From what I’m hearing about Bayview:
There is a choice of curving the N-S line so that it heads into downtown directly.
Or, the N-S can be a totally separate line from the W-E line. The idea here is similar to that in other cities; change direction - change line.
Both choices have the option to make use of the Prince of Wales Bridge. However, right now, the first choice (curves) does not seem to allow a north-bound train to continue north of Bayview. Riverside South riders would need to transfer at Bayview Station. This could be fixed by completing the circle, but then the train would bypass the station so I don’t think it will be done.
Any preference on these choices?
A little further along, there is Lebreton Station. Again, there are two choices:
where Booth is raised over the train, but the temporary bus loop is built up to cross Booth at grade; and
which has both the temporary bus loop and the train running under a raised Booth.
This second choice is interesting because the idea is that once the buses are removed, we will be left with a very wide platform and extra space between the rails. This extra space is being eyed as space for storing LRVs between commute peaks. Thus, a rail yard will return to Lebreton Flats! (The NCC might not like this idea.)
The bus/rail crossing could be done at grade since the public isn’t involved (except as passengers

).
Any preference on these ideas?