HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #461  
Old Posted Dec 17, 2008, 11:07 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by LeftCoaster View Post
You must be quite the handyman!
     
     
  #462  
Old Posted Dec 17, 2008, 11:09 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Well I have some tools and I get HGTV so I'm pretty confident. If I'm missing any tools I can always buy them at Canadian Tire and return them when I'm finished with them. I even have a name for my company. I'll call it On Time and On Budget, I'd be sure to win every bid.
     
     
  #463  
Old Posted Dec 17, 2008, 11:40 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,030
Not if my company bids: "Open Early, Under budget" hehe
     
     
  #464  
Old Posted Dec 17, 2008, 11:59 PM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
XTransitExpress Consortium: "For Free, and Finished in 7-days"
     
     
  #465  
Old Posted Dec 18, 2008, 12:00 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,302
I wonder what's up with the concept of these mega projects. Why couldn't we do... Phase 1 VCC-Clark to Cambie (2015), Phase 2 Cambie to Arbutus (2018), Phase 3 Arbutus to UBC (2020). Manageable, feasible, meaningful phases. Phase 1 will provide a intermediate crosstown connection between two major rapid transit lines and will serve as an interim hub for the 99 B-Line, Phase 2 will connect the rest of the second biggest employment centre and to the Arbutus LRT/streetcar, and Phase 3 will complete the line to a major education, employment, and residential area. Now you have three $900 million extensions instead of one huge $2.8 billion project, and it solves the "how far should we build this thing" dilemma.
     
     
  #466  
Old Posted Dec 18, 2008, 12:03 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
Quote:
Originally Posted by DKaz View Post
I wonder what's up with the concept of these mega projects. Why couldn't we do... Phase 1 VCC-Clark to Cambie (2015), Phase 2 Cambie to Arbutus (2018), Phase 3 Arbutus to UBC (2020). Manageable, feasible, meaningful phases. Phase 1 will provide a intermediate crosstown connection between two major rapid transit lines and will serve as an interim hub for the 99 B-Line, Phase 2 will connect the rest of the second biggest employment centre, and Phase 3 will complete the line to a major education, employment, and residential area. Now you have three $900 million extensions instead of one huge $2.8 billion project, and it solves the "how far should we build this thing" dilemma.
7-years of construction along the same corridor?
     
     
  #467  
Old Posted Dec 18, 2008, 12:19 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,302
Quote:
Originally Posted by mr.x2 View Post
7-years of construction along the same corridor?
Perhaps more like 3 years in each localized phase? Phase 1's construction would start 2011, be at substantial completion by 2014, and be running by 2015 and would affect Broadway from Finning to a bit past Cambie. Work would immediately start on Phase 2 of the project. By 2015 there'll be enough rapid transit connections from the north, south, and east to Broadway/Cambie to augment the impacts of reduced vehicular customers to the central Broadway businesses, plus there will still be plenty of office workers along the corridor that I do not see businesses along that stretch going down like the Cambie businesses. I am worried about the businesses around MacDonald, Alma, Sasamat, etc.
     
     
  #468  
Old Posted Dec 18, 2008, 2:25 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by DKaz View Post
I wonder what's up with the concept of these mega projects. Why couldn't we do... Phase 1 VCC-Clark to Cambie (2015), Phase 2 Cambie to Arbutus (2018), Phase 3 Arbutus to UBC (2020). Manageable, feasible, meaningful phases. .
If it's a bored tunnel, the deployment of a tunnel boring machine would require an access point for the removal of spoil - currently, it is planned to be on the Flats - i.e. there would be a conveyor belt the length of the tunnel for the removal of spoil. Phasing the project would require separate access points (open pit excavations at each stopping point, like at Olympic Village Station) - it may be difficult to find suitable locations for them along the route.

If it's a cut and cover tunnel - I doubt you'd have the same problems with phasing the project.
     
     
  #469  
Old Posted Dec 18, 2008, 4:40 AM
Hot Rod's Avatar
Hot Rod Hot Rod is offline
Big City Enthusiast
 
Join Date: Feb 2006
Location: Seattle-Vancouver-Osaka-Chongqing-Chicago-OKC
Posts: 1,187
why not do a double project?

TBM: Clark to Cambie
Cut/Cover: Clark to UBC

We could take advantage of already having the TBM (little LeLani) and go ahead and build the TBM portion beginning in 2010. In my mind, using a TBM here is essential, given the routing (VCC-Clark station is not in a straight line/route to Cambie, so it would have to curve under houses/businesses, necessitating a tbm). I figure, each pass would take a year, so two years of TBM - complete in the 2012 horizon. Construction of the stations (Cambie [enhancements to the Canada Line-City Hall station, extration point of the tbm, beginning of the cut/cover], Main/Kingsway and perhaps one in-between there and VCC-Clark) would take longer but all complete by 2014. Of course, the track would go further than just Clark though, so the trains can turn around - so the Cambie station would be final.

Also, was it decided that the Expo line would be 120m, the Millennium Line would be 80m, and the Canada Line be 40/50m?

With this as the case, I think we should change the routing of the Millennium Line to go from Columbia to VCC *eventually on to UBC. People will transfer at Cambie or Broadway/Commercial anyways, so why not make Columbia the third transfer? That way, the shorter trains of the Millennium and Canada Lines wont interfere with the longer Expo trains.

This would essentially make the Expo Line an express MASS TRANSIT route, making Millennium Line the crosstown. This would also lesson the confusion, since only Expo and Canada lines would serve downtown; Millennium Line would be the crosstown subway - 3 distinct lines along 3 distinct routes. This would also substantiate the separate stations at Broadway/Commercial (Broadway, elevated for the Expo; Commercial, underground for the Millennium).

People commuting from the east would ride the Millennium Line and transfer at Commercial (or Columbia) onto Expo for Downtown or Surrey, or Canada Line for the Airport. People in downtown would take Expo then transfer to Millennium to get to Coquitlam. People in UBC would take Millennium then transfer to Expo to get to Surrey. Makes things EASY!!!

Here's another idea. Instead of having an Evergreen Line - why don't we just do another Millennium Line extension along the 'evergreen route' but it would be Millennium Line. Chicago does this with their Red Line, it splits into two routes at the southside end. Essentially, Canada Line is doing this (having a split at OMC for either Richmond or YVR. I imagine in downtown, there would be two train routes for the Canada Line, one saying Airport and the other saying Richmond.

Evergreen Line is a very short route and therefore in reality could just be a trunk off of the Lougheed Mall station, giving the new Millennium Line two terminus's on the E End (Coquitlam wherever and Columbia) and UBC on the other.

Thoughts?
     
     
  #470  
Old Posted Dec 18, 2008, 4:48 AM
raggedy13's Avatar
raggedy13 raggedy13 is offline
Dérive-r
 
Join Date: Mar 2006
Location: Vancouver, BC
Posts: 4,450
I thought the TBM got shipped away already... to somewhere like Argentina. Though maybe I just dreamt this.
     
     
  #471  
Old Posted Dec 18, 2008, 5:13 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ yea, Sweet Leilani was disassembled and shipped off months and months and months ago when she reached Waterfront Station earlier this year. I believe she was shipped off to Russia.
     
     
  #472  
Old Posted Dec 18, 2008, 5:38 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by Hot Rod View Post
why not do a double project?

TBM: Clark to Cambie
Cut/Cover: Clark to UBC

Thoughts?
Sure, sounds feasible. Probably more like TBM: Clark to Granville/Arbutus & Cut & Cover: Granville/Arbutus to UBC.

And once you get past Granville/Arbutus, there's less commercial uses on 10th Ave. that would be negatively impacted by cut and cover. i.e. hospitals could be sensitive to cut and cover vibrations (the University Line in Toronto was bored in part for that reason).

For Evergreen Line see this (previously posted in the Metro Vancouver Transit thread):

http://www.translink.bc.ca/files/procurements/Q8-0123_-_11_RTM_SkyTrain_Evergreen_Rev3.pdf

For UBC background info see here (previously posted in the Metro Vancouver Transit thread):

http://www.translink.bc.ca/About_TransLink/Business_Opportunities/Bid_Details/Q8-0121.asp

For Expo Line background info see here (previously posted in the Metro Vancouver Transit thread):

http://www.translink.bc.ca/About_TransLink/Business_Opportunities/Bid_Details/Q8-0123.asp
     
     
  #473  
Old Posted Dec 18, 2008, 5:46 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,129
but they said in the past that Evergreen will be built first and they can't back off on that
     
     
  #474  
Old Posted Dec 18, 2008, 8:02 AM
Jared's Avatar
Jared Jared is offline
senior something
 
Join Date: Oct 2001
Location: Vancouver, Canada
Posts: 4,051
Quote:
Originally Posted by lightning View Post
i thought i pointed this out in the other thread but I think there's some misunderstanding about the Prius article. He's not advocating at all that we should be purchasing Priuses and giving them to students. What he's trying to do is to put the COST of an underground SkyTrain line into perspective. He's saying that it will cost 2.8 billion dollars to build the line which is "twice the cost of the Canada Line per kilometre and three to four times the cost of the Millennium Line."

So essentially he says that we have a choice with how we want to spend our taxpayers money:
A) build one line to UBC and thats it or
B) build multiple rapid transit lines throughout the Metro Vancouver region
The report Condon released back in the summer (the "lots of trams instead of skytrain" one) was full of flawed assumptions. Here's a post I wrote back in the summer as of my thoughts on it. Comments are welcome.

Quote:
- Portland's streetcar is basically a trolley bus on rails; it runs in mixed traffic and stops every couple of blocks. The report suggests you could speed it up by adding a bunch of improvements (i.e. grade separations), but those would be expensive, and suddenly the amount of tram you can buy for $2.8 billion is a lot smaller. But a smaller number isnt quite as dramatic, is it?

- The $2.8 billion figure is (apparently) supposed to be a final-cost figure (i.e. construction costs in 2020 dollars). I have no idea what year they got their Portland costs from (they dont make it clear), but I doubt they assumed another 12 years of construction inflation. Hence, the amount of tram you could built would likely be lower.

- The report automaticaly assumes the tram caused the massive redevelopment of downtown Portland; it it not safe to assume this would not have happened without it. If vancouver built a streetcar along Pacific Blvd in the early 90's, people would claim the streetcar caused Concord Pacific/North False Creek. And yet we know that's false, because all that development happened even without the streetcar. I'm not saying the tram didnt help, I am simply saying the report does not sufficiently analyse the three different possibilities (causation, correlation and co-incidence). Also, there is absolutely no analysis of redevelopment due to SkyTrain, which has shown itself to have, at the very least, a strong correlation to real-estate development. In fact, it would do even better if it wasn't prevented via zoning restrictions (*cough* Broadway, Namaimo, 29th Ave *cough*).

- The study's spending breakdowns for all those European bunch of cities are flawed, since it doesnt examine in which context these different technologies are chosen (i.e. why is there mixed spending and how is technology assigned to different routes). If anything the mixed spending speaks to the sensibility of using the correct technology where appropriate, something I'm sure most of us advocate. Ironically, Paris's Metro system, due to its close station spacing, is too slow to be useful over city wide distances, so they built the RER to cover these long distances. Likewise, use SkyTrain for regional stuff, and trams for localer (i know thats not a word!) stuff. Of course, you have to shrink everything from the Paris context to the Vancouver context, since we're much smaller, but the principle stands. Using Strasbourg as an example is stupid, due to the geographical proximity afforded by being a city of only 250,000, everything is closeby, even if its on the other side of town. A tram system (by itself) would not work in a much larger city, like Vancouver.

- As some others mentioned, building rails along Broadway is more expensive that normal, due to the massive amount of utilities along Broadway.

- They completely ignore all issues surrounding capacity on Broadway. The 1999 report by the CoV predicted, iirc, 120,000 to 150,000 riders/day. It should be noted:
a) report assumed a transfer to Rapidbus at Arbutus
b) numbers were pre-Upass
c) natural population growth has occured since the report
d) people are flocking to transit in droves, for both financial and environmental reason
e) a more built out system by the time the line reaches UBC (canada line, evergreen line already done) makes transit that much more attractive.

- Worst of all is the assumption that speed isnt important, and its station spacing which matters. There's a reason why the 99 B-line is chock-a-block, but the 9, WHICH FOLLOWS THE EXACT SAME ROUTE, doesnt have massive lineups. People want to get where they are going, and they want to get there FAST. Getting to the 99 is a much longer walk for me than the 9, but I still take it. Why...oh right, i save a hell of a lot of time, despite the longer walk. Portlands streetcar averages 16km/h. At 12km to UBC, this would be a 45minute ride, compared to the 40 minute B-Line.

- The map may make a — case for trams, but it doesnt in any manner differentiate between the quality of the two systems in the map.

- The notion that the SkyTrain will only serve Westsiders (cant remember if this was in the study or in the article) is silly. The extention is GEOGRAPHICALLY LOCATED in the Westside (which appently extends as far as Clark Dr. now, but whatever...), but it is really where the ridership is coming from that matters. People all over the lower mainland go to the Broadway corridor and UBC, and hence they will all benefit. The report suggests that it would be nice to be able to use the system to get around you own neighborhood (isnt that what buses are for?), but it ingnores the fundamental fact that lots of people need to commute cross-regionally. Last time i checked, not every neighborhood has a University. Actually, come to think of it, the study seems to have a strange notion that more kms of track is automatically better, when in fact it is the ability to attract (current and future) riders that matters.

---------------------


All that being said, I dont want to make it sound like I think tram/streetcar/LRT —. They dont, infact im strongly in favour of building a bunch of them, but buildign them where they are appropriate. Broadway is not such a place.
     
     
  #475  
Old Posted Dec 18, 2008, 8:25 AM
Jared's Avatar
Jared Jared is offline
senior something
 
Join Date: Oct 2001
Location: Vancouver, Canada
Posts: 4,051
Also, I'd like to say that I think stopping SkyTrain at Alma is ridiculous.

65% of B-Line riders are going to campus (as per stats posted earlier in this thread). This is quite a good chunk of people, and a SkyTrain even as far as Alma would only boost those numbers. Suddenly, a good chunk of the people taking the "keep people off the B-Line" buses (i.e. the 84) will be switching to SkyTrain, because it's simply so much faster than any bus will be. Additionally, you'll have all the people for whom transit is now faster than driving.

A Rapidbus would require a massive bus loop at Alma, and the Alma-UBC segment would probably be overwhelmed. You'd only need a 50% increase in ridership (easily doable) before it's as crowded as Broadway/Commercial is now. LRT from Alma to UBC makes even less sense. Although it could handle ridership a bit better than buses, you'd need a trainyard in there somewhere, and a system that small would have poor economies of scale in terms of vehicle maintainance. Additionally, I'm not sure about the grades just West of Alma, you may need to do some regrading to get the trains to go up (at which point the LRT much of what it's only advantage over SkyTrain is - capital cost.

UBC may be at the "edge of the region", but it is still a massive transit hub (#2 in the entire region, despite no rapid transit) and it will only get bigger. Ending the line at Alma would be like ending Expo at Main St/Science World. That last little bit accounts for a huge portion of the trips. It's worth it.
     
     
  #476  
Old Posted Dec 18, 2008, 9:08 AM
mr.x's Avatar
mr.x mr.x is offline
Registered User
 
Join Date: Dec 2003
Location: Stockholm
Posts: 12,805
^ great posts from someone who is actually in touch and knows what he's talking about. I agree 100%.
     
     
  #477  
Old Posted Dec 18, 2008, 9:10 AM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is online now
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,395
Quote:
Originally Posted by Jared View Post
Also, I'd like to say that I think stopping SkyTrain at Alma is ridiculous.

65% of B-Line riders are going to campus (as per stats posted earlier in this thread). This is quite a good chunk of people, and a SkyTrain even as far as Alma would only boost those numbers. Suddenly, a good chunk of the people taking the "keep people off the B-Line" buses (i.e. the 84) will be switching to SkyTrain, because it's simply so much faster than any bus will be. Additionally, you'll have all the people for whom transit is now faster than driving.

A Rapidbus would require a massive bus loop at Alma, and the Alma-UBC segment would probably be overwhelmed. You'd only need a 50% increase in ridership (easily doable) before it's as crowded as Broadway/Commercial is now. LRT from Alma to UBC makes even less sense. Although it could handle ridership a bit better than buses, you'd need a trainyard in there somewhere, and a system that small would have poor economies of scale in terms of vehicle maintainance. Additionally, I'm not sure about the grades just West of Alma, you may need to do some regrading to get the trains to go up (at which point the LRT much of what it's only advantage over SkyTrain is - capital cost.

UBC may be at the "edge of the region", but it is still a massive transit hub (#2 in the entire region, despite no rapid transit) and it will only get bigger. Ending the line at Alma would be like ending Expo at Main St/Science World. That last little bit accounts for a huge portion of the trips. It's worth it.
well put bro
     
     
  #478  
Old Posted Dec 18, 2008, 11:47 AM
squeezied's Avatar
squeezied squeezied is offline
Registered User
 
Join Date: Jul 2006
Location: Vancouver, BC
Posts: 1,625
well put indeed!
     
     
  #479  
Old Posted Dec 18, 2008, 12:02 PM
CLC CLC is offline
Registered User
 
Join Date: Apr 2008
Posts: 877
Quote:
65% of B-Line riders are going to campus (as per stats posted earlier in this thread).
don't want to spur any argument. But I think we can't say for sure 65% of B-Line riders are campus-bound, the stats only show that the last stretch before reaching UBC the bus is 65% of top load?
From my observation I would say at least half of b-line rider does not take end-to-end trip (from Broadway all the way to UBC)
     
     
  #480  
Old Posted Dec 18, 2008, 12:42 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,106
Quote:
Originally Posted by CLC View Post
don't want to spur any argument. But I think we can't say for sure 65% of B-Line riders are campus-bound, the stats only show that the last stretch before reaching UBC the bus is 65% of top load?
From my observation I would say at least half of b-line rider does not take end-to-end trip (from Broadway all the way to UBC)
19,860 passengers, or 45% of the total 99 B-Line load (44,000pass/day) go to/from the UBC. If you think this ratio is low, keep in mind that only 47% of the total skytrain passengers go past Broadway into downtown. By your logic, we should built the E- and M-Line only to Broadway station and use a shuttle bus to transfer people into and out of downtown?

And if they built the Skytrain to UBC, #17 most likely will terminate downtown, #9 terminate at Blanca Loop, #44 would probably be cancelled (using skytrain + canada line would be faster), same for #84 (they can route another bus such as #50 to take over the local portion of the route), and probably attract some riders off the #4, #25, and #33. Assuming the skytrain can attract a quarter of the rider off the #4 and #25 (I don't have the data for #33 yet), this equals to about 31,000 riders per day, assuming the skytrain attract 0 new rider and no ridership growth for the next 10 years. For comparison, this load is higher than anywhere on the M-Line, or the Expo Line east of Gateway station.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:04 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.