I would think the Evergreen Line would be built in 3-4 years, most likely somewhere in between. If construction were to start this year, it'll be finished by mid-2012 at the very earliest and mid-2013 at the latest.
     
     
  #1062  
Old Posted Jan 29, 2009, 5:58 AM
Jared's Avatar
Jared Jared is offline
 
Join Date: Oct 2001
Posts: 4,051
If they do any work this year, it will likely be on pre-construction things such as demolishing existing structures, relocating utilities, expanding the ROW along the Port Moody rail corridor.

There's still a long way to go beforce you'll see any guideway columns sticking out of the ground. Bid structuring (P3, DB etc.), RFQ, RFP, Negotiation with the prefered proponent, detailed design (i.e. finalizing track alignments), materials and labour aquisition etc.
     
     
  #1063  
Old Posted Jan 29, 2009, 6:01 AM
Metro-One's Avatar
Metro-One Metro-One is offline
 
Join Date: Sep 2008
Posts: 18,036
It seems like even if the pre construction does start this year it will be forever until we actually ride the line, but then again the Canada line felt the same and now it is only months away from opening. The same goes for the Golden Ears bridge, i remember watching the barges on the river pile driving thinking how far away summer 2009 was. And now the superstructure is essentially done.
     
     
  #1064  
Old Posted Jan 29, 2009, 6:35 AM
deasine deasine is offline
 
Join Date: Mar 2007
Posts: 5,747
^We will have detailed designs and public consultations to entertain us =)
     
     
  #1065  
Old Posted Jan 29, 2009, 7:14 AM
nname nname is offline
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by deasine View Post
^We will have detailed designs and public consultations to entertain us =)
There are already lots of info if you dig into the archive.. something like this, this, this, and this. I wonder how much of these can be re-used...
     
     
  #1066  
Old Posted Jan 29, 2009, 7:50 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,816
Quote:
Originally Posted by nname View Post
There are already lots of info if you dig into the archive.. something like this, this, this, and this. I wonder how much of these can be re-used...
Nice! Thanks for the references.
     
     
  #1067  
Old Posted Jan 29, 2009, 7:59 PM
Mininari Mininari is offline
 
Join Date: Jul 2004
Posts: 2,447
Quote:
Originally Posted by nname View Post
There are already lots of info if you dig into the archive.. something like this, this, this, and this. I wonder how much of these can be re-used...
Looks pretty "shovel ready" to me.

But then again, it would sure "stimulate the local economy" to just redesign the whole darn thing again. Why not?

By the way, re: Trasolini... I still absolutely LOVE how his stance was intially COMPLETELY AGAINST SKYTRAIN in favour of LRT, citing "ugly overhead structures ruining the small-town feel of Port Moody." (As if the tens of thousands of daily commuter cars aren't already doing that!).
This statement INCLUDED a fly-over of Barnet highway. I asked him IN PERSON at one of the ill-fated LRT community meetings whether he would consider grade-seperation at the busy Barnet/St. Johns intersection. Even the LRT couldn't have any elevated structures in Port Moody. None.
It appears that he has softened his stance on the "no elevated structures" as skytrain will require a flyover or two. Good to see SOME form of reason in the guy.
     
     
  #1068  
Old Posted Jan 29, 2009, 8:52 PM
twoNeurons twoNeurons is offline
 
Join Date: Aug 2002
Posts: 6,126
Quote:
Originally Posted by Mininari View Post
Curious... how did discussion of the train to Seattle end up in the Evergreen Line Rapid Transit section? I mean, its a great topic (and a sincere JOKE how poor and slow the train service to seattle is), but I think maybe it deserves its own thread?
I've created a new thread for a variety of intercity transport here.

Commuter Rail, Heavy rail, intercity rail, buses, airplanes and ferries.
     
     
  #1069  
Old Posted Jan 29, 2009, 11:31 PM
mr.x's Avatar
mr.x mr.x is offline
 
Join Date: Dec 2003
Posts: 12,805
This is a topic about the Evergreen Line, move it elsewhere or end it right now.
     
     
  #1070  
Old Posted Jan 29, 2009, 11:35 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
 
Join Date: Nov 2005
Posts: 13,169
I think MrX has forgotten he isn't a mod anymore...

and who cares if they keep talking about it here, in a matter of hours it will get moved to the right thread and get continued on there.
     
     
  #1071  
Old Posted Jan 29, 2009, 11:47 PM
mr.x's Avatar
mr.x mr.x is offline
 
Join Date: Dec 2003
Posts: 12,805
^ naw, i just find it quite irritating when the topic completely goes way off its course....i couldn't care less if it gets moved later, the principle is that it's off-topic.
     
     
  #1072  
Old Posted Jan 30, 2009, 12:29 AM
twoNeurons twoNeurons is offline
 
Join Date: Aug 2002
Posts: 6,126
You know... talking about something that's off-topic... is off-topic in itself. This is not a thread of off-topicness!

Whoa... I need more sleep.
     
     
  #1073  
Old Posted Jan 30, 2009, 2:10 AM
deasine deasine is offline
 
Join Date: Mar 2007
Posts: 5,747
I actually haven't seen those documents nname... thanks!

Now we need to package those into the nice Canada Line open house boards and we are off to go =)
     
     
  #1074  
Old Posted Jan 30, 2009, 4:26 AM
Stingray2004's Avatar
Stingray2004 Stingray2004 is offline
 
Join Date: Jan 2004
Posts: 3,145
Back to the Evergreen Line. I must admit that it would have been preferable for an actual figure in the federal budget in terms of their ultimate financial contribution toward the Evergreen Line. Nevertheless, perhaps these tidbits provide some further insight:

Quote:
Evergreen Line negotiations are reportedly underway

Federal money for the Evergreen Line should be in the province’s hands within a month, says B.C.’s transportation minster.

Responding to doubts from critics on whether Tuesday’s budget promise of Evergreen funds will actually materialize, Kevin Falcon said negotiations are already well underway.

.......................................................

A spokesperson for Transport Canada, the agency that handles the Building Canada Fund, said the application process has been simplified and preliminary discussions on Evergreen are already underway.

When the shovel will actually get into the ground depends on decisions yet to be made on procurement, final design and engineering.

CP Rail spokesperson Michael Lovecchio said meetings will likely be scheduled in the next two weeks to begin negotiating the Evergreen Line’s alignment along CP Rail land.
http://www.bclocalnews.com/tri_city_maple_ridge/tricitynews/news/38663409.html

So from some quoted third parties, it does appear that matters are moving forward.
     
     
  #1075  
Old Posted Jan 30, 2009, 4:47 AM
d'ann d'ann is offline
 
Join Date: Sep 2008
Posts: 20
funding statements, possible timeline, and PM mayor on routing

Evergreen Line negotiations are reportFederal money for the Evergreen Line should be in the province’s hands within a month, says B.C.’s transportation minster.

Responding to doubts from critics on whether Tuesday’s budget promise of Evergreen funds will actually materialize, Kevin Falcon said negotiations are already well underway.

“If I could I would sign it in blood,” he said. “We are looking for an appropriate time to make this announcement.... I think it will come sometime in the next month.”
http://www.bclocalnews.com/tri_city_maple_ridge/tricitynews/news/38663409.html

timeline data from previous proposals

http://www.translink.bc.ca/files/pdf/pla...e_Way_Forward_for_the_Evergreen_Line.pdf

Finally, routing Port Moody Mayor and Council are on record as insisting that tunneling continue under the Barnet Highway (not elevated as shown on recent maps) and continue ground level beside CP Rail Tracks.
     
     
  #1076  
Old Posted Jan 30, 2009, 4:50 AM
d'ann d'ann is offline
 
Join Date: Sep 2008
Posts: 20
sorry for the duplicate info. I got called to the phone and missed the other posting
     
     
  #1077  
Old Posted Jan 30, 2009, 5:13 AM
Jared's Avatar
Jared Jared is offline
 
Join Date: Oct 2001
Posts: 4,051
Quote:
Originally Posted by Mininari View Post
Looks pretty "shovel ready" to me.

But then again, it would sure "stimulate the local economy" to just redesign the whole darn thing again. Why not?
Well, detailed design only begins once the contract has been awarded. In terms of preliminary design, I thinm most of those reports have be dusted off, and simply updated where needed. For example, the run-the-guideway-on-the-west-side-of-North-Road idea may no longer be an option, due to construction of several highrises there since that report was done.

Also, there will hopefully be another train yard thrown into the mix somewhere, which I dont think was in the original plan (the Edmonds yard is going to run out of space eventually). Also, there are two more stations this time around, a third Port Moody station, and a total of 3 stations along the Pinetree way corridor (compared to 2 before hand, one at the WCE, and one at either Lincoln or Guildford).
     
     
  #1078  
Old Posted Jan 30, 2009, 6:27 AM
Mininari Mininari is offline
 
Join Date: Jul 2004
Posts: 2,447
Quote:
Originally Posted by d'ann View Post
Finally, routing Port Moody Mayor and Council are on record as insisting that tunneling continue under the Barnet Highway (not elevated as shown on recent maps) and continue ground level beside CP Rail Tracks.
Aha...
Man, I can't believe the gall of Port Moody Council.
They've been BEGGING for rapid transit for years, and now that they've finally got the money coming together, they're still asking for sprinkles on top.

One elevated structure is NOT going to ruin the town.
     
     
  #1079  
Old Posted Jan 30, 2009, 4:26 PM
d'ann d'ann is offline
 
Join Date: Sep 2008
Posts: 20
elevated structure

The positioning of the end of the tunnel near Barnet and St John's is complex as if it is elevated over the Barnet Highway and continues elevated to the CP Rail Tracks, it not only impacts where the Murrey Street By-Pass can be built, it also effects how the 5 acre parcel that is currently owned by Andres Wine, will be developed. Andres Wine has proposed to build a Yale Town inspired development for this inlet fronted property and as there is little available land in Port Moody Centre, and densification near stations is another Translink requirement, inititial construction cost is not the only factor that must be considered during detailed route planning.
     
     
  #1080  
Old Posted Jan 30, 2009, 5:11 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
 
Join Date: May 2007
Posts: 24,740
A "city" the size of Port Moody is damn lucky to be getting any rapid transit.

What about getting a P3 partner in this climate? Is the province going to be the lender? Hopefully it doesn't take long to get "shovels in the ground".
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:32 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.