Quote:
Originally Posted by fever
I don't really like how the Canada line connection goes around behind the Expo line escalator. I wonder if it's possible for that to go through the main building at the concourse level, one level below the current main hall level (like with the retail at the back of the main building).
I also wonder if it's possible to replace the stairs between the main hall and concourse with a ramp.
|
The primary purpose is probably for transferring passengers - so the "behind" location is probably the most direct from the concourse generally (i.e. WCE passengers wouldn't have to "turn around" although SkyTrain passengers would). It also separates transferring passengers from those headed to the street instead of funnelling them through one area to the CP Station's main hall.
The thing I find odd is that right now, the passage from the CP main hall to the Seabus has no stairs - but the new concourse will require you to walk down a flight of stairs from the CP main hall to the concourse (presumably street level will be established lower at the back of the CP station than in front of it?) i.e. if the main pedestrain flow in through the CP hall, shouldn't it be one level and maybe the exits to the side streets could use the stairs?
EDIT: The councourse probably has to be lower so the transit street can run over top of the Seabus passageway.
Other items of note:
Note how the "future platform" is more SkyTrain length rather than WCE length...
Also the passenger ferries note "international" and "domestic" docks.