Quote:
Originally Posted by BradMacD View Post
Did anyone see the Brunswick Street Baptist Church is expanding?
Drove by today...thought that might be interesting? xD
Speaking of...

Downtown church gets approval to build addition
Published Friday October 17th, 2008
A3
By HEATHER MCLAUGHLIN
[email protected]

Brunswick Street Baptist Church will be able to move forward on its plan to build an addition onto the church at 161 York St. after receiving a variance approval.

The city's planning advisory committee has granted a 0.65-metre height variance so that the height of a proposed three-storey addition will match the roof line of the vestry.

The height variance will allow for three-metre (10-foot) ceilings in classrooms.

The church is building a 1,687-square-metre education wing. It will contain classrooms on all three levels, as well as a nursery and multipurpose family room on the ground level.

The new wing will be accessed from the York Street entrances to the existing church.

ADI Ltd. is designing the addition.

In other planning advisory committee decisions, city council will be asked to endorse the committee's approval of a home-based counselling practice at 242 Neill St. for Leslie Ann Costello. She wants to build an addition to her home to create a home-based office for her business.

Ross Ventures has been granted a one-year, temporary-use variance to redevelop part of a building it owns at 206 Rookwood Ave. to allow for a family physician's office to be located in the building. The variance will allow renovations to proceed. A zoning amendment to make the location a permanent part of the building will follow.

Shannex Inc., which is developing seniors apartments at Patience Lane, was granted a one-year, temporary-use variance by the committee to set up a marketing sales trailer at 35 Patience Lane.

Shannex is building what it calls a "seniors living campus" with a mix of single-story townhouses, self-sufficient apartments and assisted-living suites that provide meals and personal assistance.

The Halifax-based company plans to include a professional centre comprised of a drug store, pharmacy, clinic, medical and health offices, and a training area for its staff as part of of its project.

The trailer will be a temporary sales office for the company to market its housing options and services.
Reply With Quote
     
     
  #662  
Old Posted Oct 17, 2008, 2:19 PM
magee_b magee_b is offline
Registered User
 
Join Date: Dec 2007
Posts: 263
Crane going up on the Currie Centre site.
Reply With Quote
     
     
  #663  
Old Posted Oct 17, 2008, 11:27 PM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
Quote:
Originally Posted by mylesmalley View Post
lol nerd-gasm
Reply With Quote
     
     
  #664  
Old Posted Oct 18, 2008, 12:32 AM
Smevo's Avatar
Smevo Smevo is offline
Sarcstic Caper in Exile
 
Join Date: Mar 2004
Location: Calgary
Posts: 3,121
Quote:
Originally Posted by cl812 View Post
FYI, They have a webcam set up at the conference centre construction site

http://www.fredericton.ca/en/ConferenceCentreWebcam.asp


All I ever see is it at night, stupid 3 hr time difference.
Reply With Quote
     
     
  #665  
Old Posted Oct 18, 2008, 2:29 AM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
I'mma screenshot it in the day.
:3
Reply With Quote
     
     
  #666  
Old Posted Oct 18, 2008, 2:52 PM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
From todays Gleaner:

City eyes hotel partner for downtown convention centre
Published Saturday October 18th, 2008

A1

By HEATHER MCLAUGHLIN
[email protected]

The City of Fredericton has narrowed the field to four candidates to construct a companion development to the downtown convention centre.

The city is negotiating with the top contender, said Frank Flanagan, the city's development services director.

Fredericton is eying the prospects for a second downtown hotel that can be linked to its 6,300-square-metre (70,000-square-foot) downtown convention centre.

During the annual planning advisory committee bus tour Friday, city staff, planners and committee members toured a number of municipal project job sites and private developments on both sides of the St. John River.

During a stop at the Queen Street location of the $75.5-million convention centre, parking garage and provincial government office building site, Flanagan talked about the project's progress.

The city called for expressions of interest from builders and has analyzed responses.

"A hotel might be compatible, hopefully with ground-floor retail. It depends on the particular developer. We had four proposals and we evaluated them and we're now negotiating with that top contender in that proposal to put a development together," Flanagan said.

The Crowne Plaza Hotel across the street will be linked by a pedestrian walkway to the convention centre.

There will be two links between The Playhouse and the convention centre, and another walkway between the convention centre and an office building.

The office building is being built by the city. The provincial government has committed to leasing the structure for 20 years.

That means guests attending an event at the convention centre won't have to don coats and galoshes or duck under umbrellas to move from one part of the integrated

complex to another.

A parking garage will be constructed with a waterproof basement and spaces for 250 cars underground and 450 spaces in the above-ground portion of the structure.

Parking will be on the pay-by-space system, so the parking garage won't be gated.

"This will really be a 24-hour facility and an event-driven facility," Flanagan said.

"No gates. They can drive out (using) about four entrances."

Excavation begins Monday for the convention centre foundation. Structural steel has been pounded into the clay to create a barrier so water can be pumped out as the waterproof concrete basement is poured. Foundation and concrete work will continue for 10 months, said project supervisor Greg Cook.

An archeological review of the soil hasn't unearthed any surprises. Bottles and brickwork from the former Queen Hotel were unearthed, but little else of historical value was found.

Flanagan said the downtown development is going to transform the city centre and downtown businesses are interested in capitalizing on the project.

"Already, there's other developers in the downtown coming in, asking questions, trying to do things with their properties that will enhance our whole downtown picture," Flanagan said.

The main level of the conference centre will feature eight large conference rooms. The second floor will have a ballroom and a kitchen for banquets.

The development is slated for completion in 2010.

Queen Street to St. John Street will be converted from a one-way street to a two-way street to allow for buses and passenger pick-up and drop-off.

------------

Airport launches strategy to promote changes, improvements
Published Saturday October 18th, 2008

A3

By MICHAEL STAPLES
[email protected]

Welcome to YFC - "your Fredericton connection."

Officials with the Fredericton International Airport are using the familiar call letters as part of a new strategy to further promote the facility on the local, provincial, national and international levels.

Details of the plan were released Friday at a function held in the Fredericton city council chamber.

A public launch of the new brand will take place at the airport today from 11 a.m. to 3 p.m.

David Innes, CEO of the Greater Fredericton Airport Authority, said the facility needed to be rebranded to forge a firmer connection with the communities it serves.

"We want to make sure our community knows who we are and understands what we do," Innes said.

"We want to make sure they understand what our capabilities are. I think we have put together a lot of work over the last few years. We have done a lot of things, but we haven't consolidated in terms of a simple and central message."

Some of the points being highlighted by the airport's new strategy include: a restructured parking lot and payment system; re-fitted departure lounges; free wireless Internet; the creation of a multipurpose pavilion; a new direct flight to Gatwick Airport in England; the longest runway in New Brunswick; and an improved website.

Innes said the goal of the airport has always been to meet the needs of the community.

"We have a very strong local economy and a growing local economy," Innes said. "Our task is to make sure that we have enough services to satisfy our community."

Mayor Brad Woodside said taking the airport to the next level is important.

"In today's information-technology world that we live in, and with the world getting smaller, air transportation is extremely important for those who want to do business."

Anthony Knight, CEO of the Fredericton Chamber of Commerce, said the airport is a key economic catalyst for the community. Changes at the airport over the last several years have enhanced its image, he said.

"We have seen great things happen and with the new brand, things will only continue to grow and expand," Knight said.

Coun. David Kelly said the airport's rebranding is a direct reflection on the fact the city and its surrounding areas are growing. The city's record development is illustrating that more and more things are happening in Fredericton, he said.

"By having an international status, it (the airport) will show we're a place to do business," Kelly said.

"We are actually putting ourselves bigger and bigger on the map ... and I think it's going to be telling people that Fredericton is a vibrant place and a great place in Atlantic Canada."

Innes, meanwhile, said efforts continue to establish a direct flight between Fredericton and the U.S.

"We are working on it and we are still talking to a few airlines," he said.

But, he said, there a lot dynamics at play right now that are affecting a possible outcome.

Innes said the overall economic picture south of the border has to become clearer before an announcement on another such initiative can be made.

Fredericton lost its link to Boston in December after Delta Airlines pulled the plug on the service. Over its four years, the direct U.S. air service met the needs of more than 75,000 business and leisure travellers.

With regard to WestJet, Innes said the airport is in discussions with the company with an effort to have it establish a base here.

"We are always looking for more capacity, more seats and better prices for our users," Innes said.

--------

Look up, look waaaaaay up
Published Saturday October 18th, 2008

a1



DOMINATING THE SKYLINE: a tower crane is being used to assist in the construction of the Richard J. Currie Centre on the University of new Brunswick campus. The crane towers over the Fredericton skyline and can be seen from many places around the city.
Reply With Quote
     
     
  #667  
Old Posted Oct 19, 2008, 7:04 AM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
YES.
A SKYWALK
I love skywalks. xD
Excavation starting Monday...
YAY
I saw that crane today, too. :o
It's actually a lot bigger than it looks in the picture.
Reply With Quote
     
     
  #668  
Old Posted Oct 19, 2008, 9:19 PM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,103
Quote:
Originally Posted by BradMacD View Post
YES.
A SKYWALK
I love skywalks. xD
Excavation starting Monday...
YAY
I saw that crane today, too. :o
It's actually a lot bigger than it looks in the picture.
I hope it gets used more than the two they built in moncton about ten years ago. You occasionally see someone cross between the Blue Cross building and City Hall, but I've never seen anyone go from the federal building to Highfield Square.
Reply With Quote
     
     
  #669  
Old Posted Oct 19, 2008, 10:21 PM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
Wasn't there once talk of one between Carleton Place and the NB Power Building?
Er, HSBC Place, excuse me.
I honestly don't understand what it'd get used for. xD
BMO clients wanting a coffee at the Happy Baker.
Reply With Quote
     
     
  #670  
Old Posted Oct 20, 2008, 3:48 AM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,103
Quote:
Originally Posted by BradMacD View Post
Wasn't there once talk of one between Carleton Place and the NB Power Building?
Er, HSBC Place, excuse me.
I honestly don't understand what it'd get used for. xD
BMO clients wanting a coffee at the Happy Baker.
Exactly. Honestly, how many people working at the federal building would need to visit the Bay at lunch? And if you wanted to go to the food court, it would be significantly faster to just cross the street.
Reply With Quote
     
     
  #671  
Old Posted Oct 20, 2008, 10:41 PM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
I can see two mall-like buildings or something huge for tourists [which Fred lacks]
But not...yeah. xD
BUT SKYWALKS ARE SO FUN 8D
Reply With Quote
     
     
  #672  
Old Posted Oct 21, 2008, 2:26 AM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,103
Quote:
Originally Posted by BradMacD View Post
I can see two mall-like buildings or something huge for tourists [which Fred lacks]
But not...yeah. xD
BUT SKYWALKS ARE SO FUN 8D
your enthusiasm amuses me.

is there a difference between a pedway and skywalk?

i've always called the ones home pedways. but the one between Terminal Plaza and the CN building is 7 stories above ground. Then of course, there's the petronas towers. I'd definitely call this one a skywalk...

Reply With Quote
     
     
  #673  
Old Posted Oct 21, 2008, 1:32 PM
kirjtc2's Avatar
kirjtc2 kirjtc2 is offline
Nashwaaksissy
 
Join Date: Apr 2006
Location: Fredericton, NB
Posts: 1,280
Geez, I hope nobody who has to take that skywalk is scared of heights...

Anyway...


City seeks ideas on how to improve transportation
Published Tuesday October 21st, 2008
A3
By HEATHER MCLAUGHLIN
[email protected]

Frederictonians with beefs about, or good ideas for, the city's transportation system will have two chances to help city hall update its traffic study.

ADI Ltd. has been hired by the city to review the report. What the city's municipal plan does for forecasting future directions of city planning, the traffic study does for roads and streets. The traffic study will set goals and objectives for improving the city's street system for the next decade.

The first open house is set for today from 3 p.m. to 8 p.m. at city hall.

On Oct. 27, a second session will be held from 3 p.m. to 8 p.m. at Willie O'Ree Place.

"It's an important study that we need to initiate," said transportation committee chairman Coun. Bruce Grandy. "As development grows in the city, we have to look at all the traffic patterns and the increased overloading on some roads."

The report will show how the city and provincial Transportation Department road network should be integrated. Within city limits, the province owns main feeder roads called provincially designated highways, while the city controls local arterials, collectors and residential streets.

Planning and traffic go hand-in-hand, Grandy said, and it's important for the traffic study to look at where major infrastructure projects are planned so that surrounding roads are upgraded. These projects include the city's rinks and fire stations, as well as private developments such as major shopping districts.

"I would encourage people who are concerned about traffic issues - both business and private citizens - to get out to the open houses and give us some feedback," Grandy said.

City traffic engineer Darren Charters said the city's last transportation study was done in 1999 and released in 2000.

Typically, such plans should be updated every decade, Charters said, but the pace of Fredericton development is pushing that timetable forward.

"There's been so many changes as far as city projects and provincial.

"There's some planned provincial projects in the works. Given that and all the development ... it's a good time to get that (transportation plan) updated," Charters said.

With the pace of development on the north side of the St. John River, the city is ready to discuss the concept of reverse direction of traffic on the Westmorland Street Bridge.

In Halifax, for instance, the four-lane Angus L. MacDonald Bridge has three lanes of traffic flowing into the downtown in the morning and three flowing out during the evening to handle peak traffic loads.

Improvements to Regent and Prospect streets, the east end of the Princess Margaret Bridge, pedestrian crossings, and street safety issues are all on the agenda for public discussion.

"We want to hear more detailed issues that people may have," Charters said.


-----------------------------


Corbett Centre in talks with more retailers

Published Tuesday October 21st, 2008
A1
By HEATHER MCLAUGHLIN
[email protected]


With key tenants in place at the University of New Brunswick's Corbett Centre property, the company developing the site is working to continue to expand its list of retailers.

Trinity Development Group is the shopping mall development firm partnering with UNB to develop land on Regent Street and Knowledge Park Drive.

With Home Depot, a Michael's arts and crafts supply store, Petcetera, Dollarama and Winners in place and open for business - along with two new eateries - the smaller retail components of the centre are starting to fill in.

Corbett Centre project manager Stewart Watson of Trinity Development Group told city officials, planning advisory committee members and city councillors recently that the centre is about one-third complete, but negotiations are ongoing to sign up new tenants.

Some retailers who are in talks with the developers include a furniture rental business, a beauty salon, a store specializing in wicker products and a weight loss and nutrition centre.

Scott Fash with Terrain Group, the engineering and planning firm developing the buildings, said one of the unique features of the Corbett Centre property is its inward design.

All of the stores have their front entrances facing the central parking lot and the backs or sides of their buildings facing Regent Street and Knowledge Park Drive.

Fash said the shopping centre was designed with high-end building materials and more landscaping within the shopping centre than is typical of a lot of similar centres in Eastern Canada.

"It's come together quite well. It's still early on in the process, but again, all in all, it's coming along well," Fash said.

The mall is encircled by a walking path system designed to promote pedestrian movement around the site and eventually to interconnect with Knowledge Park buildings, which house information-technology firms, and ultimately, the University of New Brunswick campus.

Fash said he's seen shoppers walking from store to store within the development because of the landscaping and walkway system, which isn't always typical of many big-box developments.

City development services director Frank Flanagan said the developers went to great pains to ensure that landscaping was done both in front and in back of buildings, and they've done a commendable job.

"It really doesn't look like the back end of a shopping centre.

"They've created an esthetically pleasing development," Flanagan said.

Still ahead for the Corbett Centre site is the construction of a Costco store. UNB and the company have inked a letter of intent, but the site for the wholesale, members-only grocery and retail business has to be rezoned.

Costco is slated to be located to the south of the Home Depot.

The land for the development will require provincial environmental approvals since it falls in part of a wetland at the edge of the Corbett Centre property.

UNB has identified part of its woodlot as a development area but has earmarked other lands to remain in their natural state in perpetuity.
Reply With Quote
     
     
  #674  
Old Posted Oct 21, 2008, 7:13 PM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
From City Website: http://www.fredericton.ca/en/ecodev/2008Oct21DevStats.asp

City Development on Record Pace -
Third-Quarter Total Tops $122.6 Million




Fredericton (October 21, 2008) - The total value of construction in the City of Fredericton for the first nine months of 2008 topped $122.6 million, putting the City on target for its best-ever year of development.

"We anticipate this year that we will break the record of $132.4 million set in 2006," said Councillor Dan Keenan, Chair of the City's Development Committee. "Everywhere you look in the City these days there's a new store, building or housing development under construction."

Overall new housing starts are keeping pace with the past several years with the total value of residential construction from January through September at $45.5 million. That compares to $40.8 million for the first nine months of 2007. Total unit starts in 2008 stand at 345. Multiple unit starts topped 169, just under the 174 in 2007. Single detached construction for the year to date stands at 176, compared to 174 last year at the same point. The average value of a new single detached home so far this year is $152,716.

New housing construction to-date in 2008 include an 11-unit condo development on Westbrook Lane; two new 18-unit apartment buildings on Valcour Street; a 42-unit apartment building on Regent Street; a 16-unit apartment building on College Hill Road; an eight-unit affordable housing complex on Cliffe Street; a three-unit townhouse on Huntingdon Circle and a four-unit townhouse on Sarah's Lane.

"We are seeing new homes and apartments under construction in all areas of the City," said Coun. Keenan.

Commercial construction activity continues to be red hot with $20.5 million recorded for the first nine months of 2008. Commercial construction in the first nine months of 2007 set a record at $28.2 million. In 2006, the value of commercial construction for the entire year was $18.3 million.

Tenant fit-ups at the Corbett centre and the Uptown Centre, as well as a new commercial strip mall on Bishop Drive; a new office building and a new furniture store on Alison Boulevard and a new service station are driving commercial growth.

Industrial construction in the first three-quarters of 2008 came in at $3.2 million, four times higher that the $737,000 for the same period in 2007 stands. New industrial construction includes a Covey Basics warehouse on Alison Boulevard; storage buildings on St. Marys Street and Urquhart Crescent; a Colpitts office expansion on Hanwell Road; and a new building for Praxair on Alison Boulevard.

"This is not attributable to one or two large permits but rather a number of smaller permits for expansions and new buildings for existing businesses," said Coun. Keenan. "It's an indication that existing businesses are confident and willing to continue to invest in the City as their businesses grow and expand."

Government and Institutional construction for the first nine months of 2008 was very strong at $40.6 million, four times as much as the $10.8 million recorded in a similar time period in 2007. The strong growth in the Institutional sector was helped by the start of construction of the Richard J. Currie Center for Healthy Living on the University of New Brunswick campus; and a foundation permit for an addition to York Manor.

On the government side, construction is under way on a the Bliss Carmen Middle School on Kimble Drive, a new fire station on Two nations Crossing and work on the foundation for the East End Development project.

Permits are expected to be issued by year's end for the first phase of construction of the Shannex Senior Living Community on Rainsford Lane and Patience Lane, continued work on the York Manor addition and the New Education Wing on the Brunswick Street Baptist Church; the new south side sports & leisure complex, a new building on Knowledge Park Drive, new stores in the Corbett Centre, and ongoing development of the east end project.

- 30 -

Media Contact: John White, Communications, City of Fredericton, 506-460-2227.
Reply With Quote
     
     
  #675  
Old Posted Oct 21, 2008, 7:25 PM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
Quote:
Originally Posted by mylesmalley View Post
your enthusiasm amuses me.

is there a difference between a pedway and skywalk?

i've always called the ones home pedways. but the one between Terminal Plaza and the CN building is 7 stories above ground. Then of course, there's the petronas towers. I'd definitely call this one a skywalk...
Hm.
I call the bridge to the green a pedway...
But I'd call something from two buildings to each other a skywalk I suppose.
Something enclosed?

EDIT:
I said I'd screencap the daylight picture of the E Centre.
They started excavation today!
Reply With Quote
     
     
  #676  
Old Posted Oct 21, 2008, 8:36 PM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,103
Quote:
Originally Posted by BradMacD View Post
Hm.
I call the bridge to the green a pedway...
But I'd call something from two buildings to each other a skywalk I suppose.
Something enclosed?

EDIT:
I said I'd screencap the daylight picture of the E Centre.
They started excavation today!
That was all done TODAY?

Guessing they didn't hire a union!
Reply With Quote
     
     
  #677  
Old Posted Oct 22, 2008, 5:04 PM
kirjtc2's Avatar
kirjtc2 kirjtc2 is offline
Nashwaaksissy
 
Join Date: Apr 2006
Location: Fredericton, NB
Posts: 1,280
Record construction year to cushion blow
Published Wednesday October 22nd, 2008
Economic slowdown | City says it’s in good shape to weather downturn
A1
By HEATHER MCLAUGHLIN
[email protected]

Another record-breaking development year in Fredericton will help to carry the local construction sector through an economic downturn, says Mayor Brad Woodside.

With volatility in the financial sector and Canadian banks tightening the rules on mortgages, Woodside said the fact that the city has construction projects on the books that will take another two years to complete will help the local economy remain stable.

"We continue to forge ahead despite some of the weak economic signals coming out of the United States and around the world,'' Woodside said.

"I think the real good news here is that our projects have been approved, financed, are on the books and under construction and will take us through about a two-year period which will keep contractors and keep people busy.''

Within a year or two, he said, global markets should stabilize and the city will be positioned to forge ahead.

"I think we're in a great financial position with the decisions we've made to carry us through some pretty difficult times that we have in front of us.''

Fredericton's development committee chairman, Coun. Dan Keenan, released details of the city's third-quarter construction report Tuesday.

Total value of construction for the first nine months of 2008 topped $122.6 million, and that puts the city on track for its best year of development.

"We anticipate this year that we will break the record of $132.4 million set in 2006," Keenan said. "Everywhere you look in the city, there's a new store, building or housing development under construction.

"I think we're very fortunate. We've got a lot of development projects still on the books to move forward and I think that will help us over the next short term ... certainly longer than the next 12-month period."

Keenan said the city's $75.5-million convention centre has started and will take about two years to complete. A seniors development by a Halifax-based nursing home company called Shannex will start this year.

The retail sector is expanding and work on the southside arena is slated to begin soon.

"There's a lot of positive projects moving forward in the next couple of months. I think it looks very good for the City of Fredericton,'' said Keenan. "I think there's still a positive environment in the city and that's a good thing.

"We're knocking on the doorstep of our record year of development and we'll see if we can reach that mark for this year.''

Government and institutional construction, coupled with commercial building, has dominated the building scene this year.

Commercial construction is at $20.5 million this year.

That's the second best year in the city's history, second only to 2007, which set a record of $28.2 million for the year. In 2006, the value of commercial construction for the year was $18.3 million.

Government and institutional construction is at $40.6 million, four times as much as the $10.8 million recorded for the same time period in 2007.

The University of New Brunswick's Richard J. Currie Centre for Healthy Living will not only draw more students to the University of New Brunswick campus,

but provide the community with an asset it can use, said Coun. Scott McConaghy of the city's development committee.

York Manor is constructing an addition to its senior citizens care centre.

Industrial construction for the first three quarters of 2008 rang in at $3.2 million, four times higher than for the same time period in 2007.

New industrial construction includes a Covey Basics warehouse on Alison Boulevard, a storage building on St. Marys Street and Urquhart Crescent, a Colpitts office expansion on Hanwell Road, and a new building for Praxair on Alison Boulevard.

-------------------------


Citizens don't jam city hall for open house about traffic

Published Wednesday October 22nd, 2008
A6
By HEATHER MCLAUGHLIN
[email protected]

No one likes criticism, but the City of Fredericton really wants to hear all your beefs about traffic, says transportation committee chairman Coun. Bruce Grandy.

At a two-hour open house at city hall Tuesday, only four citizens showed up to have their say about what's wrong with the city's traffic system and offer their opinions on how to fix it.

The city has hired ADI Ltd. to update the capital city traffic study. The revised plan is going to guide street and bridge development for the next 20 years, Grandy said, so it's important for people to have their say.

"We're an open book for the problems in traffic. We want to know where your problems are, where your complaints are, where you think things need to be improved. It's all about getting out the negative side of traffic so we can do some positive things to improve it," Grandy said.

The city's second open house on traffic will be held Monday from 3 p.m. to 8 p.m. at Willie O'Ree Place.

"I would encourage people to get out and get their input in or get on our website and e-mail me or Mayor Brad Woodside and give us your suggestions about traffic and we'll forward them to the consultants," Grandy said.

Don Good, senior transportation engineer with ADI, said given the city's outstanding residential, industrial and commercial growth, it's time to update the study.

One key issue is when and where to construct a third crossing over the St. John River.

The Westmorland Street Bridge and Princess Margaret Bridge handle 70,000 vehicles per day.

"Twenty years from now, if that increases by 50 per cent, we might have some issues crossing the bridges," Good said.

Part of this study will look at how to make the city's two bridges run more efficiently. One concept is to use reverse lanes, turning three lanes of the four-lane Westmorland Street Bridge into southbound lanes during the morning rush hour and three lanes northbound when workers are heading home from the south side of the river.

The most probable location for a third river crossing is somewhere above the Tim Hortons on Woodstock Road.

That's because the northwest side of the city in the Douglas area is an area predicted to see residential growth in the future.

Planning has to take place now to reserve land for a third bridge, Good said.

The consulting firm hopes to have a draft to the city early in the new year, hold another series of public meetings to present the results and then report to city council with a final plan in February.

Cheryl Weekes of New Maryland came out to the meeting Tuesday afternoon to urge the city to do more to educate drivers and pedestrians on pedestrian crosswalk safety.

Weekes, who moved to the capital city area a year ago after living in England for more than two decades, said Fredericton should do what the British do and segregate vehicle and pedestrian crossings.

In England, vehicle traffic is given priority, but when it's time to let pedestrians cross streets, all traffic is halted and not only can pedestrians cross north-south and east-west, but diagonally across an intersection as well.

"(In Fredericton), everybody just takes the right of way and doesn't really look before they cross the street," Weekes said.

David LeBlanc, who lives on Reid Street, said getting up Regent Street is getting more and more frustrating.

"One would think I should be able to get up Regent Street and get to the Vanier (Highway) easily, but sometimes it takes half an hour to get up the hill," LeBlanc said.

He said rather than get stuck in Regent Street traffic, he'll drive to the opposite end of the city to try to work his way to the top of the hill to hit the shopping areas.

"It's just something that's a big bottleneck. Late in the day, in the afternoons, the street is just backed up bumper to bumper. You just creep so slow it's just crazy. It's frustrating to sit around and wait in lineups," LeBlanc said.

While he acknowledged Regent Street and Hanwell Road are the two main arteries in and out of town, the traffic situation will only worsen in future because most of the new retail and business development is taking place south of the former Trans-Canada Highway, he said.

He'd like to see the city consider a project that's long been in the concept stage - building an overpass across the former TCH at Smythe Street to Bishop Drive.

Fredericton's website is found at www.fredericton.ca. Traffic engineer Darren Charters may also be contacted with comments at [email protected].
Reply With Quote
     
     
  #678  
Old Posted Oct 22, 2008, 8:15 PM
BradMacD BradMacD is offline
likes candy
 
Join Date: Jan 2008
Location: Fredericton, New Brunswick
Posts: 79
Quote:
Originally Posted by mylesmalley View Post
That was all done TODAY?

Guessing they didn't hire a union!
Lol.
I read somewhere [probably on this thread] that they started excavation Monday.
So...I guess. xD
Reply With Quote
     
     
  #679  
Old Posted Oct 23, 2008, 12:02 PM
cl812's Avatar
cl812 cl812 is offline
Registered User
 
Join Date: Sep 2007
Location: Fredericton, NB
Posts: 1,513
New fire station ahead of schedule
Published Thursday October 23rd, 2008
A4

By HEATHER MCLAUGHLIN
[email protected]

The construction of a central fire station for Fredericton is on budget and ahead of schedule.


Enlarge Photo STEPHEN MACGILLIVRAY PHOTOA LITTLE FIRE FOR THE NEW FIRE HALL: The Fredericton Fire station on Two Nations Crossing is coming along ahead of schedule. Above, Adam Noseworthy, a welder/fitter with Tek Steel Ltd., welds a bracket on a support beam Wednesday. "It's moving along extremely well and what Simpson Construction have advised is that they hope to be completed by April or May," said Fredericton fire Chief Philip Toole.

The $5-million fire station's target completion date, weather-permitting, is next summer.

Simpson Building Contractors has the contract to construct the building at Two Nations Crossing. The building will replace the York Street fire station as the administrative headquarters for the fire service and the main fire facility.

MacLaren Avenue and Harrison Court fire stations will be closed once the new facility opens.

Designed by Sperry and Partners of Halifax, the fire hall will contain bays for fire trucks and emergency vehicles, locker rooms, day rooms, a dorm, training rooms and administrative offices.

A separate $1.9-million, four-storey fire training facility is nearing completion, Toole said, and the last component - the installation of training props - starts next week.

The fire chief said Fredericton will be undertaking a strategic plan to look at marketing the training facility and will take a look at the needs of the public safety training market.

Fire, police, ambulance, emergency measures organization staff and smaller fire departments that require training are all potential clients of the facility - the only one of its kind in Eastern Canada.

"We're looking at who is providing that training and how it is presently being funded ... We definitely want to look into market share for our department," Toole said.

The pre-manufactured, silo-like steel building, purchased from a Sun Prairie, Wisconsin firm, is a unique training structure in Atlantic Canada.

The building is divided into a variety of room types with a propane-fired burning system designed to create intense heat - between 260-370 C - and to simulate smoke, fire and flashover fire situations.

The second floor of the training station has space for a training officer to create a maze to drill firefighters on escape techniques.

Firefighters will train on the third floor of the building, which is designed to simulate conditions a crew would face in battling an attic fire. Firefighters will use upper parts of the building to practice rappelling.

The exterior of the training facility has poured concrete pads where fire crews can set up a vehicle and practice techniques for removing individuals trapped in a vehicle and for fire extinguisher training.

Practice hydrants will be located on site.

Monteith Underground Services did the site preparation and assembled the four-storey building.

The city will sign training agreements with Prince Edward Island's Holland College and other fire departments to offset operating costs.

The city plans a second new fire station in the Silverwood area in the future.

---------

Currie centre gets injection of funding from province
Published Thursday October 23rd, 2008
A5

By STEPHEN LLEWELLYN
[email protected]

The $50-million Richard J. Currie Wellness Centre being constructed at the University of New Brunswick would be much more modest without millions in funding from the provincial government.

Premier Shawn Graham announced $10 million in funding for the new centre in a speech to the Fredericton North Sunrise Rotary Club on Wednesday.

Bob Skillen, UNB's advancement officer, said the funding was critical because of the size of the project.

"It was extremely important," Skillen said. "(Not having the government money) would have changed the nature of the project. We have a project now that is going to accommodate a variety of needs."

Graham said when he first heard about the project he was impressed by the university's vision for it and what the centre could mean for promoting wellness and combating the province's health challenges, such as obesity.

The project will include a fitness and lifestyle assessment centre to enable New Brunswickers to assess their fitness levels and learn how to be healthier, Graham said.

"Investing in the Richard J. Currie Wellness Centre demonstrates our commitment to help New Brunswickers be healthier," Graham said. "It also reflects the commitment in our Post-Secondary Education Action Plan to invest in infrastructure that will allow New Brunswick universities to be at the forefront of post-secondary education and research.

"Being leaders and being innovative will help us achieve our goal of being self-sufficient."

Skillen said the university knew about the $10 million in advance and that allowed it to take advantage of existing construction prices by beginning the $50-million project during the summer.

He said the province is supporting the centre because of its research and teaching focus.

"The space in the Currie centre will be used in many ways as a living laboratory," Skillen said. "The centre is the anchor for the university's healthy-living village concept."

Skillen said that concept will bring the university together with the health sector and other sectors to work on strategies to improve the health of the population.

He said the university can work with those sectors to find ways to combat chronic disease epidemics.

Those partnerships, Skillen said, could mean the inclusion of more buildings in the future.

"We are hoping that new programs will emanate out of the Currie centre that will have an impact not only on Fredericton and the University of New Brunswick, but also have benefits for the whole province," Skillen said.

"If things were to unfold as we would like them to unfold, we would have a new wellness industry that would be partially stimulated by activities growing out of the centre."
Reply With Quote
     
     
  #680  
Old Posted Oct 23, 2008, 5:05 PM
mmmatt's Avatar
mmmatt mmmatt is offline
Our Tide is Rising
 
Join Date: Feb 2007
Posts: 2,755
Quote:
Originally Posted by mylesmalley View Post
I hope it gets used more than the two they built in moncton about ten years ago. You occasionally see someone cross between the Blue Cross building and City Hall, but I've never seen anyone go from the federal building to Highfield Square.
They get used quite a bit...whenever I walk downtown during the day (business hours) I always see a flow of people (small flow, but a flow nonetheless).

The one between highfield and the fed. building is because that department has office space in both buildings I believe.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 10:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.