Quote:
Originally Posted by 65MAX
Meanwhile, we're limited to 2-car trains, and a severely restricted capacity as a result. And some of you want to argue that a subway here is not needed?!? Seriously?!?
|
We have three lines operating on one track downtown now and it works. With transit mall tracks opening this year, downtown is not the critical capacity constraint. The capacity constraint is at RQ and it doesn't require a tunnel to fix. The constraint comes from MAX waiting for auto traffic signal cycles. If it was just MAX in that area, virtually no capacity issue in the foreseeable future. It would probably cost $30-40 million at most by grade separating auto traffic. It would cost 1/10th that if we just disallowed auto traffic from that area. Way cheaper..
So, yes, I'm serious that a tunnel isn't needed.
On a side note, 2-car trains is actually kinda nice because it forces TriMet to provide better frequencies. This evening, I boarded a Blue Line home right in the middle of rush hour and it was about 2 minutes behind yet another blue line. It never got crowded and there were even seats available. We're certainly not at capacity now.. Some trains are packed, but it's often due to headways (too long elapsed before the last train).
I should also point out that some of the "big boys" (like NY, Chicago and LA have some bus routes that carry more passengers in a day than the Blue Line and over a shorter route. 2-car trains that carry over 250 passengers per train is not the constraint either..