The UK Building stairs are a broad flight of stairs - people can walk around it. For all we know, the entrance may be reconfigured in the future (or the building redeveloped).
Above grade, the elevator and the escalator entrance can't be lined up because below grade, that would mean that the elevator shaft would block the foot of the escalator.
Having the entrance south of Hastings is much better for CBD access than having it north of Hastings.

*****
The number of entrances would have also been kept low to save on overall costs - including escalators, ticket machines, future fare gates, etc.
At 41st and 49th, the decision to build underpasses rather than the preferred mezzanine stations (like Broadway City Hall) would have resulted from the additional cost of excavating a deeper station and guideway to allow for a mezzanine. (i.e. the cost of digging an underpass under the station, versus the cost of digging to lower the entire station to fit a mezzanine above it.)
     
     
  #4622  
Old Posted Jan 21, 2009, 10:13 PM
Dave2 Dave2 is offline
Registered User
 
Join Date: Dec 2007
Posts: 547
Quote:
Originally Posted by Metro-One View Post
Did the expo open with all of its downtown entrances and exits or have some been added on later?
Stadium station has had entrances added (Expo Blvd, the Silk Road side entrance), and one removed (the tunnel under Beatty Street, I used to use that one in the 80s)
     
     
  #4623  
Old Posted Jan 21, 2009, 10:36 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,105
yeah i miss that beatty tunnel
__________________
belowitall
     
     
  #4624  
Old Posted Jan 21, 2009, 11:49 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
Kinda stupid that the 111 Dunsmuir project didn't link the building with that tunnel. It's still there - filled in with sand - in case the Larwill Park project (old bus depot site) wants to be connected to SkyTrain.
     
     
  #4625  
Old Posted Jan 22, 2009, 1:25 AM
deasine deasine is offline
Vancouver Moderator
 
Join Date: Mar 2007
Posts: 5,747
Quote:
Originally Posted by officedweller View Post
The number of entrances would have also been kept low to save on overall costs - including escalators, ticket machines, future fare gates, etc.
At 41st and 49th, the decision to build underpasses rather than the preferred mezzanine stations (like Broadway City Hall) would have resulted from the additional cost of excavating a deeper station and guideway to allow for a mezzanine. (i.e. the cost of digging an underpass under the station, versus the cost of digging to lower the entire station to fit a mezzanine above it.)
Well I still don't think they should have done that for 41st Avenue Station since it is planned to become a future municipal centre. At least they could've made it more fair and dig the ticket concourse lower connecting with the underpass... then have escalators going up to the different platforms. For 49th Avenue, I don't think I mind as much as it would be more of the not-so-used stations on the Canada Line (or not as much).
     
     
  #4626  
Old Posted Jan 22, 2009, 1:34 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
Quote:
Originally Posted by deasine View Post
Well I still don't think they should have done that for 41st Avenue Station since it is planned to become a future municipal centre. At least they could've made it more fair and dig the ticket concourse lower connecting with the underpass... then have escalators going up to the different platforms. For 49th Avenue, I don't think I mind as much as it would be more of the not-so-used stations on the Canada Line (or not as much).
I agree it'll be a pain in the butt for anyone heading northbound. Hopefully the bus stops will be located west of Cambie. That's also the longest traffic light in the City (together with Main & Terminal) (long pedestrian crossing times) - fully actuated with left turn signals in all directions.
     
     
  #4627  
Old Posted Jan 22, 2009, 2:35 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394
Quote:
Originally Posted by SpongeG View Post
yeah i miss that beatty tunnel
I barely remember that tunnel as a kid..............anyone able to dig up an old photo? I will loveya 4ever
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
     
     
  #4628  
Old Posted Jan 22, 2009, 3:02 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
From Richmond Review:

Quote:
Richmond Review
Rainbow wash for Canada Line
By Matthew Hoekstra - Richmond Review

Published: January 21, 2009 5:00 PM

Lite-Brite had a way of turning ordinary black paper into multicoloured works of art.

But unlike the decades old Hasbro toy, the city’s canvas is the Canada Line.

Richmond’s major projects director Greg Scott is proposing the city add some glitz to a a 180-metre stretch of concrete rapid transit line.

Lighting effects along No. 3 Road between Alderbridge Way and the entry road to Lansdowne Mall would add vibrancy to an otherwise unremarkable space, its proponents suggest.

But its opponents, who numbered five after a series of tests last year, complain of driver distraction, light pollution, poor aesthetics and cost.

The lighting, however, would avoid intersections and colours of a traffic stop light, Scott noted in a report to city council’s public works and transportation committee yesterday.

“In addition, this zone has been purposefully designed as a flexible, street-side public plaza capable of hosting a variety of civic celebrations and festivities such as farmers markets, weekend bazaars and seasonal festivals,” according to Scott.

If approved, lighting would be projected on top of some columns, along the guideway and onto the sidewalk using static “gobo” lights, capable of projecting simple images or even logos.

The equipment would be provided by Vancouver-based Lightworks at a cost of $228,000, money Scott optimistically hopes can be found inside the $24-million budget for the No. 3 Road restoration.
     
     
  #4629  
Old Posted Jan 22, 2009, 3:16 AM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Quote:
Originally Posted by raggedy13 View Post
Perhaps it would make more sense if I were to look at it in person, but isn't this concrete structure in the foreground a little too close to that stairway on the right? It looks as if once the station and street are finished there will only be a foot of space for pedestrians to squeeze between those steps and that concrete thing. What is that concrete thing for anyways? Elevator?
I walk past that every day and can't figure it out either. I didn't know what that part was going to be though. Now that I know it's an unattached elevator shaft maybe I can make some sense out of it.
     
     
  #4630  
Old Posted Jan 22, 2009, 3:26 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
180-metre stretch??? o_O


They made such a huge fuss about it, we all had the impression it would be nearly all of No.3 Road or at least much more than 180-metres....
     
     
  #4631  
Old Posted Jan 22, 2009, 3:29 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Almost positive that the UK building entrance is going to be reconfiged after construction.
     
     
  #4632  
Old Posted Jan 22, 2009, 4:16 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,105
no pics but some info: http://vancouver.ca/ctyclerk/cclerk/960725/vtc2.htm

on the sealed up beatty street thing
__________________
belowitall
     
     
  #4633  
Old Posted Jan 22, 2009, 5:01 AM
Vancity's Avatar
Vancity Vancity is offline
Registered User
 
Join Date: Jan 2009
Location: Richmond, BC
Posts: 1,637
Quote:
Originally Posted by mr.x2 View Post
180-metre stretch??? o_O


They made such a huge fuss about it, we all had the impression it would be nearly all of No.3 Road or at least much more than 180-metres....
wasn't the testing of the guideway lighting effects only between Alderbridge, and Lansdowne st originally? I don't remember plans for lighting of the guideway for the entire stretch of No. 3 rd.
     
     
  #4634  
Old Posted Jan 22, 2009, 5:07 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Vancity View Post
wasn't the testing of the guideway lighting effects only between Alderbridge, and Lansdowne st originally? I don't remember plans for lighting of the guideway for the entire stretch of No. 3 rd.
I think we had all assumed that was the "test section".
     
     
  #4635  
Old Posted Jan 22, 2009, 5:19 AM
Vancity's Avatar
Vancity Vancity is offline
Registered User
 
Join Date: Jan 2009
Location: Richmond, BC
Posts: 1,637
Quote:
Originally Posted by mr.x2 View Post
I think we had all assumed that was the "test section".
It was neat when they were testing it. But I have to say, that when driving along that stretch on No. 3 rd, those lights were pretty bright, and it was unsafe for drivers at night driving by. If they could re-design it better, I'd be all for it, because it does liven up the city a bit more at night I'm all for that.

For the 180 meter stretch, how long is that, really? Between Alderbridge and Lansdowne? It would be better if it's throughout the entire stretch of No. 3 rd, but if it's not, I wouldn't complain too much, at least we're getting something, and they could always implement it on the rest of the system in the future, if they wanted to.
     
     
  #4636  
Old Posted Jan 22, 2009, 5:21 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by Vancity View Post
It was neat when they were testing it. But I have to say, that when driving along that stretch on No. 3 rd, those lights were pretty bright, and it was unsafe for drivers at night driving by. If they could re-design it better, I'd be all for it, because it does liven up the city a bit more at night I'm all for that.

For the 180 meter stretch, how long is that, really? Between Alderbridge and Lansdowne? It would be better if it's throughout the entire stretch of No. 3 rd, but if it's not, I wouldn't complain too much, at least we're getting something, and they could always implement it on the rest of the system in the future, if they wanted to.
It'll probably look something like this...
     
     
  #4637  
Old Posted Jan 22, 2009, 5:39 AM
Unregistered Unregistered is offline
Registered User
 
Join Date: Aug 2006
Posts: 78
I caught a glimpse of the LED displays on the Richmond-Brighouse platform today. It looks like it will display the estimated arrival times of the next two trains (from what I could make out).
     
     
  #4638  
Old Posted Jan 22, 2009, 5:52 AM
Gordon Gordon is offline
Registered User
 
Join Date: Jul 2008
Posts: 1,065
It sounds like these displays give the necessary information as opposed to the skytrain ones. I wonder if when the new SkyTrain LCD screens are fully installed and in service will give the same information?
     
     
  #4639  
Old Posted Jan 22, 2009, 5:58 AM
The_Henry_Man The_Henry_Man is offline
HA
 
Join Date: Mar 2006
Location: St. Cloud, MN/Richmond, BC
Posts: 873
Quote:
Originally Posted by Unregistered View Post
I caught a glimpse of the LED displays on the Richmond-Brighouse platform today. It looks like it will display the estimated arrival times of the next two trains (from what I could make out).
And I think those orange texts on the LED displays look A LOT brighter than the current ones on E and M-Lines. It's so much easier to see and read.

Also, I wonder if those flat-screen TV displays that are installed on select E/M-Lines stations will be installed on C-Line stations in the future.
     
     
  #4640  
Old Posted Jan 22, 2009, 6:31 AM
worldwide's Avatar
worldwide worldwide is offline
Registered User
 
Join Date: Oct 2007
Location: Vancouver - Ktown
Posts: 704
Quote:
Originally Posted by jlousa View Post
Almost positive that the UK building entrance is going to be reconfiged after construction.
is that 409 granville? if they put the main entrance on hastings then they would have to rename it... maybe 610 W hastings.

just joking though, in all seriousness, they probably wouldn't change the land title or address
__________________
Hieroglyphics yeah, to the kick and the snare like that, there, yeah, we keep it raw rare
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:32 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.