Quote:
Originally Posted by M1EK
electricon, I recommend you spend your time elsewhere as you have absolutely no clue about Tri-Rail (and, yes, light rail lines have been built >15 miles).
The problem with Tri-Rail was that the decision to use the CSX corridor rather than the FEC corridor meant that every single passenger needed to transfer to reach their final destination. Nowhere did I advocate that they should have started with light rail instead, as in 1986 in South Florida, that wouldn't have been possible - but they could have switched to the FEC corridor at any point rather than insisting (against much advice to the contrary) that people didn't mind shuttlebuses. And, yes, they were advised on numerous occasions to switch rather than keep investing in the CSX corridor (including before the disruptive double-tracking project that just completed).
The FEC corridor isn't exactly light rail caliber either, but it IS within walking distance of a few downtown buildings in West Palm, Ft. Lauderdale, Boca Raton, and others.
And 16,000 per day on a corridor that long with many more millions of people in it is a disgrace. That's about half what Houston has managed with their light-rail start, even though Tri-Rail now runs fairly frequently all day long.
|
I'm not going to disagree with you that the FEC corridor would have been the better choice, because it is much closer to the beach. But there were several reasons why the CSX corridor was chosen instead, the main one being it was far cheaper to implement, and what Florida taxpayers were willing to pay.
Tri-Rail is also projecting up to 27,000 passengers a day upon completion of the double tracking projects.
Commuter rail is never going to attract as many passengers as light rail. The stations are placed 3 to 5 miles apart mainly to cut down on travel time over the much longer route. Light rail stations in central business districts are placed 1/4 to 1/2 mile apart, and 1 to 2 miles apart in suburban areas. Light rail trains are used to connect neighborhoods together, commuter trains connect towns and cities together.
You don't have to leave Texas to see the differences. Just look at DART and the TRE. Let's compare the distance, time, and number of stations. Let's use DART's red line for this example.
Distance:
Red Line> 27 miles of double track (South end of track, downtown Dallas, North end of track)
TRE> 34 miles mostly single track (Downtown Fort Worth to downtown Dallas)
Time:
Red Line> 66 minutes
TRE> 63 minutes
Average Speed:
Red Line> 24.5 mph
TRE> 32 mph
Stations:
Red Line> 26 stations (Average being a station every 1.1 mile)
TRE> 10 stations (Average being a station every 3.4 miles)
Passengers:
Red Line> 30,000
TRE> 11,000
Vehicles in use:
Red Line> ~65 of 115 Kinkisharyo LRVs (the rest being use by the Blue Line)
TRE> 13 Budd RDCs, 6 locomotives, 10 bi-level coaches, 7 cab cars.
Capital Costs:
Red Line> More than $2 Billion
TRE> Less than $500 Million