Quote:
Originally Posted by lrt's friend
And when we come up with a plan that specifically designed to increase future suburban density, you object to it.
|
And here lies the truth, the city doesn't need another suburb planned by a builder. I'm against developping outside the Greenbelt, as the official plan. I'm also against NIMBYism in centretown, OMG, a tall building. There was a great article on how much we pay for sprawling that much. Sure, not everybody wants to live in a condo, but I'd love to live in a 75 storey high tower if I had the opportunity.
Quote:
|
On affordability, we first must be able to fund the capital infrastructure. If we can't afford to build LRT to Kanata or Orleans, we can't afford it. It doesn't matter how much traffic there is. We had the N-S project fully funded. It was going to serve a future need. It was going to direct development southward where we can afford to build rapid transit. It was going attract new ridership in an area not presently well served by transit.
|
Again, we can afford it, Clive and Christine's plan was more than anything Delcan ever accomplished. It's all about choices, and Delcan didn't want to do more studies so that's the half ass plan you get.
Quote:
|
Building LRT halfway to Orleans and halfway to Kanata accomplishes virtually nothing.
|
For the difference that separates them, no, it doesn't do much.
Quote:
|
I also say that Ottawa has been very well served by its Transitways. We have accomplished a lot with them. Per capita transit ridership almost matches Toronto and Montreal, which is an incredible feat for a much smaller city. We were not in a position to build LRT like Calgary or Edmonton did. You have to remember that both of those projects were started during the midst of the 1970s oil boom. That kind of money was not available in Ontario. Furthermore, we have seen that Edmonton's project stalled for a generation partly because of the cost of the downtown tunnel.
|
Ottawa wouldn't have a tunnel, like Calgary, the ridership at the time was too low, which isn't the case for both cities now. It was 30 years ago, the city evolved in that timeframe.
Quote:
|
If we want rapid transit to be a success, and if we want to justify the capital cost, it needs to attract a lot of new riders and it has to improve service. Montreal did not extend the subway to Laval because it would lower the cost per rider. It extended the subway to attract new riders and to speed up service. I am sure that other future Montreal projects have similar motivation.
|
Totally agree, but the original N-S didn't attract a lot of new riders, and it cost a fortune to run. Just for a comparison, the Laval subway extentions has added ridership of 65000 daily (it was planned at 45000), so 10 times as more as the planned N-S line, for the same cost. And as a bonus, they still saved on operating costs compared to buses (albeit the cost was transferred to the STM, which is another juridiction issue).