I would think there's a contingency included in the $2.8-billion....and hopefully it includes 100-110-metre platforms considering it'll be difficult to extend later on....don't cheap out like what some other company did with some other project.....
|
I know I should like a broken record here, but let's make something very clear:
InTransitBC did
NOT unilaterally decide to change the platform lengths, they simply offered a design, and RAVCO selected it. The fact is, the line will meet the ultimate capacity requirement of 15,000 pphpd, which is what is contractually required. Why on earth would you expect them to go above and beyond that, and loose hundreds of millions of dollars in the process?
If you're looking to play the blame game, blame a lack of funding to do the job properly from the get-go, and Cambie Street NIMBYs for forcing a bunch of unnessecary tunneling on the project, resulting in higher costs.