Quote:
Originally Posted by lrt's friend
You know, I find this a little troubling. We have an aging population, yet the emphasis is commuter transit. This is a long-term project and our senior population is going to expand tremendously by the time it is completed. I have also noted the emphasis on commuter transit as well, but I suspect that transit demand beyond commuter service is going to increase, perhaps dramatically, in future years. Are we preparing for this?
|
Short answer "No."
The current plan is a reactive plan. There is a problem with the downtown capacity using the present bus setup, so it needs to be 'fixed'. The problem affects the west (including Barrhaven) and east traffic the most so that is where people want to see the changes. Putting new lines in to direct growth is not going to make things better for the majority of current riders, thus that is not what we are planning to do.
In one way, I can see this point. We did take the same approach that Calgary took and used our available funds to build commuter transit lines out to the suburbs. Calgary chose to do it in rail, we chose buses, but the goal was the same; to provide as many, far reaching transit Rights of Way as we could. The bottle-neck in the centre could be handled later. Now is that later. Calgary is building a downtown tunnel and Ottawa is building a downtown tunnel. In Ottawa's case, we are also converting our bus back-bone to rail. I don't think there is a clear case for the conversion, but that is not the point here: Council has made that decision.
So we are reacting to the success of the system, as Calgary is doing, and building a tunnel through the core to improve the ride for commuters. This is the priority chosen by Council.
And, back to your point, even with an aging population, there will continue to be a large volume of commuters heading for the downtown core every week-day. We need to handle those riders in an efficient manner. Currently we are just managing, but this will not last. We need to make improvements in the through put downtown.
I think once the pressure is off, and the success of a rail system can be justified, we will see new rail lines added to shape the development of the City. We will add more LRT routes along main streets and down to the south. I am not convinced that we will see rail extended to the suburbs. (Although I think we should. Penalizing the suburbs for being suburbs won't make them go away, and running full buses across the Greenbelt is crazy.)
This assumes, though, that we don't take so long to build the tunnel that we force businesses to create their own high density office centres out side of the core. If that happens, we might need to play 'catch-up' again and react to the need for rail lines to those centres.