Quote:
Originally Posted by nname
Well.. sometimes doing trial and error doesn't mean any worse than plan. Thing does change and unexpected things occurs pretty often. I think there is not many things that goes according to the plan. I bet none of the plan would predicted the #143 would run at every 12min with articulated bus after implementation u-pass (it was every 30min peak only service with 40ft bus before). And to get here, it took a few adjustments.
Another example, the service level on most of the shuttle routes in Coquitlam and Port Coquitlam now are already meet or exceeding the level stated in "Evergreen LRT Bus Integration Plan for 2011".
|
They used to run a shuttle along United Blvd. from Braid to Coq. Centre... people were passed up full bus after full bus. Translink soon started using a 40-footer. On the next schedule change, they made it a full bus route, the 177.
With the success of the 125 Patterson - BCIT, perhaps they will consider running the 41 as a B-Line to Brentwood. If artics can't make the loop at Brentwood, they could run it only to BCIT... as the 25 is crush load in the mornings.
Right now, there is not much service on Moscrop... so it could continue from Joyce to Boundary, up Moscrop and down the back side of BCIT (Wayburne) which currently has No bus service (There's quite a bit of density behind BCIT in the form of townhouses), loop around via Canada Way and stop at the front of BCIT on its way back.
edit:
Here's a map of what i mean.