Quote:
Originally Posted by nerox3
re: using the SE transitway
How about using the o-train and the SE transitway together in a "Y" pattern where you can go south from bayview to south keys, north from south keys to hurdman and west from hurdman (via confederation) to bayview. It would be confusing as all getout but re addressing these sorts of fundamental routing issues at this point indicates we don't have any sort of councillor concensus and aren't getting a train any time soon.
I'm starting to look fondly back at the old LRT plan. If only they had stopped the line at south keys instead of attempting to anticipate growth in riverside south I could have got behind that plan. sigh 
|
I think you have a point there. The 'PLAN' that has been accepted by Council is really just a guideline with some lines on the map.
There will be an east-arm of an LRT which will probably follow the existing Transitway from the University of Ottawa to Blair, but the area of study includes a possible route along Industrial to Innes.
There seems to be a myriad of possibilities for tunnel allignments through the core from Booth to the University of Ottawa. Although a modified version of the 'Cross Country' route will probably be chosen, there are options from Slater to Queen.
I think we can be pretty sure about the route from Booth to Tunneys Pasture running in the existing Scott Trench. This will probably continue through to Westboro.
The stretch from Westboro west is to be determined and could run along the Ottawa River Parkway, the old CPR alignment, or on/under the Byron/Richmond corridor. Apparently Carling is to also be in the study, but I can't believe it will be seriously considered as a possibility.
The stretch from Lincoln Fields to Baseline will be redundant rail and bus lines, but there is no firm idea about how or where these will run.
The western link from the S-W Transitway to Bayshore is up in the air as a new Environmental Assessment (EA) is done to either choose a new route or confirm the previous route. This EA was to have started in 2007, but as of the end of 2008, Staff claimed that they had been too busy to get around to it.
The O-Train will probably be converted to twin-track, electric LRT from South Keys to Bayview. How the train and passengers will connect witht eh west-east trains is still to be determined.
However, Council has directed Staff to evaluate the conversion of the S-E Transitway to rail also. I don't know if this is to be done in addition to, or instead of, the O-Train conversion. I'm not sure Council or Staff know that either.
The EA for the Hospital Corridor has yet to be awarded. (Hopefully in Jan. or Feb., I hear.) It is likely that this EA will need to be tied into the Downtown Ottawa Transit Tunnel (DOTT) EA since the Hospital Corridor will be expanded to run from Hurdman to Blair. This will overlap part of the DOTT study area. (I'm betting that Delcan gets this contract since they are doing the expanded DOTT EA.)
There is a new, major, Confederation Transfer Station to be designed and built, but there has not been much work done on that yet. However, the Baseline Station is getting a total re-build, but the current plans do not appear to be suitable for the future system as shown in the 'PLAN'. For example, the new station will not have a provision for both rail and buses heading north.
If any of the Councillors, or the Mayor, are hoping that their legacy will be a rail system in this city, then they had better hope that they get elected for at least two more terms.