Quote:
A city staff report that reveals details of the latest expansion also hints of another future phase of casino resort expansion on the horizon.

Great Canadian spokesperson Howard Blank was short on details and refused to comment on expansion plans.
This is probably referring to the casino parking lot site east of the existing casino building.
Reply With Quote
     
     
  #802  
Old Posted Oct 9, 2008, 3:56 PM
vanlaw vanlaw is offline
Registered User
 
Join Date: Oct 2007
Posts: 667
Quote:
Originally Posted by osirisboy View Post
so how big is the actual casino portion at river rock? 37000 sqft seems kind of a small expansion.
It's currenlty 70,000 sf, so it would be an increase of more than 50% - I'd say pretty substantial.

The new parkade is done, although it appears they are just using it for valet parking at the moment.
Reply With Quote
     
     
  #803  
Old Posted Oct 9, 2008, 11:41 PM
Smooth's Avatar
Smooth Smooth is offline
Registered User
 
Join Date: Jan 2004
Location: Vancouver
Posts: 906
New casino signage for the Villa Casino in Burnaby went up today.
Reply With Quote
     
     
  #804  
Old Posted Oct 10, 2008, 5:09 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Another cancellation, this one was expected, wonder if the Lougheed/Willingdon project will be next.

CONDOMINIUM APARTMENTS & TOWNHOUSE DEVELOPMENT Proj: 7239097-6 New Westminster, Greater Vancouver RD BC CANCELLED/DEFERRED
Larco Downtown Waterfront Proposal, 600-700 Block of Front St, V3W
$300,000,000 est
Note: This project is on indefinite hold; further update in late 2009/2010.
The architect requests NO PHONE CALLS please.
Project: The proposed development may include the following: five condo towers with a ttl of 886 +/- units; 24 townhouse units; four-sty parkade with approx 1,242 stalls; a public waterfront esplanade area; new vehicle overpass at 6th Street; two pedestrian bridges; new level crossing at 8th Street.
Scope: 950,000 square feet; 7 structures; 911 units; parking for 1242 cars
Reply With Quote
     
     
  #805  
Old Posted Oct 10, 2008, 6:38 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Quote:
Originally Posted by jlousa View Post
Another cancellation, this one was expected, wonder if the Lougheed/Willingdon project will be next.

Larco Downtown Waterfront Proposal, 600-700 Block of Front St, V3W
$300,000,000 est
I think that's the parcel that New Westminster City is bidding on.
Reply With Quote
     
     
  #806  
Old Posted Oct 10, 2008, 7:05 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Maybe I'm being an optimist but indefinite hold doesn't = cancellation. It just means that, it's on hold and most likely will be pending a market turn around. Who knows though.
Reply With Quote
     
     
  #807  
Old Posted Oct 10, 2008, 8:10 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
The problem is it was already on hold during the last bust, it couldn't get going during this long extended boom I can't see it happening at a future date.
Could also explain why the City is looking at it internally.
Reply With Quote
     
     
  #808  
Old Posted Oct 12, 2008, 8:20 PM
vanman's Avatar
vanman vanman is offline
Registered User
 
Join Date: Sep 2006
Location: Vancouver BC
Posts: 6,487
A couple of random Burnaby updates from today:

Green (couple blocks south of Edmonds station)


Watercolours


Brentwood Gate


Citi


Reply With Quote
     
     
  #809  
Old Posted Oct 12, 2008, 10:06 PM
cornholio cornholio is offline
Registered User
 
Join Date: Jun 2006
Posts: 3,916
Quote:
Originally Posted by jlousa View Post
Another cancellation, this one was expected, wonder if the Lougheed/Willingdon project will be next.

CONDOMINIUM APARTMENTS & TOWNHOUSE DEVELOPMENT Proj: 7239097-6 New Westminster, Greater Vancouver RD BC CANCELLED/DEFERRED
Larco Downtown Waterfront Proposal, 600-700 Block of Front St, V3W
$300,000,000 est
Note: This project is on indefinite hold; further update in late 2009/2010.
The architect requests NO PHONE CALLS please.
Project: The proposed development may include the following: five condo towers with a ttl of 886 +/- units; 24 townhouse units; four-sty parkade with approx 1,242 stalls; a public waterfront esplanade area; new vehicle overpass at 6th Street; two pedestrian bridges; new level crossing at 8th Street.
Scope: 950,000 square feet; 7 structures; 911 units; parking for 1242 cars
Man this project has been around for ever and never seems to be able to move forward. Its almost two decades since its been approved, a few years ago they made some changes that also got aproved and still nothing. This project would improve downtown New Westminster more than any other project.
Reply With Quote
     
     
  #810  
Old Posted Oct 14, 2008, 5:39 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Quote:
Originally Posted by jlousa View Post
The problem is it was already on hold during the last bust, it couldn't get going during this long extended boom I can't see it happening at a future date.
Could also explain why the City is looking at it internally.
Good point.
Reply With Quote
     
     
  #811  
Old Posted Oct 15, 2008, 11:45 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,141
Mentioned this in the Infinity thread but figured I might as well post it here too:

Pinnacle's "The pier" development on Lonsdale in North Vancouver has been put on indefinite hold, pending new sales and a release in the credit market. The crane currently up at the site will be disassembled soon.
Reply With Quote
     
     
  #812  
Old Posted Oct 15, 2008, 11:57 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Pinnacle recently disassembled a crane at their "Success 2" tower in Toronto (and TO forummers said it would be replaced by another crane).
Reply With Quote
     
     
  #813  
Old Posted Oct 16, 2008, 12:07 AM
fever's Avatar
fever fever is offline
Senior Member
 
Join Date: Nov 2001
Posts: 2,019
Does that include the hotel at the corner of Lonsdale and Esplanade that is currently under construction?
Reply With Quote
     
     
  #814  
Old Posted Oct 16, 2008, 12:28 AM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Quote:
Originally Posted by LeftCoaster View Post
Mentioned this in the Infinity thread but figured I might as well post it here too:

Pinnacle's "The pier" development on Lonsdale in North Vancouver has been put on indefinite hold, pending new sales and a release in the credit market. The crane currently up at the site will be disassembled soon.
Shit shit shit. I was looking forward to that development more than anything. Lower Lonsdale is so depressing in its current form.

Also wondering about the hotel. Most of the building is up already. Maybe it'd be fitting to have a North Korean style skeleton right at the foot of Lonsdale.
Reply With Quote
     
     
  #815  
Old Posted Oct 16, 2008, 3:29 PM
phesto phesto is offline
Registered User
 
Join Date: Jan 2002
Location: yvr/bwi
Posts: 2,699
Quote:
Originally Posted by LeftCoaster View Post
Mentioned this in the Infinity thread but figured I might as well post it here too:

Pinnacle's "The pier" development on Lonsdale in North Vancouver has been put on indefinite hold, pending new sales and a release in the credit market. The crane currently up at the site will be disassembled soon.
Not really surprising. The pre-sales market has been dead throughout Vancouver for several weeks, from what I've heard.

How much of that project has been completed?
Reply With Quote
     
     
  #816  
Old Posted Oct 16, 2008, 3:39 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,141
Well quite a bit has been completed actually, as the project is quite large. So far to my knowledge, two towers have been completed and occupied on the north side of esplanade and the hotel which is U/C will be completed. What is stopping is the new condo which just had a crane errected and the final phases of the project which would have seen more condos and improvements to the waterfront. These will almost assuredly go ahead, just likely a few years down the road.

*I am not 100% sure on the hotel being completed, but I am assuming it will be because I only heard about the stop on the condo portion.
Reply With Quote
     
     
  #817  
Old Posted Oct 16, 2008, 5:38 PM
fever's Avatar
fever fever is offline
Senior Member
 
Join Date: Nov 2001
Posts: 2,019
So far, they've finished everything north of Esplanade: two towers both about 20 storeys, a midrise between them, and the low rise on the northeast corner at Lonsdale. The hotel is u/c and either topped out or close to it.

I guess that means the National Maritime Museum is toast, too. Was it already toast for lack of federal government funding?
Reply With Quote
     
     
  #818  
Old Posted Oct 19, 2008, 8:40 PM
Pinion Pinion is offline
See ya down under, mates
 
Join Date: Jul 2007
Posts: 5,167
Quote:
Originally Posted by LeftCoaster View Post
Mentioned this in the Infinity thread but figured I might as well post it here too:

Pinnacle's "The pier" development on Lonsdale in North Vancouver has been put on indefinite hold, pending new sales and a release in the credit market. The crane currently up at the site will be disassembled soon.
New article in the North Shore News about this. Looks like it's still going to be built, just in slow phases instead of all at once?

http://www.canada.com/northshorenews/news/story.html?id=59b03f00-fe6c-4ab5-92a3-e48a15cd1e9e

Quote:
Pinnacle plans to eventually develop a total of 13 land parcels on the waterfront site, comprising a total of 1.16 million square feet of residential and commercial floor space. Once the current construction wraps up, Pinnacle will move on to developing a 20-storey condominium tower, several lower rise residential developments, and a four-storey office building.

De Cotiis said those developments will be constructed in phases, not all at once as the developer had planned when the housing market was hot.

Although the economy has hit hard times and the market is slowing down, Penway said he's not worried about Pinnacle completing their portion of the waterfront development.

"We're hopeful. It's a good project, and it's going to keep going. This is a pause, not a stoppage."

He did speculate, however, that tough economic times might have been an incentive for Pinnacle to slow down construction. "To try and market all of these units now might not be the wisest thing to try to do."

Pinnacle is also converting several heritage shipyard buildings to be used for the proposed national maritime centre.
Reply With Quote
     
     
  #819  
Old Posted Oct 20, 2008, 11:56 PM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Lots of info regarding the Spirit Trail in the following RFP. I've saved a copy of it just in case this one dissappears as well. If someone wan'ts to take the time and dissect the info and post it that would save others some time. Enjoy.

http://www.bcbid.gov.bc.ca/open.dll/down...ID=12635551&blobID=3041686&filetype=Blob
Reply With Quote
     
     
  #820  
Old Posted Oct 21, 2008, 12:00 AM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,141
Quote:
Originally Posted by Pinion View Post
New article in the North Shore News about this. Looks like it's still going to be built, just in slow phases instead of all at once?
Well that's essentially what I was saying... but by slow phases i was more thinking indefinite hold for anything that wasn't the hotel. From what I have heard they will finish the hotel but put the rest of the project on indefinite hold until market/credit conditions improve. Then they will slowly put the project back on track. This development will still be realized, just far later that initially planned. I have a feeling we are going to be seeing a lot of this... nothing completely canceled, just deferred indefinitely.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 1:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.