HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta


Reply

 
Thread Tools Display Modes
     
     
  #1821  
Old Posted Aug 28, 2008, 7:58 PM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
Transit board adopts bold regional plan for trains, buses

Atlanta Business Chronicle - by Dave Williams Staff Writer

A board of metro Atlanta political and transportation leaders Thursday adopted an ambitious plan for a network of bus and passenger rail lines that would criss-cross the region by 2030.

The Transit Planning Board, made up mostly of county commission chairmen and heads of the region’s transit agencies, voted unanimously to adopt “Concept 3” as a vision of what a coordinated regional transit system should look like in the coming decades.

At full build-out, Concept 3 calls for more than 500 miles of rail, including 322 miles for commuter trains and 116 miles of light rail. Another 849 miles of highway would be traveled by various bus systems. The projected capital costs of the full network would be $26.8 billion, with annual operating expenses of $1.1 billion.


Some of the major projects would be up and running in five to seven years under a fast-track strategy the plan contemplates. The price tag for that part of the work would be $10.9 billion in capital costs and $538.3 million a year for operations.


“We need to turn dirt,” Cheryl King, the board’s director, said shortly after Thursday’s vote. “People need to see some progress being made if we’re going to ask for this kind of investment.”

Concept 3 is contingent upon voter approval of a one-cent regional sales tax dedicated to transportation improvements. A telephone survey conducted for the board last March showed 58 percent support for the tax if it is tied to a specific list of projects.

Legislation that could have led to a regional referendum on transportation funding passed the Georgia House this year but failed by three votes in the Senate.

Concept 3 now goes to the Atlanta Regional Commission, the metro area’s planning agency. The ARC board is expected to decide in December whether to incorporate the document into its regional transportation planning efforts.



article

Concept 3

Last edited by smArTaLlone; Aug 28, 2008 at 8:14 PM.
Reply With Quote
     
     
  #1822  
Old Posted Aug 28, 2008, 8:30 PM
wxjay wxjay is offline
 
Join Date: Aug 2006
Posts: 111
^I'll believe it when I see it.
Reply With Quote
     
     
  #1823  
Old Posted Aug 28, 2008, 11:29 PM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
Here's the intown areas in the Concept 3 vision. In addition to the Beltline and Peachtree streetcar, it includes a streetcar on Ponce and LRT routes on Spring street, 14th street and Northside (which runs to Cumberland).


Last edited by smArTaLlone; Aug 28, 2008 at 11:40 PM.
Reply With Quote
     
     
  #1824  
Old Posted Aug 29, 2008, 5:14 AM
Fiorenza's Avatar
Fiorenza Fiorenza is offline
 
Join Date: Apr 2005
Posts: 2,551
Reply With Quote
     
     
  #1825  
Old Posted Aug 29, 2008, 12:11 PM
Terminus's Avatar
Terminus Terminus is offline
 
Join Date: Nov 2001
Posts: 2,319
Quote:
Originally Posted by Fiorenza View Post
We can only hope. I live on Spring Street in Downtown and it's a car sewer - especially after games. Making it two way would go a long way to restoring is an urban street.
Reply With Quote
     
     
  #1826  
Old Posted Aug 29, 2008, 2:53 PM
ATLaffinity ATLaffinity is offline
 
Join Date: Jul 2007
Posts: 872
Quote:
Originally Posted by Fiorenza View Post
That would be awesome. I live on Spring AND West Peachtree.

There's no way retail or anything else can thrive on one-way streets.

I see people are whining about it in the comments section. People still want the center of the city to be like a highway.
Reply With Quote
     
     
  #1827  
Old Posted Aug 29, 2008, 7:57 PM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
Quote:
Originally Posted by ATLaffinity View Post
That would be awesome. I live on Spring AND West Peachtree.

There's no way retail or anything else can thrive on one-way streets.

I see people are whining about it in the comments section. People still want the center of the city to be like a highway.
Bingo!
Reply With Quote
     
     
  #1828  
Old Posted Aug 29, 2008, 8:54 PM
Andrea Andrea is offline
 
Join Date: Oct 2005
Posts: 2,912
Quote:
Originally Posted by ATLaffinity View Post
I see people are whining about it in the comments section. People still want the center of the city to be like a highway.
Somebody get Obama on the phone. This town needs an agent for change. Like yesterday.
Reply With Quote
     
     
  #1829  
Old Posted Aug 30, 2008, 3:29 AM
Tombstoner Tombstoner is offline
 
Join Date: Jul 2006
Posts: 1,046
Quote:
Originally Posted by ATLaffinity View Post
That would be awesome. I live on Spring AND West Peachtree.

There's no way retail or anything else can thrive on one-way streets.

I see people are whining about it in the comments section. People still want the center of the city to be like a highway.
I'm not sure there is anything intrinsic in a one-way street that makes it more highway-like and less shopper-friendly--many major cities in Latin America, Europe and Asia (even NYC) have thriving retail districts lining one-way streets. It's like saying that two-way streets have to be like the Connector. We all know they don't.
Reply With Quote
     
     
  #1830  
Old Posted Aug 31, 2008, 12:18 AM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
Can a commuter rail line work in Atlanta?

By David Ibata

The Atlanta Journal-Constitution

Sunday, August 31, 2008

If commuter rail ever comes to Atlanta, what would it look like? Seven lines using existing freight railroads and extending as far as Macon and Athens have been studied for years. But only recently, with Gov. Sonny Perdue’s support of a pilot line from Five Points south to Griffin, have commuter trains had a chance of serious consideration by state policymakers.

That’s critical, because a substantial investment of public dollars will be necessary — from $100 million to $500 million per line in start-up costs, according to a report by the consulting firm of R.L. Banks & Associates. The payoff? Faster commutes, less traffic congestion and cleaner air.

The hurdles are daunting. Except for federal monies pledged for the Griffin line, there are no identified sources of capital and operating funds, no locomotives or passenger coaches on hand, no stations or parking lots ready for riders.

Existing freight lines are crowded with their own traffic. Most haven’t seen passenger trains since shortly after the Crackers left Ponce de Leon Avenue, and one is in such marginal condition its speed limit is 10 mph.

On a positive note, the Transit Planning Board last week made commuter rail a key component in its final, comprehensive plan for public transportation in metro Atlanta.

In December 2007, R.L. Banks delivered a study updating the seven commuter rail plans for the TPB, Metro Atlanta Chamber of Commerce, and Georgia Department of Transportation.


WHAT IS COMMUTER RAIL?

• Heavy conventional passenger equipment like Amtrak’s, with diesel locomotives pulling coaches over existing rail lines.

• Trains would make scheduled stops inbound to the city in the morning and outbound to the suburbs in the afternoon.

• Service would range far beyond MARTA’s territory, possibly as far as Athens and Macon.

• All lines would converge on a proposed “Multi-Modal Passenger Terminal” next to the MARTA Five Points station.
Reply With Quote
     
     
  #1831  
Old Posted Aug 31, 2008, 4:17 AM
Andrea Andrea is offline
 
Join Date: Oct 2005
Posts: 2,912
This is very exciting. I hope it really happens.

Here's an interesting PowerPoint that the consultants presented to the Transportation Planning Board.

Reply With Quote
     
     
  #1832  
Old Posted Aug 31, 2008, 3:16 PM
NativeAtlantan's Avatar
NativeAtlantan NativeAtlantan is offline
 
Join Date: Dec 2003
Posts: 400
I'm sure that Waycross to Jesup line will be up-and-running quite soon.
Reply With Quote
     
     
  #1833  
Old Posted Aug 31, 2008, 10:35 PM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
I'm not sure what that map is all about. We'll be lucky to finally get the Griffin commuter line going.
Reply With Quote
     
     
  #1834  
Old Posted Aug 31, 2008, 11:15 PM
Pessimistic Observer Pessimistic Observer is offline
 
Join Date: Aug 2008
Posts: 267
Quote:
Originally Posted by smArTaLlone View Post
I'm not sure what that map is all about. We'll be lucky to finally get the Griffin commuter line going.
when you guys say about to get it going you mean in like 5-10 yrs right
Reply With Quote
     
     
  #1835  
Old Posted Sep 1, 2008, 1:22 AM
trainiac's Avatar
trainiac trainiac is offline
 
Join Date: Feb 2006
Posts: 1,064
Quote:
Originally Posted by Andrea View Post
This is very exciting. I hope it really happens.

Here's an interesting PowerPoint that the consultants presented to the Transportation Planning Board.

Boy, I'd love to be able to take a train from Atlanta to Savannah. Bring back the Nancy Hanks!
Reply With Quote
     
     
  #1836  
Old Posted Sep 1, 2008, 4:54 AM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
Quote:
Originally Posted by Pessimistic Observer View Post
when you guys say about to get it going you mean in like 5-10 yrs right
Reguarding the commuter line to Griffin, I'm not sure of the timetable but the DOT is moving forward on it. I believe one of the reasons they made this the pilot route is that it would be the easiest to implement so I would think it could be done within 5 years.
Reply With Quote
     
     
  #1837  
Old Posted Sep 1, 2008, 3:14 PM
catlike's Avatar
catlike catlike is offline
 
Join Date: Sep 2005
Posts: 252
Quote:
Originally Posted by Tombstoner View Post
I'm not sure there is anything intrinsic in a one-way street that makes it more highway-like and less shopper-friendly--many major cities in Latin America, Europe and Asia (even NYC) have thriving retail districts lining one-way streets. It's like saying that two-way streets have to be like the Connector. We all know they don't.
What I've understood is that traffic tends to travel slower on two-way streets as opposed to one-way, most likely because of the perception that oncoming traffic is traveling at twice the speed, which suppresses the impulse to speed. Sure, there are one-way streets with thriving shopping in other parts of the world, but are drivers able to do 40+mph down them as they do on Atlanta streets? The issue here is that when cars are zooming down four-lane, one-way streets with no parking lane, drivers are less likely to notice what's on the sidewalk (stores) and pedestrians are at the mercy of speeding cars when crossing the streets.
Reply With Quote
     
     
  #1838  
Old Posted Sep 2, 2008, 2:03 AM
netdragon netdragon is offline
 
Join Date: Mar 2007
Posts: 203
Quote:
Originally Posted by smArTaLlone View Post
Weird, there's some "town" named Edna on the map between Vinings and Mableton on what looks like what used to be called the village of Gilmore (corner of Atlanta Rd and Cumberland Pkwy). Not sure what Edna is... Never heard of it. Maybe it's the dried up Main Street area near the back-side of Ace Hardware off Atlanta Rd?

Quote:
Originally Posted by trainiac View Post
Boy, I'd love to be able to take a train from Atlanta to Savannah. Bring back the Nancy Hanks!
A high-speed train between here and Savannah + Hilton Head would be great for trips to the beach. It'd have to be something faster than standard passenger rail, though, for it to really link Savannah and Atlanta.

I think with Savannah being a large port, the people (not just freight), really should be linked between these two cities.

Quote:
Originally Posted by catlike View Post
What I've understood is that traffic tends to travel slower on two-way streets as opposed to one-way, most likely because of the perception that oncoming traffic is traveling at twice the speed, which suppresses the impulse to speed. Sure, there are one-way streets with thriving shopping in other parts of the world, but are drivers able to do 40+mph down them as they do on Atlanta streets? The issue here is that when cars are zooming down four-lane, one-way streets with no parking lane, drivers are less likely to notice what's on the sidewalk (stores) and pedestrians are at the mercy of speeding cars when crossing the streets.
And unlike NYC, you can't just go down into the subway station on one side of the Avenue and come up on the other side (or diagonally cross 5 blocks in some station tunnels in NYC ). Still, better pedestrian planning may serve the need without grinding traffic to a halt. There are already some pedestrian crossing zones around... I think with some extra stoplights, and a few more crossing zones, and some well-placed medians would make being a pedestrian easier without getting rid of the one-ways.

Last edited by netdragon; Sep 2, 2008 at 2:15 AM.
Reply With Quote
     
     
  #1839  
Old Posted Sep 2, 2008, 2:47 AM
netdragon netdragon is offline
 
Join Date: Mar 2007
Posts: 203
Concept 3 is still flawed. It has the Marietta line ending in Bolton. That's pretty crazy, especially considering that a funding source for the line to Marietta using W&A has already has been identified. It's too Atlanta-centric as well.

I don't believe Smyrna, Marietta and Cumberland residents should support Concept 3 unless it adds in the Marietta rail line through the center of these areas and scales down the ridiculously expensive BRT plans along I-75, which is mostly going to favor the relatively poor populations that live right along I-75 North of Windy Hill.

I did notice a disclaimer at the bottom of the Concept 3 diagram that it's only generalized. Not sure to what degree they are talking about.
Reply With Quote
     
     
  #1840  
Old Posted Sep 2, 2008, 4:30 AM
smArTaLlone smArTaLlone is offline
 
Join Date: Feb 2005
Posts: 8,813
Marietta line ending in Bolton? Huh?
Also the map shows an express bus route on 75 but no BRT.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 10:16 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.