Quote:
Originally Posted by Urban_logic
Well, if you want to go down that route - talk only exsisting and under construction - then the SLC Area has 80 commuter rail (40 exsisting, 40 under construction) and 40 miles of light rail (20 exsisting, 15 currently under construction, 5 soon to break ground). That's a total of 120 miles. The Draper existention I think is more substasive than just a "speculation or thought" and should break ground momnetarily. That would bring us to about 125 miles. Add in the FrontRunner extensions that will happen, just not for a few years, that will extend rail to Payson and Brigham - another 40 miles. Then there are the speculative thoughts of a Sugar House line, Foothill line, and SLC trolley system (easily another good 30 miles). That would put us at just about 200 miles. It sounds like the SLC Area is sneaking up on you!
|
The 80 miles of commuter rail isn't all encompassing within SLC metro. Denver and the Front Range cities near Denver metro (Colorado Springs, Fort Collins, etc) also have commuter rail plans that don't have anything to do with our 150+ mile METRO area light rail and commuter rail FasTracks program. This would be the same as the commuter rail on the Wasatch. Denver is also exploring a city trolley system. So, that would put Denver up by hundreds more miles if everything comes to fruition.
I was just pointing out that Denver has a lot of future miles rail currently under construction and "coming soon" as well....and not to assume that everything will stay the way it is now with other comparison cities.
Good to learn of the progressive rail plans of SLC, Provo, Ogden areas though. I hope everything pans out.