Given the preference to go south first (again) but now in the context of an actual long term plan to convert the entire Transitway to light rail, this business south of Confederation has to be resolved. What are they going to do with the SE Transitway in that corridor in the long term? Convert it to light rail as well as the adjacent O-Train tracks (complete with those roller coaster overpasses once again) once they convert the Billings Bridge/Riverside portion?
|
The point I am making is that ridership has been built up over a long time period particularly to Billings Bridge and for eastward transfer at Hurdman. There is no need to unnecessarily create another transfer to go one stop to Billings Bridge, nor to provide an awkward choice to reach Hurdman, either by another transfer or a trip through downtown.
Quote:
|
Given the preference to go south first (again) but now in the context of an actual long term plan to convert the entire Transitway to light rail, this business south of Confederation has to be resolved. What are they going to do with the SE Transitway in that corridor in the long term? Convert it to light rail as well as the adjacent O-Train tracks (complete with those roller coaster overpasses once again) once they convert the Billings Bridge/Riverside portion?
|
This is not part of any of the proposals, so unless there is a change, how can it be considered? I have expressed a concern about LRT branching and balance between the east and west entrances into the downtown tunnel. Even Phase 1 with Scenario 3 has 3 branches to the west and only 1 to the east. The long-term build out has 4 branches to the west and 2 branches to the east. We can only fit so many trains into the tunnel so the interlining issue starts to become an issue. The consultants glossed over this issue just saying that train frequency will be adjusted based on demand. The whole selling point of LRT is frequent service but if demand forces most of the trains onto one line (east-west), service degrades significantly on the others. One way to balance the number of branches from the east and west is by having either the airport branch or the south branch use the SE Transitway, while the other uses the O-Train ROW. This addresses my concerns about direct service, based on ridership that has already been established, and eliminates the need to have parallel rapid transit south of Confederation. Unfortunately, this does not appear to be on the radar.