Cove to Squamish is also in the works.
The just in case scenario. Just in case another rockfall should occur on this notorious section of highway akin to the Porteau Bluffs closure last year.
     
     
  #7  
Old Posted Mar 11, 2009, 7:21 PM
wrenegade's Avatar
wrenegade wrenegade is offline
ON3P Skis
 
Join Date: Sep 2008
Location: Lower Lonsdale, North Vancouver, BC
Posts: 2,594
The emergency ferry should be set up from Horseshoe Bay to Squamish. Probably the most at risk portion of the highway is the section that slid last summer, immediately north of Porteau Cove, rendering that terminal useless. The Darryl Bay terminal in Squamish should be (and should have been) upgraded to handle a Queen of Capilano-size (Bowen or Southern Gulf Islands) ferry.

Besides that, the transportation plan looks decent. As best as they can do I suppose. The viaducts, expo & pacific blvds, and renfrew street closures are to be expected for security reasons, so that isn't a big deal, and the pedestrian malls of robson, granville, hamilton, mainland aren't a big loss anyway. Anyone remember the night when the Canucks beat the Stars in April of 07'? Robson pretty much became a pedestrian mall whether the police liked it or not.

The transit pass for $200 for two months seems fair, provided that regular residents can still purhcase regular 1-zone passes if they want to. Or just a single month 2-zone pass as per usual. The express buses to Whistler and Cypress are decently priced, especially the Whistler bus. I hope there is a West Van pickup/dropoff location at Park Royal like there was for the World Cup as well though. Driving from the base of Cypress (where I live) all the way to North Van to catch a bus right back to bascially the same place would be a pain in the ass. Or even a pickup/dropoff/taxi/busloop at Mulgrace School would be good. But probably too small.

Question. Is Highway 99 still going to be open to residents/regular traffic during off-peak times?
     
     
  #8  
Old Posted Mar 12, 2009, 12:29 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 39,880
will the cross streets be closed down too? or will those intersections be car passable?
__________________
belowitall
     
     
  #9  
Old Posted Mar 12, 2009, 1:49 AM
zivan56 zivan56 is offline
Registered User
 
Join Date: Oct 2005
Location: Vancouver
Posts: 1,207
No...cars will be allowed to cross and there will be police at each of these intersections to make sure pedestrians follow the rules when crossing (was on CTV today).
     
     
  #10  
Old Posted Mar 12, 2009, 2:23 AM
arashi_1987 arashi_1987 is offline
Registered User
 
Join Date: Sep 2008
Posts: 71
The article says to expect delays on transit due to security checkpoints? This can't mean that passengers have be checked before they get on?!
     
     
  #11  
Old Posted Mar 12, 2009, 2:44 AM
zivan56 zivan56 is offline
Registered User
 
Join Date: Oct 2005
Location: Vancouver
Posts: 1,207
They mean when going to "events," so the time it takes you to get there + clear security at the events.
     
     
  #12  
Old Posted Mar 12, 2009, 3:49 AM
twoNeurons twoNeurons is offline
loafing in lotusland
 
Join Date: Aug 2002
Location: Lotusland
Posts: 6,100
Anyone seen a map of the closures?
     
     
  #13  
Old Posted Mar 12, 2009, 4:00 AM
djun djun is offline
Registered User
 
Join Date: Feb 2009
Posts: 78
     
     
  #14  
Old Posted Mar 12, 2009, 4:18 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
We'll be fine....we'll cope with it.
     
     
  #15  
Old Posted Mar 12, 2009, 4:58 AM
raggedy13's Avatar
raggedy13 raggedy13 is offline
Dérive-r
 
Join Date: Mar 2006
Location: Vancouver, BC
Posts: 4,450
This will certainly be interesting. I'm looking forward to Granville and Robson as pedestrian malls. It's going to be great wandering around downtown since I'm hoping to be living within walking distance of it by next February. All the crowds and the whole event in general should make for some interesting photo opportunities as well.
     
     
  #16  
Old Posted Mar 12, 2009, 4:22 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805








     
     
  #17  
Old Posted Mar 12, 2009, 5:05 PM
Mininari Mininari is offline
Registered User
 
Join Date: Jul 2004
Location: Victoria (formerly Port Moody, then Winnipeg)
Posts: 2,445
I for one, think that the Olympic road closures represent an INCREDIBLE opportunity as a 'transportation experiment." This plan makes SOV commuting into downtown EXTREMELY unattractive for one month.

I hope that there are some transportation studies conducted on this as a case study of how transit-oriented, non-sov commuting works in the Vancouver area. It would have to account for telecommuting obviously.
     
     
  #18  
Old Posted Mar 12, 2009, 6:06 PM
wrenegade's Avatar
wrenegade wrenegade is offline
ON3P Skis
 
Join Date: Sep 2008
Location: Lower Lonsdale, North Vancouver, BC
Posts: 2,594
I am surprised the Robson pedestrian mall extends west (Jervis?) as far as it does, and I'm surprised the Granville pedestrian mall doesn't extend south past Helmcken. The plan looks good though, I especially like the signal optimization on Taylor Way in West Van.

I am surprised to learn of the extra northbound lane in Whistler from Function Junction to Lorimer Road. For one, I have no idea how they are going to do this. The road is only two lanes for 90% of that distance and the shoulders are tiny. They haven't started ANY construction whatsoever to build out room for an additional lane either. Secondly, if they are building out a temporary lane, why is it only temporary??? It would be awesome for them to have another lane, especially considering the Hwy 99 improvement project ends at Function Junction and the upgraded road will narrow to the existing road through Whistler. Function Junction will become a bottleneck. I was surprised the road wasn't widened to Lorimer road in the first place!
     
     
  #19  
Old Posted Mar 12, 2009, 6:42 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,337
Looking at the map, I can't help wondering why the "Live" sites aren't located at say, The Plaza of Nations and Harbour Green Park (or the plaza of the VCCEP). That would have consolidated road closures.

Could be that the Live sites will have lower security levels than the venue sites and that the two would not mix well with each other.

     
     
  #20  
Old Posted Mar 12, 2009, 11:06 PM
Login650 Login650 is offline
Registered User
 
Join Date: Oct 2008
Posts: 57
Quote:
Originally Posted by Mininari View Post
I for one, think that the Olympic road closures represent an INCREDIBLE opportunity as a 'transportation experiment." This plan makes SOV commuting into downtown EXTREMELY unattractive for one month.

I hope that there are some transportation studies conducted on this as a case study of how transit-oriented, non-sov commuting works in the Vancouver area. It would have to account for telecommuting obviously.
I agree. I live downtown and can't wait! It's going to be a once-in-a-lifetime thing.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > 2010 Olympic Winter Games [Archive]
Forum Jump



Forum Jump


All times are GMT. The time now is 10:56 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.