  #1141  
Old Posted Feb 26, 2009, 8:18 PM
DKaz DKaz is offline
 
Join Date: Nov 2008
Posts: 4,302
Until they decide whether or not to go with extended platforms or just go with 5-car MKII trains, I don't think they're going to make any decision to order 3-car sets yet. I suspect they'll just order enough trains for the Evergreen Line and observe ridership for a year or two. I'd have to place my bets on extending the platforms, we're going to be completely maxed out by 2020 with our current platforms.
     
     
  #1142  
Old Posted Feb 26, 2009, 8:47 PM
mezzanine's Avatar
mezzanine mezzanine is offline
 
Join Date: Aug 2002
Posts: 2,011
This is the second time i've asked this (i've searched the thread), but again, can we get other companies besides bombardier to work on evergreen (e.g other LIM manufacturers?) I didn't have an answer last time, I am wondering if there any contractual violations/proprietary infringement issues with that.
     
     
  #1143  
Old Posted Feb 26, 2009, 9:14 PM
Gordon Gordon is offline
 
Join Date: Jul 2008
Posts: 1,065
It looks as if Kawasaki Heavy Industries makes a Linear Induction Motor That are used in Subways so Bombardier does have some compeptition for these trains.

I think 5 car Marks 2 Trains would allow maximun use of the current platforms, the last Rapid Transit report that included the Evergreen Line mentions the use of a large number of 5 car trains.
     
     
  #1144  
Old Posted Feb 26, 2009, 9:16 PM
yogiderek yogiderek is offline
 
Join Date: May 2003
Posts: 497
so an expansion of the existing system. Seems logical to me. Though, I can hear the screaming from the light rail people already. Malcolm Johnston will be fuming as usual. LOL
     
     
  #1145  
Old Posted Feb 26, 2009, 9:38 PM
rather_draconian rather_draconian is offline
 
Join Date: Oct 2008
Posts: 192
For ONCE I feel like Harper and the conservatives are doing something right. Funding for rapid transit, and tougher crime laws! Yay!
     
     
  #1146  
Old Posted Feb 26, 2009, 9:44 PM
mr.x's Avatar
mr.x mr.x is offline
 
Join Date: Dec 2003
Posts: 12,805
I wonder where they'll get the remaining $173-million.....i'm assuming the private sector, it'll be interesting to see what type of P3 model they will come up with. Though I would assume that given the much smaller private sector contribution, they wouldn't be responsible for designing the line (thank god).
     
     
  #1147  
Old Posted Feb 26, 2009, 9:51 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
 
Join Date: May 2007
Posts: 24,744
Quote:
Originally Posted by DKaz View Post
I'd have to place my bets on extending the platforms, we're going to be completely maxed out by 2020 with our current platforms.
Please stop.

I'm sure you'd be back in 1983 telling us that the Expo line's platforms would be "maxed out" by 1997 too.
     
     
  #1148  
Old Posted Feb 26, 2009, 10:59 PM
mrjauk mrjauk is offline
 
Join Date: Oct 2008
Posts: 555
Hallelujah!

And the clouds parted to let the sunshine in on this glorious occasion. Now if we could just get the millenium line to be extended to Cambie by the time Evergreen begins to roll, it would do a lot to alleviate congestion at Broadway/Commercial.

Quick question: How much track would have to be built (and how much of this would be underground) in order for an extension between VCC and Broadway/Cambie? What would a reasonable cost/km be for this segment?
     
     
  #1149  
Old Posted Feb 26, 2009, 11:14 PM
wrenegade's Avatar
wrenegade wrenegade is offline
 
Join Date: Sep 2008
Posts: 2,594
I would have to imagine the extension from VCC to Cambie would be one of the most challenging and expensive portions of the UBC extension. The combined boring of the tunnel in order to get to the Main/Kingsway/10th/Broadway area, as well as station construction there and Cambie is going to be pricey and time consuming. That and the fact that the plans for the Great Northern Way campus haven't been finalized, so the line could be at-grade or beneath grade through that section. It would be so nice if they could get their act together and extend it to there with the opening of the Evergreen, but it's not going to happen.
     
     
  #1150  
Old Posted Feb 26, 2009, 11:18 PM
amor de cosmos amor de cosmos is offline
 
Join Date: Jun 2005
Posts: 6,750
Georgia Straight:
Quote:
February 26, 2009
Prime Minister Stephen Harper commits $350 million more to Evergreen Line
By Matthew Burrows

Prime Minister Stephen Harper and B.C. premier Gordon Campbell joined forces for a feel-good announcement in Burnaby today (February 26) to confirm they will pony up for the long-awaited rapid-transit line through Vancouver’s northeastern suburbs.

“We will build the Evergreen Line,” Harper told cheering party supporters and local politicians at the TransLink operations centre.

Earlier on in his speech, Harper said, “Consensus on one issue was very clear. We all want to put Canadians to work now building the bridges, roads, and other public transit facilities needed to generate long-term economic growth tomorrow.”

In his remarks, Campbell gave credit to Harper’s right-hand man in B.C.—Heritage Minister James Moore, the MP for Port Moody-Westwood-Port Coquitlam.

“Prime minister, I want to join with you in recognizing the work of James Moore, who has been a strident advocate for the Evergreen Line expansion,” Campbell said. “I don’t know if you noticed, because you were looking out to the audience, but when you announced that you were going to be full partners in the Evergreen Line, [B.C. transportation minister] Kevin Falcon almost hit the roof. So I just want to say thanks to Kevin and James for the work they have done.”

A joint federal-provincial press release issued today confirmed Harper’s government is committing $350 million in additional funding from the Building Canada Fund for the $1.4-billion rapid-transit line, which would connect Burnaby to Coquitlam and Port Moody.

The 2008 federal budget already pledged $66.7 million for the line, according to the release.

The provincial contribution is $410 million, and TransLink’s share is $400 million. The remaining $173 million is expected to come from the private sector or “transit-oriented land development”, the release states.

Harper also said, “From coast to coast to coast, we are working with provinces and territories to cut red tape and get projects up and running. Here in the Lower Mainland we’re moving forward on several ambitious infrastructure initiatives, and, as our gateway to India, China, and the rest of the Asia-Pacific, British Columbia has a unique role to play in building the Canada of the future. That’s it’s so imperative that we continue to build the infrastructure needed to speed the flow of people and goods through the Lower Mainland.”

In another press release issued today, B.C. NDP transportation critic Maurine Karagianis questioned whether TransLink, facing a yearly deficit of over $100 million, will be able to match the federal funds.

“Today’s announcement isn’t anything new on the Evergreen Line,” Karagianis said in the release. “We always knew the Federal government would have to step in and help. The real news people are waiting for is when Campbell will get his act together and finally deliver.”

Coquitlam MLA Diane Thorne claimed in the same release, “Today marks the fifth time the Campbell government has promised the Evergreen Line.

“The last thing we need is more announcements, photo ops, broken promises and delays; we need Campbell to stop stalling and finally start construction on a route he promised over five years ago,” Thorne said.
http://www.straight.com/article-203818/p...-commits-350-million-more-evergreen-line
     
     
  #1151  
Old Posted Feb 26, 2009, 11:20 PM
mrjauk mrjauk is offline
 
Join Date: Oct 2008
Posts: 555
I just Google-Mapped it and the distance is about 2.9 km, assuming the line goes to about the middle of the proposed Great Northern Way campus area, and then runs northwest to Main/Broadway/Kingsway.

I've gone back and seen that a reasonable cost estimate is about 100 million/km (I'm not so sure it's entirely reasonable as it is a nice even number), but that would mean about 300 million.
     
     
  #1152  
Old Posted Feb 27, 2009, 12:02 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,834
The main problem with doing it piecemeal is that if the tunnel is bored, the False Creek Flats would be the staging area/opening for the tunnel and spoil form the tunnel would be removed (by conveyor belt) at that end - which means that there is an advanatge to boring the whole tunnel in one uninterrupted progression (prevents the need for a second staging area).
Cut & cover wouldn't have that problem.
     
     
  #1153  
Old Posted Feb 27, 2009, 12:20 AM
Jared's Avatar
Jared Jared is offline
 
Join Date: Oct 2001
Posts: 4,051
Quote:
Originally Posted by mr.x2 View Post
I wonder where they'll get the remaining $173-million.....i'm assuming the private sector, it'll be interesting to see what type of P3 model they will come up with. Though I would assume that given the much smaller private sector contribution, they wouldn't be responsible for designing the line (thank god).
Of course they're going to be responsible for designing the line, who exactly do you think would be? . I'm curious as to who exactly do you think designed the Millenium Line, or the Convention Centre, or all the projects that you think "didn't cut corners"? The provincial government?

The MoT (possibly via the owner's engineer, CH2M Hill), will send out some conceptual drawings (engineering drawings i mean, though I'm sure they'll send out some laypeople renderings as well for the general public to provide feedback on). However, the contractor is ultimately responsible for the final design (this is why we got a mega-port mann, it was Kiewitts idea, not MoT's, hence why the original MoT rendering from a couple years back has the twin bridges), subject to meeting constraints and scope of work set out by the owner (the MoT).
     
     
  #1154  
Old Posted Feb 27, 2009, 1:44 AM
excel excel is offline
 
Join Date: Oct 2005
Posts: 3,484
good news.
     
     
  #1155  
Old Posted Feb 27, 2009, 2:10 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
 
Join Date: Oct 2001
Posts: 6,395
Quote:
Originally Posted by Stingray2004 View Post
8 years ago.... Ya mean February 26, 2001? The NDP was still in power.
haha NICE ... Ravman you really have no brain do you? how old are you? 14? 15?
     
     
  #1156  
Old Posted Feb 27, 2009, 2:16 AM
cornholio cornholio is offline
 
Join Date: Jun 2006
Posts: 3,916
Quote:
Originally Posted by ravman View Post
Gordo cancelled it... stalled the projects and now are pushing forward months before an election... this should have been bulit 8 YEARS ago.
For once I agree with you.

The only problem is that the NDP act exactly the same, history proves this point.
     
     
  #1157  
Old Posted Feb 27, 2009, 2:20 AM
giallo's Avatar
giallo giallo is offline
 
Join Date: Apr 2002
Posts: 12,764
Yeah, this is wonderful news.
Now that I think of it, Vancouver has pretty much been building skytrain lines non-stop since the late '90s.
     
     
  #1158  
Old Posted Feb 27, 2009, 2:25 AM
metroXpress's Avatar
metroXpress metroXpress is offline
 
Join Date: Jan 2009
Posts: 2,220
Excellent news that they relize the importance of this fast growing
region in Canada....Bravo! And what's next after 2014?
     
     
  #1159  
Old Posted Feb 27, 2009, 2:37 AM
amor de cosmos amor de cosmos is offline
 
Join Date: Jun 2005
Posts: 6,750
Quote:
Originally Posted by Allen View Post
Excellent news that they relize the importance of this fast growing
region in Canada....Bravo! And what's next after 2014?
another skytrain line
     
     
  #1160  
Old Posted Feb 27, 2009, 2:41 AM
GeeCee's Avatar
GeeCee GeeCee is offline
 
Join Date: Jan 2009
Posts: 2,816
Quote:
Originally Posted by amor de cosmos View Post
another skytrain line
to seattle!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
   
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:54 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.