  #2641  
Old Posted Mar 5, 2009, 9:51 PM
Joeplayer19's Avatar
Joeplayer19 Joeplayer19 is offline
Registered User
 
Join Date: Sep 2008
Posts: 46
Quote:
Originally Posted by dkealoha View Post
Like in Tokyo? I googled and found this pic. Not sure who it's from...
http://www.youtube.com/watch?v=b0A9-oUoMug here is a video
Reply With Quote
     
     
  #2642  
Old Posted Mar 5, 2009, 11:44 PM
PacificNW PacificNW is offline
Registered User
 
Join Date: Jul 2001
Location: Arizona
Posts: 3,116
That guy is a jerk...they should have yanked his — onto the platform.
Reply With Quote
     
     
  #2643  
Old Posted Mar 6, 2009, 12:58 AM
MOPIdaho's Avatar
MOPIdaho MOPIdaho is offline
Registered User
 
Join Date: Mar 2006
Location: portland oregon
Posts: 211
I was looking at the new shelter on the bus mall and love the look, but I worry that the flat glass roof under trees will end up being a fancy glass compost bin in the fall.
Reply With Quote
     
     
  #2644  
Old Posted Mar 6, 2009, 1:40 AM
MarkDaMan's Avatar
MarkDaMan MarkDaMan is offline
Moderator
 
Join Date: May 2005
Location: Portland
Posts: 7,587
Quote:
Originally Posted by Okstate
Let me get this straight. I want to point out that I'm not arguing this either. The MAC club put pressure on Trimet to add a stop near "them" when they in fact don't want association with public transit?
the irony is rich...

The MAC did/does want the stop. The people that have to be sponsored by some dozens of current members to be put on a 4-year waiting list, and pay several thousand per person in 'entrance' fees when selected, don't ride the MAX to the MAC.
Reply With Quote
     
     
  #2645  
Old Posted Mar 6, 2009, 2:00 AM
PacificNW PacificNW is offline
Registered User
 
Join Date: Jul 2001
Location: Arizona
Posts: 3,116
I wonder how many people (who may ride the MAX) work @ the MAC and the surrounding business community....along with the people who live up the hill/area above the club?
Reply With Quote
     
     
  #2646  
Old Posted Mar 6, 2009, 3:07 AM
RED_PDXer RED_PDXer is offline
Registered User
 
Join Date: Dec 2007
Location: Portland, OR
Posts: 823
Quote:
Originally Posted by Okstate View Post
In response to "taking out" stops be it lightrail/streetcar to improve timing:

-Has this been done on other systems throughout the US?
-I can't imagine a stop being nixed simply b/c every stop is so vital...I mean there had to be a reason it was put there in the 1st place, right? I know planners are ultimately just regular joes but are the pros/cons really justified?

What I AM in favor of (if/when possible) is:
1) priority lanes coupled with 2) increased frequencies.
Wouldn't it be smarter to look at those options first before taking out stops?
I don't know of an example, but I don't think we need precedent. The stops were put in in 1986 when the line first opened downtown. it was the end of the line, so it didn't matter how close they were since people weren't using the MAX to travel through downtown. Today, they slow down thousands of people each day (about a minute of time for each stop).

The MAX already has priority lanes. It has signal priority and exclusive transit lane usage. I'm not sure what else you could be referring to. Every time the MAX stops, it has to wait for the traffic signals to cycle through - which is 60 seconds in downtown during the PM peak hour. By removing enough stops, enough time would be saved to perhaps have one extra run in the peak hour - not to mention all the time saved for people either traveling through downtown or to the opposite end of downtown.
Reply With Quote
     
     
  #2647  
Old Posted Mar 6, 2009, 3:15 AM
RED_PDXer RED_PDXer is offline
Registered User
 
Join Date: Dec 2007
Location: Portland, OR
Posts: 823
[QUOTE=zilfondel;4123707 Green line opens in September. Milwaukie 2015. 6 years - we're getting slow! We need that Barbur MAX asap, too - like 10 years ago.[/QUOTE]

We're getting 50-60% of these projects funded by the feds. We should be happy we're getting any at all. Until we develop a local funding source for transit capital projects, we'll continue to develop at this pace - which is quite fast compared to the rest of the country - except maybe Denver and Houston which use sales tax primarily (I think..).

I think it's about time we develop a decent BRT line with similar MAX qualities - prepaid fares, frequent service, signal priority and transit-exclusive lanes where needed, higher capacity articulated buses, more spacing between stations/stops, level boarding platforms, message arrival displays, nice shelters, etc.. We could have at least 10 full transit lines completed in this fashion over the next ten years for the price of one more LRT line, perhaps more than 10..
Reply With Quote
     
     
  #2648  
Old Posted Mar 6, 2009, 5:41 AM
MarkDaMan's Avatar
MarkDaMan MarkDaMan is offline
Moderator
 
Join Date: May 2005
Location: Portland
Posts: 7,587
I have the same concerns as you PacNW, but workers and neighbors are pretty well served even with their stop within four additional blocks, which the distance would be at most without the Kings Hill stop. I walk a little less than a mile to my closest MAX station and would personally enjoy a 2 to 5 minutes (everyone has been at a 5 minute stop on the MAX) reduction per stop less commute time.
Reply With Quote
     
     
  #2649  
Old Posted Mar 6, 2009, 9:39 AM
zilfondel zilfondel is offline
Submarine de Nucléar
 
Join Date: Mar 2006
Location: Missouri
Posts: 4,481
Quote:
Originally Posted by RED_PDXer View Post
I think it's about time we develop a decent BRT line with similar MAX qualities - prepaid fares, frequent service, signal priority and transit-exclusive lanes where needed, higher capacity articulated buses, more spacing between stations/stops, level boarding platforms, message arrival displays, nice shelters, etc.. We could have at least 10 full transit lines completed in this fashion over the next ten years for the price of one more LRT line, perhaps more than 10..

I kind of agree with you. I'm thinking Powell #9, Barbur #12, Sandy #12, Burnside #20, Broadway #9, Hawthorne #14 (if it doesn't go streetcar), and... I'm not sure. Likely #72 on 82nd, 70 on 39th, or even the #8 to NE. For starters.

You know, I just realized, you can't find any bus ridership numbers on Trimet's website. Whats up with that? Are they hiding it or something?


Oooh, I forgot: Eugene just built an honest-to-god BRT line. Not 100% separate "track," but part of it is. Frequency every 10 minutes - beats ours! And apparently its also free.

It appears roomy:


Rick Price on flickr

Dedicated stations w/light-rail like amenities:


rob wrenn on flickr

Plus articulated buses with several doors, as well as boarding ramps (not shown):


rob wrenn on flickr


It also appears that their shiny new BRT line increased patronage 46% higher than the busline it replaced. Not bad, not bad.

Last edited by zilfondel; Mar 6, 2009 at 9:59 AM.
Reply With Quote
     
     
  #2650  
Old Posted Mar 7, 2009, 3:13 AM
MR. Cosmopolitan's Avatar
MR. Cosmopolitan MR. Cosmopolitan is offline
Registered User
 
Join Date: Jan 2009
Location: Portland, OR
Posts: 144
We're talking a lot about streetcar and light rail, what about buses?
Portland still has no articulated buses; I think that we should also give a lot of importance to this relatively cheap and flexible mode of transport. Increase the frequency, that would very likely increase the amount of passengers; making well planed micro-bus lines for the suburbs that connect with the major lines; more rapid bus lines... etc.
Reply With Quote
     
     
  #2651  
Old Posted Mar 7, 2009, 4:34 AM
PacificNW PacificNW is offline
Registered User
 
Join Date: Jul 2001
Location: Arizona
Posts: 3,116
A few articulated buses were tried years ago in Portland but I don't remember why they were discontinued.
Reply With Quote
     
     
  #2652  
Old Posted Mar 7, 2009, 5:05 AM
RED_PDXer RED_PDXer is offline
Registered User
 
Join Date: Dec 2007
Location: Portland, OR
Posts: 823
The articulated buses TriMet purchased had excessive maintenance needs.. they kept going out of service because of mechanical problems.. probably just bought the wrong type.. though the buses TriMet does have must be pretty good, because their miles driven between breakdowns is higher than most transit systems in the country..Comparatively, I remember the LA metro buses breaking down all the time, but have never experienced it once here..
Reply With Quote
     
     
  #2653  
Old Posted Mar 7, 2009, 5:22 AM
JordanL JordanL is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,004
Quote:
Originally Posted by MR. Cosmopolitan View Post
We're talking a lot about streetcar and light rail, what about buses?
Portland still has no articulated buses; I think that we should also give a lot of importance to this relatively cheap and flexible mode of transport. Increase the frequency, that would very likely increase the amount of passengers; making well planed micro-bus lines for the suburbs that connect with the major lines; more rapid bus lines... etc.
Long bus lines that travel from the suburbs in are great IMO. I hate having to transfer busses because it takes FOREVER to get anywhere...

I think there's some really tight fits in Portland, which make articulated busses difficult... the 19 for instance wouldn't be able to use them. It makes some very tight turns on NE 28th, E Burnside and NE 16th.
Reply With Quote
     
     
  #2654  
Old Posted Mar 7, 2009, 5:59 AM
MR. Cosmopolitan's Avatar
MR. Cosmopolitan MR. Cosmopolitan is offline
Registered User
 
Join Date: Jan 2009
Location: Portland, OR
Posts: 144
Quote:
Originally Posted by JordanL View Post
Long bus lines that travel from the suburbs in are great IMO. I hate having to transfer busses because it takes FOREVER to get anywhere...

I think there's some really tight fits in Portland, which make articulated busses difficult... the 19 for instance wouldn't be able to use them. It makes some very tight turns on NE 28th, E Burnside and NE 16th.
There are lots of European cities with much tighter fits, much narrower streets and with a nearly complete lack of straight streets that do have articulated buses, even some have double articulated buses. If you train well the bus drivers, Portland is a piece of cake for articulated buses.
Reply With Quote
     
     
  #2655  
Old Posted Mar 7, 2009, 6:56 AM
JordanL JordanL is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,004
Quote:
Originally Posted by MR. Cosmopolitan View Post
There are lots of European cities with much tighter fits, much narrower streets and with a nearly complete lack of straight streets that do have articulated buses, even some have double articulated buses. If you train well the bus drivers, Portland is a piece of cake for articulated buses.
A lot of the difficult turns involve street parking... which I guess can be changed by removing the parking.
Reply With Quote
     
     
  #2656  
Old Posted Mar 7, 2009, 7:06 AM
bvpcvm bvpcvm is online now
Registered User
 
Join Date: Apr 2004
Location: Portland
Posts: 2,793
Quote:
Originally Posted by RED_PDXer View Post
The articulated buses TriMet purchased had excessive maintenance needs.. they kept going out of service because of mechanical problems.. probably just bought the wrong type.. though the buses TriMet does have must be pretty good, because their miles driven between breakdowns is higher than most transit systems in the country..Comparatively, I remember the LA metro buses breaking down all the time, but have never experienced it once here..
Part of the issue was also that they were Ikarus buses from Hungary, and after the wall came down the part suppliers went out of business, so all the spare parts had to be specially manufactured. That's the story I remember hearing, anyway.
Reply With Quote
     
     
  #2657  
Old Posted Mar 11, 2009, 4:23 AM
bvpcvm bvpcvm is online now
Registered User
 
Join Date: Apr 2004
Location: Portland
Posts: 2,793
http://www.djcoregon.com/articleDetail.h...llion-to-build-parkandrides-for-bicycles

TriMet dedicates $1 million to build park-and-rides for bicycles

POSTED: 12:22 PM PDT Monday, March 9, 2009
BY STEPHANIE BASALYGA

Taking a lesson from cycling-centric cities like Copenhagen and Amsterdam, TriMet will use $1 million from the state's federal stimulus package to build two bicycle park-and-ride facilities.
"They're like garages," TriMet's Mary Fetsch said about the structures, which will be built at the Sunset and Beaverton transit Centers. The agency plans on hiring private contractors to handle construction duties.
TriMet current provides lockers for bike riders, but there aren't enough to meet demand the two Westside transit centers, Fetsch said. So while the agency will use part of the $1 million to upgrade about 100 of those older lockers outside of Portlands' Central Business District, the bulk of the money will be used to construction the two park-and-ride facilities.
Each of the buildings will feature a secure entrance, inside security cameras and capacity for about 125 bikes. The Beaverton facility will be located near Lombard Street, "close to a substation," Fetsch said. The Sunset structure will be constructed inside an existing parking garage at that transit center.
TriMet has already issued a design for the Beaverton Transit Center facility, created by Steve Durrant of Alta Planning. But other components are still up for grabs, and TriMet currently is developing RFPs for the projects, according to Fetsch
"I think we're looking at design-build," she said. "By the time we get all of the (other) necessary steps, I bet it will be sometime in the summer that we'll start construction."
"The stimulus funding, you have to have 50 percent obligated within the first 180 days, so it's one a fast track."
Reply With Quote
     
     
  #2658  
Old Posted Mar 12, 2009, 4:07 AM
MarkDaMan's Avatar
MarkDaMan MarkDaMan is offline
Moderator
 
Join Date: May 2005
Location: Portland
Posts: 7,587
Quote:
which will be built at the Sunset and Beaverton transit Centers
oh come on! One on the west side, one of the east side.

I'm not saying dismantle to current team, but TriMet needs some fresh blood inserted into their hierarchy. I've been very disappointed with them the last few years.
Reply With Quote
     
     
  #2659  
Old Posted Mar 12, 2009, 4:23 AM
JordanL JordanL is offline
Registered User
 
Join Date: Jun 2008
Posts: 1,004
Quote:
Originally Posted by MarkDaMan View Post
oh come on! One on the west side, one of the east side.

I'm not saying dismantle to current team, but TriMet needs some fresh blood inserted into their hierarchy. I've been very disappointed with them the last few years.
They're just trying to match PCC...

-_-

I can't tell you how annoying it is that the mean PCC center is something like 6 miles west of the mean population center...
Reply With Quote
     
     
  #2660  
Old Posted Mar 12, 2009, 4:25 AM
pdxman's Avatar
pdxman pdxman is offline
Registered User
 
Join Date: Aug 2006
Location: Portland
Posts: 1,037
Quote:
Originally Posted by MarkDaMan View Post
oh come on! One on the west side, one of the east side.

I'm not saying dismantle to current team, but TriMet needs some fresh blood inserted into their hierarchy. I've been very disappointed with them the last few years.
I couldn't agree more mark! Trimet needs some new minds with different ideas. I'd LOVE to see some more attention paid to bus service-which could be a whole lot better imo.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Pacific West > Portland > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.