Quote:
Originally Posted by paradigm4
I have heard many TransLink people know about this forum. In this case however, I wrote a post on my blog about it, and Jeff Nagel (the writer of the article at The Leader) got the story from there.
|
Seems like a silly idea. Why not just... increase the size of the train? Longer trains increases capacity.
Either split the tail on the M-Line or the Expo line. Don't reduce it to a shuttle forcing transfers. IF a person want to go to metrotown from anywhere on the Evergreen, it would involve two transfers. And these are transfers are not cross platform.
If a shuttle is absolutely necessary, add a platform at Columbia to allow cross platform transfers (they have to do something anyhow to run it as a shuttle) and do the same at lougheed (using the existing centre platform for the shuttle and the Evergreen, with the two north platforms as the EG line).
Lougheed:
VCC <<<<<<<<<<<<<< EG <<<<<<<<<<<<<< Coq
VCC >>>>>>>>>>>>>> EG >>>>>>>>>>>>>> Coq
<<<<<<<<<<<<<< ML >>>>>>>>>>>>>> (Shuttle in both directions)
Columbia:
<<<<<<<<<<<<<<< ML >>>>>>>>>>>>> (Shuttle in both directions)
Vcr <<<<<<<<<<<<<<< EX <<<<<<<<<<<<<< Sry
Vcr >>>>>>>>>>>>>>> EX >>>>>>>>>>>>>> Sry
This would allow simple transfers from the West on the EG Line, allowing people from Surrey an easy transfer at Columbia, and LH if going to Coquitlam, which was the original intent of the M-Line, to connect the suburbs to each other. From Coq to Metrotown, it's one easy transfer, and one under platform transfer.